CONSTRUCTION OF A PARAMASSI TUNNEL — LOT SP 31 OF RIPA (Q2040752): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
BOUW VAN EEN PARAMAX TUNNEL — DE SP 31 LOT RIPA
Property / summary
 
REALISATIE VAN HET EERSTE PERCEEL VAN DE S.P.31 RIPA WEG IN HET GEDEELTE AFGESLOTEN VOOR VERKEER VANAF 17 AUGUSTUS 2015 (SP) EN NU OPNIEUW GEOPEND IN AFWISSELEND EENRICHTINGSVERKEER (Dutch)
Property / summary: REALISATIE VAN HET EERSTE PERCEEL VAN DE S.P.31 RIPA WEG IN HET GEDEELTE AFGESLOTEN VOOR VERKEER VANAF 17 AUGUSTUS 2015 (SP) EN NU OPNIEUW GEOPEND IN AFWISSELEND EENRICHTINGSVERKEER (Dutch) / rank
 
Normal rank
Property / summary: REALISATIE VAN HET EERSTE PERCEEL VAN DE S.P.31 RIPA WEG IN HET GEDEELTE AFGESLOTEN VOOR VERKEER VANAF 17 AUGUSTUS 2015 (SP) EN NU OPNIEUW GEOPEND IN AFWISSELEND EENRICHTINGSVERKEER (Dutch) / qualifier
 
point in time: 23 December 2021
Timestamp+2021-12-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:04, 23 December 2021

Project Q2040752 in Italy
Language Label Description Also known as
English
CONSTRUCTION OF A PARAMASSI TUNNEL — LOT SP 31 OF RIPA
Project Q2040752 in Italy

    Statements

    0 references
    1,347,934.74 Euro
    0 references
    3,207,000.0 Euro
    0 references
    42.03 percent
    0 references
    7 March 2016
    0 references
    31 December 2019
    0 references
    REGIONE LIGURIA
    0 references
    0 references
    0 references

    44°8'30.08"N, 9°53'19.28"E
    0 references
    REALIZZAZIONE DEL PRIMO LOTTO DELLA S.P.31 STRADA DELLA RIPA NEL TRATTO CHIUSO AL TRAFFICO DAL 17 AGOSTO 2015 (SP) E OGGI RIAPERTO A SENSO UNICO ALTERNATO (Italian)
    0 references
    IMPLEMENTATION OF THE FIRST BATCH OF THE RIPA ROAD IN THE CLOSED SECTION OF THE TRAFFIC FROM 17 AUGUST 2015 (SP) AND NOW REOPENED ON A SOLE ALTERNATE BASIS (English)
    0 references
    RÉALISATION DU PREMIER LOT DE LA ROUTE S.P.31 RIPA DANS LE TRONÇON FERMÉ À LA CIRCULATION À PARTIR DU 17 AOÛT 2015 (SP) ET MAINTENANT ROUVERT EN ALTERNANCE ALLER SIMPLE (French)
    16 December 2021
    0 references
    REALISATIE VAN HET EERSTE PERCEEL VAN DE S.P.31 RIPA WEG IN HET GEDEELTE AFGESLOTEN VOOR VERKEER VANAF 17 AUGUSTUS 2015 (SP) EN NU OPNIEUW GEOPEND IN AFWISSELEND EENRICHTINGSVERKEER (Dutch)
    23 December 2021
    0 references

    Identifiers

    G27H17001030003
    0 references