Strengthening the Institutional Capacity of Social Partners with Coxia in the CPCS (Q2977975): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
Versterking van de institutionele opleiding van sociale partners met zetel in het CPCS | |||||||||||||||
Property / summary | |||||||||||||||
In de periode van 1 oktober 2019 tot en met 31/12/2019 is het GLB van plan om in het kader van de POISE de institutionele capaciteit van de sociale partners in het kader van het CPCS te versterken, de modernisering van prioritaire investeringen op de arbeidsmarkt, prioritaire as 10 ter bevordering van duurzaamheid en kwaliteit van de werkgelegenheid, een reeks van twaalf activiteiten ter bevordering van de werkgelegenheid en de sociale cohesie in de sector waarin zij actief zijn. (Dutch) | |||||||||||||||
Property / summary: In de periode van 1 oktober 2019 tot en met 31/12/2019 is het GLB van plan om in het kader van de POISE de institutionele capaciteit van de sociale partners in het kader van het CPCS te versterken, de modernisering van prioritaire investeringen op de arbeidsmarkt, prioritaire as 10 ter bevordering van duurzaamheid en kwaliteit van de werkgelegenheid, een reeks van twaalf activiteiten ter bevordering van de werkgelegenheid en de sociale cohesie in de sector waarin zij actief zijn. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: In de periode van 1 oktober 2019 tot en met 31/12/2019 is het GLB van plan om in het kader van de POISE de institutionele capaciteit van de sociale partners in het kader van het CPCS te versterken, de modernisering van prioritaire investeringen op de arbeidsmarkt, prioritaire as 10 ter bevordering van duurzaamheid en kwaliteit van de werkgelegenheid, een reeks van twaalf activiteiten ter bevordering van de werkgelegenheid en de sociale cohesie in de sector waarin zij actief zijn. (Dutch) / qualifier | |||||||||||||||
point in time: 20 December 2021
|
Revision as of 08:34, 20 December 2021
Project Q2977975 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Strengthening the Institutional Capacity of Social Partners with Coxia in the CPCS |
Project Q2977975 in Portugal |
Statements
281,996.0 Euro
0 references
331,760.0 Euro
0 references
85.0 percent
0 references
1 October 2019
0 references
31 December 2020
0 references
CONFEDERAÇÃO DOS AGRICULTORES DE PORTUGAL
0 references
Q3003304 (Deleted Item)
0 references
Durante o período de 1/10/2019 a 31/12/2019, a CAP pretende realizar no âmbito do POISE, reforço da capacidade institucional dos parceiros sociais com assento na CPCS, prioridade investimento modernização do mercado de trabalho, do eixo prioritário 10 promover a sustentabilidade e a qualidade do emprego, um conjunto de 12 atividades de forma a promover o emprego e a coesão social no seu setor de atuação (Portuguese)
0 references
During the period from 1/10/2019 to 31/12/2019, CAP intends to implement within the framework of the POISE, strengthening the institutional capacity of social partners with coxia in the CPCS, priority investment modernisation of the labour market, priority 10 promoting sustainability and quality of employment, a set of 12 activities in order to promote employment and social cohesion in its sector of activity (English)
9 July 2021
0 references
Au cours de la période allant du 1er octobre 2019 au 31 décembre 2019, la PAC a l’intention de réaliser, dans le cadre du POISE, le renforcement de la capacité institutionnelle des partenaires sociaux basés dans le SCPC, la modernisation prioritaire des investissements du marché du travail, l’axe prioritaire 10 visant à promouvoir la durabilité et la qualité de l’emploi, un ensemble de 12 activités visant à promouvoir l’emploi et la cohésion sociale dans son secteur d’activité (French)
7 December 2021
0 references
Im Zeitraum vom 1.10.2019 bis zum 31.12.2019 beabsichtigt die GAP, im Rahmen des POISE die institutionellen Kapazitäten der im CPCS ansässigen Sozialpartner zu stärken, vorrangige Investitionen auf dem Arbeitsmarkt zu modernisieren, Prioritätsachse 10 zur Förderung von Nachhaltigkeit und Qualität der Beschäftigung, 12 Tätigkeiten zur Förderung der Beschäftigung und des sozialen Zusammenhalts in ihrem Tätigkeitsbereich (German)
15 December 2021
0 references
In de periode van 1 oktober 2019 tot en met 31/12/2019 is het GLB van plan om in het kader van de POISE de institutionele capaciteit van de sociale partners in het kader van het CPCS te versterken, de modernisering van prioritaire investeringen op de arbeidsmarkt, prioritaire as 10 ter bevordering van duurzaamheid en kwaliteit van de werkgelegenheid, een reeks van twaalf activiteiten ter bevordering van de werkgelegenheid en de sociale cohesie in de sector waarin zij actief zijn. (Dutch)
20 December 2021
0 references
Identifiers
POISE-01-3726-FSE-000015
0 references