HET PROJECT VOORZIET IN DE TOTALE INTERNE HERONTWIKKELING VAN EEN BESTAAND HOTEL, MAAR TOT OP HEDEN GESLOTEN VOOR MEER DAN TWEE JAAR, HEEFT ARLI SRL IN FEITE NIET DIRECT HETZELFDE BEHEERD, MAAR ZAL OOK MANAGER WORDEN OM HERKWALIFICATIEWERKZAAMHEDEN TE VOLTOOIEN, HET ELEKTRISCHE SYSTEEM ZAL VOLLEDIG WORDEN HERBOUWD, EVENALS WINDOWS EN WINDOWS MET BEHULP VAN ECO-COMPATIBELE MATERIALEN EN MET MINDER ENERGIE- EN MILIEU-IMPACT. DE VERLICHTING WORDT VOLLEDIG HERZIEN, ZOWEL IN DE LICHTPUNTEN MET LED-VERLICHTING ALS IN DE AAN/UITSTANDEN OM HET VERBRUIK TE OPTIMALISEREN (Dutch) | |||||||||||||||
Property / summary: HET PROJECT VOORZIET IN DE TOTALE INTERNE HERONTWIKKELING VAN EEN BESTAAND HOTEL, MAAR TOT OP HEDEN GESLOTEN VOOR MEER DAN TWEE JAAR, HEEFT ARLI SRL IN FEITE NIET DIRECT HETZELFDE BEHEERD, MAAR ZAL OOK MANAGER WORDEN OM HERKWALIFICATIEWERKZAAMHEDEN TE VOLTOOIEN, HET ELEKTRISCHE SYSTEEM ZAL VOLLEDIG WORDEN HERBOUWD, EVENALS WINDOWS EN WINDOWS MET BEHULP VAN ECO-COMPATIBELE MATERIALEN EN MET MINDER ENERGIE- EN MILIEU-IMPACT. DE VERLICHTING WORDT VOLLEDIG HERZIEN, ZOWEL IN DE LICHTPUNTEN MET LED-VERLICHTING ALS IN DE AAN/UITSTANDEN OM HET VERBRUIK TE OPTIMALISEREN (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: HET PROJECT VOORZIET IN DE TOTALE INTERNE HERONTWIKKELING VAN EEN BESTAAND HOTEL, MAAR TOT OP HEDEN GESLOTEN VOOR MEER DAN TWEE JAAR, HEEFT ARLI SRL IN FEITE NIET DIRECT HETZELFDE BEHEERD, MAAR ZAL OOK MANAGER WORDEN OM HERKWALIFICATIEWERKZAAMHEDEN TE VOLTOOIEN, HET ELEKTRISCHE SYSTEEM ZAL VOLLEDIG WORDEN HERBOUWD, EVENALS WINDOWS EN WINDOWS MET BEHULP VAN ECO-COMPATIBELE MATERIALEN EN MET MINDER ENERGIE- EN MILIEU-IMPACT. DE VERLICHTING WORDT VOLLEDIG HERZIEN, ZOWEL IN DE LICHTPUNTEN MET LED-VERLICHTING ALS IN DE AAN/UITSTANDEN OM HET VERBRUIK TE OPTIMALISEREN (Dutch) / qualifier | |||||||||||||||
point in time: 23 December 2021
|
Revision as of 18:34, 23 December 2021
Project Q2065859 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_074_2015_0740081_1090) |
Project Q2065859 in Italy |
Statements
25,978.79 Euro
0 references
51,957.58 Euro
0 references
50.0 percent
0 references
13 March 2015
0 references
6 December 2018
0 references
13 March 2017
0 references
ARLI S.R.L.
0 references
IL PROGETTO PREVEDE LA TOTALE RIQUALIFICAZIONE INTERNA DI UN ALBERGO GIA ESISTENTE MA AD OGGI CHIUSO DA OLTRE DUE ANNI LA PROPRIETA ARLI SRL NON GESTIVA DIRETTAMENTE INFATTI LO STESSO MA NE DIVENTERA ANCHE GESTORE A COMPLETAMENTO OPERE DI RIQUALIFICAZIONE L'IMPIANTO ELETTRICO VERRA COMPLETAMENTE RIFATTO, COSI COME GLI INFISSI E LE FINESTRE UTILIZZANDO MATERIALI ECO COMPATIBILI E A MINOR IMPATTO ENERGETICO ED AMBIENTALE. L'ILLUMINAZIONE VERRA RIVISTA COMPLETAMENTE, SIA NEI PUNTI LUCE CON ILLUMINAZIONE A LED CHE NELLE MODALITA DI ACCENSIONE/SPEGNIMENTO PER L'OTTIMIZZAZIONE DEI CONSUMI (Italian)
0 references
THE PROJECT PROVIDES FOR THE TOTAL INTERNAL REDEPLOYMENT OF A HOTEL ALREADY IN EXISTENCE, BUT HAS NOW BEEN CLOSED FOR MORE THAN TWO YEARS BY THE OWNERSHIP OF THE PROPERTY ARLI SRL, NOT DIRECTLY MANAGING THE PROJECT ITSELF, BUT IS ALSO NOT MANAGING IT, BUT IS ALSO MANAGING THE ELECTRICITY SYSTEM TO COMPLETE THE POWER PLANT IN ORDER TO COMPLETE THE ELECTRICITY SYSTEM, AS WELL AS THE WINDOWS AND WINDOWS USING COMPATIBLE ECO MATERIALS WITH A LOWER ENERGY AND ENVIRONMENTAL IMPACT. THE ILLUMINATION WILL BE COMPLETELY REVISED, BOTH IN THE LIGHT AND IN THE LIGHT BULBS, AND IN THE LIGHT/OFF MODE FOR OPTIMISATION OF CONSUMPTION. (English)
0 references
LE PROJET PRÉVOIT LE RÉAMÉNAGEMENT INTERNE TOTAL D’UN HÔTEL EXISTANT, MAIS À CE JOUR FERMÉ PENDANT PLUS DE DEUX ANS, LA PROPRIÉTÉ ARLI SRL N’A PAS GÉRÉ DIRECTEMENT LA MÊME CHOSE, MAIS DEVIENDRA ÉGALEMENT GESTIONNAIRE POUR ACHEVER LES TRAVAUX DE REQUALIFICATION, LE SYSTÈME ÉLECTRIQUE SERA ENTIÈREMENT RECONSTRUIT, AINSI QUE WINDOWS ET WINDOWS À L’AIDE DE MATÉRIAUX ÉCO-COMPATIBLES ET AVEC MOINS D’IMPACT ÉNERGÉTIQUE ET ENVIRONNEMENTAL. L’ÉCLAIRAGE SERA ENTIÈREMENT RÉVISÉ, TANT DANS LES POINTS LUMINEUX AVEC ÉCLAIRAGE MENÉ QUE DANS LES MODES MARCHE/ARRÊT POUR OPTIMISER LA CONSOMMATION (French)
16 December 2021
0 references
HET PROJECT VOORZIET IN DE TOTALE INTERNE HERONTWIKKELING VAN EEN BESTAAND HOTEL, MAAR TOT OP HEDEN GESLOTEN VOOR MEER DAN TWEE JAAR, HEEFT ARLI SRL IN FEITE NIET DIRECT HETZELFDE BEHEERD, MAAR ZAL OOK MANAGER WORDEN OM HERKWALIFICATIEWERKZAAMHEDEN TE VOLTOOIEN, HET ELEKTRISCHE SYSTEEM ZAL VOLLEDIG WORDEN HERBOUWD, EVENALS WINDOWS EN WINDOWS MET BEHULP VAN ECO-COMPATIBELE MATERIALEN EN MET MINDER ENERGIE- EN MILIEU-IMPACT. DE VERLICHTING WORDT VOLLEDIG HERZIEN, ZOWEL IN DE LICHTPUNTEN MET LED-VERLICHTING ALS IN DE AAN/UITSTANDEN OM HET VERBRUIK TE OPTIMALISEREN (Dutch)
23 December 2021
0 references
Identifiers
D58I15001740009
0 references