Energy Efficiency – Efficient Public Lighting in the municipality of Azambuja – Phase II (Q2866109): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
Energie-efficiëntie — Efficiënte openbare verlichting in de gemeente Azambuja — Fase II | |||||||||||||||
Property / summary | |||||||||||||||
Energie-efficiëntie in de gemeente Azambuja houdt verband met de mismatch tussen de bestaande technologieën, de ontwikkeling van nieuwe LED-technologieën die een grote besparing in termen van verbruik opleveren.De mogelijkheid om de operatie (fase II) uit te voeren is ontstaan door de versterking van de middelen van het PDCT (Plano de Desenvolvimento e Cohesion Territorial) van CIMLT. (Dutch) | |||||||||||||||
Property / summary: Energie-efficiëntie in de gemeente Azambuja houdt verband met de mismatch tussen de bestaande technologieën, de ontwikkeling van nieuwe LED-technologieën die een grote besparing in termen van verbruik opleveren.De mogelijkheid om de operatie (fase II) uit te voeren is ontstaan door de versterking van de middelen van het PDCT (Plano de Desenvolvimento e Cohesion Territorial) van CIMLT. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Energie-efficiëntie in de gemeente Azambuja houdt verband met de mismatch tussen de bestaande technologieën, de ontwikkeling van nieuwe LED-technologieën die een grote besparing in termen van verbruik opleveren.De mogelijkheid om de operatie (fase II) uit te voeren is ontstaan door de versterking van de middelen van het PDCT (Plano de Desenvolvimento e Cohesion Territorial) van CIMLT. (Dutch) / qualifier | |||||||||||||||
point in time: 18 December 2021
|
Revision as of 18:21, 18 December 2021
Project Q2866109 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy Efficiency – Efficient Public Lighting in the municipality of Azambuja – Phase II |
Project Q2866109 in Portugal |
Statements
464,459.0 Euro
0 references
488,904.0 Euro
0 references
95.0 percent
0 references
2 January 2020
0 references
31 December 2020
0 references
MUNICÍPIO DE AZAMBUJA
0 references
A eficiência energética no Município de Azambuja, prende-se com o desajustamento entre as tecnologias existentes atualmente, com o desenvolvimento de novas tecnologias LED que proporcionam uma grande poupança em termos de consumo.A oportunidade da realização da operação (Fase II) surgiu com o reforço de verbas do PDCT (Plano de Desenvolvimento e Coesão Territorial) da CIMLT. (Portuguese)
0 references
Energy efficiency in the municipality of Azambuja is related to the misadjustment between existing technologies today, with the development of new LED technologies that provide a great saving in terms of consumption.The opportunity to carry out the operation (Phase II) came with the reinforcement of funds from CIMLT’s PDCT (Territorial Cohesion and Development Plan). (English)
6 July 2021
0 references
L’efficacité énergétique dans la municipalité d’Azambuja est liée à l’inadéquation entre les technologies existantes, le développement de nouvelles technologies LED qui offrent des économies considérables en termes de consommation.La possibilité de réaliser l’opération (phase II) est née avec le renforcement des fonds du PDCT (Plano de Desenvolvimento e Cohesion Territorial) de CIMLT. (French)
4 December 2021
0 references
Die Energieeffizienz in der Gemeinde Azambuja steht im Zusammenhang mit der Diskrepanz zwischen den bestehenden Technologien, der Entwicklung neuer LED-Technologien, die hohe Verbrauchseinsparungen ermöglichen.Die Möglichkeit, den Betrieb (Phase II) durchzuführen, entstand durch die Aufstockung der Mittel aus dem PDCT (Plano de Desenvolvimento e Cohesion Territorial) von CIMLT. (German)
13 December 2021
0 references
Energie-efficiëntie in de gemeente Azambuja houdt verband met de mismatch tussen de bestaande technologieën, de ontwikkeling van nieuwe LED-technologieën die een grote besparing in termen van verbruik opleveren.De mogelijkheid om de operatie (fase II) uit te voeren is ontstaan door de versterking van de middelen van het PDCT (Plano de Desenvolvimento e Cohesion Territorial) van CIMLT. (Dutch)
18 December 2021
0 references
Azambuja
0 references
Identifiers
ALT20-07-1203-FEDER-000146
0 references