DIRECTOR SIMERI-MUCONE (Q2021716): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
DIRECTEUR SIMERI-MUCONE | |||||||||||||||
Property / summary | |||||||||||||||
DIT PROJECT HEEFT BETREKKING OP DE AANPASSING VAN DE TRANSPORTLIJN SIMERI-CATANZARO 150 KV DOOR DE VERVANGING VAN GELEIDERS DOOR INNOVATIEVE HOOGVERMOGEN GELEIDERS (ALUMINIUMLEGERING (ZTAL) KABELGELEIDERS — ALUMINIUM-GECOATE FE-NI-LEGERING (ACI) 22,75 MM), INSTALLATIE VAN TECHNOLOGISCH GEAVANCEERDE COMPONENTEN ZOALSPHASORMEETEENHEID BIJ DE S.E. VAN CATANZARO, CALUSIA EN MUCONE EN DE INSTALLATIE VAN EEN TRANSFORMATOR VOOR PLANTAARDIGE OLIE (NIEUWE GENERATIE) IN HET CATANZARO-STATION. (Dutch) | |||||||||||||||
Property / summary: DIT PROJECT HEEFT BETREKKING OP DE AANPASSING VAN DE TRANSPORTLIJN SIMERI-CATANZARO 150 KV DOOR DE VERVANGING VAN GELEIDERS DOOR INNOVATIEVE HOOGVERMOGEN GELEIDERS (ALUMINIUMLEGERING (ZTAL) KABELGELEIDERS — ALUMINIUM-GECOATE FE-NI-LEGERING (ACI) 22,75 MM), INSTALLATIE VAN TECHNOLOGISCH GEAVANCEERDE COMPONENTEN ZOALSPHASORMEETEENHEID BIJ DE S.E. VAN CATANZARO, CALUSIA EN MUCONE EN DE INSTALLATIE VAN EEN TRANSFORMATOR VOOR PLANTAARDIGE OLIE (NIEUWE GENERATIE) IN HET CATANZARO-STATION. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: DIT PROJECT HEEFT BETREKKING OP DE AANPASSING VAN DE TRANSPORTLIJN SIMERI-CATANZARO 150 KV DOOR DE VERVANGING VAN GELEIDERS DOOR INNOVATIEVE HOOGVERMOGEN GELEIDERS (ALUMINIUMLEGERING (ZTAL) KABELGELEIDERS — ALUMINIUM-GECOATE FE-NI-LEGERING (ACI) 22,75 MM), INSTALLATIE VAN TECHNOLOGISCH GEAVANCEERDE COMPONENTEN ZOALSPHASORMEETEENHEID BIJ DE S.E. VAN CATANZARO, CALUSIA EN MUCONE EN DE INSTALLATIE VAN EEN TRANSFORMATOR VOOR PLANTAARDIGE OLIE (NIEUWE GENERATIE) IN HET CATANZARO-STATION. (Dutch) / qualifier | |||||||||||||||
point in time: 23 December 2021
|
Revision as of 13:11, 23 December 2021
Project Q2021716 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | DIRECTOR SIMERI-MUCONE |
Project Q2021716 in Italy |
Statements
1,139,758.92 Euro
0 references
1,542,801.01 Euro
0 references
73.88 percent
0 references
13 March 2018
0 references
30 November 2020
0 references
TERNA - RETE ELETTRICA NAZIONALE
0 references
IL PRESENTE PROGETTO RIGUARDA INTERVENTI DI ADEGUAMENTO DELLA LINEA DI TRASPORTO A 150 KV SIMERI-CATANZARO ATTRAVERSO LA SOSTITUZIONE DI CONDUTTORI CON CONDUTTORI INNOVATIVI AD ALTA CAPACITÃ (CONDUTTORI A CORDA DI LEGA DI ALLUMINIO (ZTAL) - LEGA FE-NI RIVESTITA DI ALLUMINIO (ACI) Ã 22,75 MM), INSTALLAZIONE DI COMPONENTI TECNOLOGICAMENTE AVANZATI QUALI PHASOR MEASUREMENT UNIT PRESSO LE S.E. DI CATANZARO, CALUSIA E MUCONE E L'INSTALLAZIONE DI UN TRASFORMATORE AD OLIO VEGETALE (DI NUOVA GENERAZIONE) PRESSO LA STAZIONE DI CATANZARO. (Italian)
0 references
THIS PROJECT RELATES TO THE ADAPTATION OF THE TRANSPORT LINE OF 150 KV SIMERI-CATANZARO THROUGH THE REPLACEMENT OF CONDUCTORS WITH AN ALUMINIUM ALLOY ROPE (ZTAL) — WITH ALUMINIUM ALLOY CORD (ACI) BEING 22.75 MM), INSTALLATION OF TECHNOLOGICALLY ADVANCED COMPONENTS SUCH AS PHASOR MEASUREMENT UNIT IN CATANZARO, CALUSIA AND MUCONE AND THE INSTALLATION OF A (NEW GENERATION) PLANT TRANSFORMER IN CATANZARO PLANT. (English)
0 references
CE PROJET CONCERNE L’ADAPTATION DE LA LIGNE DE TRANSPORT SIMERI-CATANZARO 150 KV PAR LE REMPLACEMENT DES CONDUCTEURS PAR DES CONDUCTEURS INNOVANTS À HAUTE CAPACITÉ (CONDUCTEURS DE CÂBLES EN ALLIAGE D’ALUMINIUM (ZTAL) — ALLIAGE FE-NI REVÊTU D’ALUMINIUM (ACI) 22,75 MM), L’INSTALLATION DE COMPOSANTS TECHNOLOGIQUEMENT AVANCÉS TELS QUE L’UNITÉ DE MESURE DU PHASOR À LA S.E. DE CATANZARO, CALUSIA ET MUCONE ET L’INSTALLATION D’UN TRANSFORMATEUR D’HUILE VÉGÉTALE (NOUVELLE GÉNÉRATION) À LA STATION DE CATANZARO. (French)
14 December 2021
0 references
DIT PROJECT HEEFT BETREKKING OP DE AANPASSING VAN DE TRANSPORTLIJN SIMERI-CATANZARO 150 KV DOOR DE VERVANGING VAN GELEIDERS DOOR INNOVATIEVE HOOGVERMOGEN GELEIDERS (ALUMINIUMLEGERING (ZTAL) KABELGELEIDERS — ALUMINIUM-GECOATE FE-NI-LEGERING (ACI) 22,75 MM), INSTALLATIE VAN TECHNOLOGISCH GEAVANCEERDE COMPONENTEN ZOALSPHASORMEETEENHEID BIJ DE S.E. VAN CATANZARO, CALUSIA EN MUCONE EN DE INSTALLATIE VAN EEN TRANSFORMATOR VOOR PLANTAARDIGE OLIE (NIEUWE GENERATIE) IN HET CATANZARO-STATION. (Dutch)
23 December 2021
0 references
Identifiers
G83G17000840007
0 references