MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED INLAND PORT SYSTEM OF NAPOL’ A3 — SURFACE CLEAN-UP OF UNEXPLODED REMNANTS OF WAR ON THE AREAS AFFECTED BY THE CABLE (Q2023264): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item: Label in wikidata changed) |
||
label / en | label / en | ||
MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED INLAND PORT SYSTEM OF NAPOL’ A3 — SURFACE CLEAN-UP OF UNEXPLODED REMNANTS OF WAR ON THE AREAS AFFECTED BY THE CABLE |
Revision as of 08:59, 17 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | MAJOR LOGISTICS PROJECT AND PORTS. INTEGRATED INLAND PORT SYSTEM OF NAPOL’ A3 — SURFACE CLEAN-UP OF UNEXPLODED REMNANTS OF WAR ON THE AREAS AFFECTED BY THE CABLE |
Project in Italy financed by DG Regio |
Statements
3,750,000.0 Euro
0 references
5,000,000.0 Euro
0 references
75.0 percent
0 references
28 February 2015
0 references
1 January 2020
0 references
AUTORITA' DI SISTEMA PORTUALE DEL MAR TIRRENO CENTRALE
0 references
LA PRIMA ATTIVITà SARà QUELLA DELLO STUDIO DEL RILIEVO BATIMETRICO ESISTENTE AL FINE DI OTTIMIZZARE L'IMPIEGO DEGLI STRUMENTI DI RICERCA E DI MAPPATURA DI EVENTUALI RESIDUATI BELLICI. SUCCESSIVAMENTE SI PROVVEDERà AD UNA PROSPEZIONE CON IDONEA STRUMENTAZIONE CAPACE DI INDIVIDUARE I BERSAGLI GIACENTI SUL FONDALE.POI SI PROVVEDERà AD UN RILIEVO CHE VERRà ESEGUITO NELLE 'AREE BERSAGLIO' GIà INDIVIDUATE CON LA PRECEDENTE STRUMENTAZIONE AL FINE DI RILEVARE LA PRESENZA DI OGGETTI METALLICI. AL TERMINE DELLA VERIFICA SI PROVVEDERà ALLE EVENTUALI OPERAZIONI DI BONIFICA CHE DOVRANNO ESSERE ESEGUITE DA OPERATORI SPECIALISTI TRAMITE AMMINISTRAZIONI COMPETENTI. ESSENDO GLI INTERVENTI IN ARGOMENTO OPERAZIONI DI PROSPEZIONE E DI INDAGINE E NON DI SCAVO NON SI RITIENE INDISPENSABILE LA PRESENZA DI ARCHEOLOGI SUBACQUEI E QUINDI NON Ê STATA ELABORATA LA RELAZIONE DELLA VALUTAZIONE DEL RISCHIO ARCHEOLOGICO. (Italian)
0 references
Identifiers
I69G12000080006
0 references