Implementation of sewage sewage networks connected to the Quinta de Cima sewage plant (Q2982399): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
Implementatie van rioolwaterzuiveringsnetwerken gekoppeld aan de Quinta de Cima WWTP
Property / summary
 
De operatie bestaat uit de uitvoering van 7 615,07 ml gravitische verzamelaars en een hijspijp met een totale uitbreiding van 472 ml en 277 verbindingstakken, met aansluiting op het zeefsubsysteem.De operatie omvat de bouw van subbekken die de plaatsen van Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Vendas dos Mills zullen afvoeren die de zwaartekracht van de effluenten met verbinding met de afgezant op hoog niveau zullen waarborgen. (Dutch)
Property / summary: De operatie bestaat uit de uitvoering van 7 615,07 ml gravitische verzamelaars en een hijspijp met een totale uitbreiding van 472 ml en 277 verbindingstakken, met aansluiting op het zeefsubsysteem.De operatie omvat de bouw van subbekken die de plaatsen van Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Vendas dos Mills zullen afvoeren die de zwaartekracht van de effluenten met verbinding met de afgezant op hoog niveau zullen waarborgen. (Dutch) / rank
 
Normal rank
Property / summary: De operatie bestaat uit de uitvoering van 7 615,07 ml gravitische verzamelaars en een hijspijp met een totale uitbreiding van 472 ml en 277 verbindingstakken, met aansluiting op het zeefsubsysteem.De operatie omvat de bouw van subbekken die de plaatsen van Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Vendas dos Mills zullen afvoeren die de zwaartekracht van de effluenten met verbinding met de afgezant op hoog niveau zullen waarborgen. (Dutch) / qualifier
 
point in time: 20 December 2021
Timestamp+2021-12-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:16, 20 December 2021

Project Q2982399 in Portugal
Language Label Description Also known as
English
Implementation of sewage sewage networks connected to the Quinta de Cima sewage plant
Project Q2982399 in Portugal

    Statements

    0 references
    526,084.0 Euro
    0 references
    618,922.0 Euro
    0 references
    85.0 percent
    0 references
    30 September 2015
    0 references
    31 March 2018
    0 references
    MUNICÍPIO DE PENELA
    0 references
    Q2990366 (Deleted Item)
    0 references
    0 references

    40°1'45.98"N, 8°23'24.86"W
    0 references
    A operação consiste na execução de 7.615,07ml de coletores gravíticos e uma conduta elevatória numa extensão total de 472ml e 277 ramais de ligação, com ligação ao subsistema de penela.A operação contempla a construção de sub-bacias que irão drenar os lugares de Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Vendas dos Moinhos que assegurarão o transporte gravítico dos efluentes com ligação ao emissário “em alta”. (Portuguese)
    0 references
    The operation consists of the execution of 7615.07 ml of gravitic collectors and a lifting duct in a total length of 472 ml and 277 connecting branches, with connection to the penella subsystem.The operation includes the construction of sub-basins that will drain the places of Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Sales of Mills that will ensure the gravitational transport of the effluents with connection to the emissary in high. (English)
    9 July 2021
    0 references
    L’opération consiste en l’exécution de 7 615,07 ml de collecteurs gravitiques et d’un tuyau de levage avec une extension totale de 472 ml et 277 branches de raccordement, avec raccordement au sous-système de tamis.L’opération comprend la construction de sous-bassins qui draineront les lieux de Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Vendas dos Mills qui assureront le transport gravitationnel des effluents avec connexion à l’émissaire à haute altitude. (French)
    7 December 2021
    0 references
    Der Betrieb besteht in der Ausführung von 7 615,07 ml gravitischen Kollektoren und einem Heberohr mit einer Gesamterweiterung von 472 ml und 277 Anschlusszweigen, mit Anschluss an das Sieb-Subsystem.Die Operation umfasst den Bau von Unterbecken, die die Orte Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Vendas dos Mills entwässern, die den Gravitationstransport der Abwässer mit Verbindung zum Emissary auf hoher Ebene sicherstellen. (German)
    15 December 2021
    0 references
    De operatie bestaat uit de uitvoering van 7 615,07 ml gravitische verzamelaars en een hijspijp met een totale uitbreiding van 472 ml en 277 verbindingstakken, met aansluiting op het zeefsubsysteem.De operatie omvat de bouw van subbekken die de plaatsen van Espinheiro, Santo Amaro, Covão, Serradas da Freixiosa, Grocinas, Vendas dos Mills zullen afvoeren die de zwaartekracht van de effluenten met verbinding met de afgezant op hoog niveau zullen waarborgen. (Dutch)
    20 December 2021
    0 references
    Penela
    0 references

    Identifiers

    POSEUR-03-2012-FC-000565
    0 references