SAFETY IN THE PROCESS OF MANAGING MOLINATURA AND STAFF INVOLVED (Q2035553): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
VEILIGHEID IN HET SLIJP- EN PERSONEELSBEHEERPROCES | |||||||||||||||
Property / summary | |||||||||||||||
HET VOORGESTELDE Ê-PROJECT HEEFT ALLEEN BETREKKING OP HET DEEL VAN DE INVESTERINGEN DAT OLIEFABRIEKEN IN HET LEVEN ROEPEN OM DE VEILIGHEID EN DE TOTALE KWALITEIT VAN HET EIND-TOT-EINDPROCES VOOR HET MALEN VAN OLIJVEN EN DE PRODUCTIE VAN DE BEKENDE OLIJFOLIE TE WAARBORGEN. (Dutch) | |||||||||||||||
Property / summary: HET VOORGESTELDE Ê-PROJECT HEEFT ALLEEN BETREKKING OP HET DEEL VAN DE INVESTERINGEN DAT OLIEFABRIEKEN IN HET LEVEN ROEPEN OM DE VEILIGHEID EN DE TOTALE KWALITEIT VAN HET EIND-TOT-EINDPROCES VOOR HET MALEN VAN OLIJVEN EN DE PRODUCTIE VAN DE BEKENDE OLIJFOLIE TE WAARBORGEN. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: HET VOORGESTELDE Ê-PROJECT HEEFT ALLEEN BETREKKING OP HET DEEL VAN DE INVESTERINGEN DAT OLIEFABRIEKEN IN HET LEVEN ROEPEN OM DE VEILIGHEID EN DE TOTALE KWALITEIT VAN HET EIND-TOT-EINDPROCES VOOR HET MALEN VAN OLIJVEN EN DE PRODUCTIE VAN DE BEKENDE OLIJFOLIE TE WAARBORGEN. (Dutch) / qualifier | |||||||||||||||
point in time: 23 December 2021
|
Revision as of 15:21, 23 December 2021
Project Q2035553 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | SAFETY IN THE PROCESS OF MANAGING MOLINATURA AND STAFF INVOLVED |
Project Q2035553 in Italy |
Statements
35,577.78 Euro
0 references
71,155.56 Euro
0 references
50.0 percent
0 references
10 February 2017
0 references
28 November 2018
0 references
26 November 2018
0 references
OLEIFICIO DEI FIORI SRL
0 references
IL PROGETTO PROPOSTO Ê RELATIVO ALLA SOLA PARTE DEGLI INVESTIMENTI CHE OLEIFICIO DEI FIORI STA IMPOSTANDO PER GARANTIRE LA SICUREZZA E LA TOTALE QUALITà DEL PROCESSO END-TO-END DI MOLINATURA DELLE OLIVE E DI PRODUZIONE DEL SUO RINOMATO OLIO DI OLIVA (Italian)
0 references
THE PROPOSED PROJECT APPLIES ONLY TO THE PART OF THE INVESTMENTS WHICH THE FLOWER MANUFACTURE IS SETTING TO ENSURE THE SAFETY AND TOTAL QUALITY OF THE END OF THE END OF THE END OF THE OLIVES AND PRODUCTION OF THE OLIVE OIL RENOWNED. (English)
0 references
LE PROJET PROPOSÉ ÀŠ NE CONCERNE QUE LA PARTIE DES INVESTISSEMENTS QUE LE MOULIN À HUILE EST EN TRAIN DE METTRE EN PLACE POUR ASSURER LA SÉCURITÉ ET LA QUALITÉ TOTALE DU PROCESSUS DE MOUTURE D’OLIVE DE BOUT EN BOUT ET LA PRODUCTION DE SON HUILE D’OLIVE RENOMMÉE (French)
16 December 2021
0 references
HET VOORGESTELDE Ê-PROJECT HEEFT ALLEEN BETREKKING OP HET DEEL VAN DE INVESTERINGEN DAT OLIEFABRIEKEN IN HET LEVEN ROEPEN OM DE VEILIGHEID EN DE TOTALE KWALITEIT VAN HET EIND-TOT-EINDPROCES VOOR HET MALEN VAN OLIJVEN EN DE PRODUCTIE VAN DE BEKENDE OLIJFOLIE TE WAARBORGEN. (Dutch)
23 December 2021
0 references
Identifiers
F53G17000400007
0 references