Introduction of energy efficiency measures in a building from the cultural infrastructure of the town of Botevgrad (Q3884172): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Introduzione di misure di efficienza energetica in un edificio dalle infrastrutture culturali della città di Botevgrad | |||||||||||||||
Property / summary | |||||||||||||||
L'obiettivo principale della proposta di progetto è aumentare l'efficienza energetica negli edifici pubblici delle infrastrutture culturali, in particolare la Chitalishte "Hristo Botev 1884", nella città di Botevgrad, migliorare le condizioni di lavoro dei dipendenti e dei gruppi dilettanti e rendere l'edificio conforme ai requisiti normativi per l'ambiente accessibile. L'edificio di Chitalishte "Hristo Botev 1884" è stato messo in funzione nel 1976 ed è in cattive condizioni. Al fine di soddisfare i moderni requisiti EE, ambienti accessibili, ecc., è necessaria una ristrutturazione importante dell'edificio, che comprende: attuazione delle misure EE, tra cui l'isolamento termico delle pareti esterne, la struttura del tetto e l'abitacolo, la sostituzione dei telai delle finestre, la riparazione dell'impianto elettrico di illuminazione e la realizzazione di un'illuminazione a risparmio energetico in tutto l'edificio, la sostituzione della rete di tubi e delle caldaie per una grande sala, la sostituzione delle apparecchiature di ventilazione, ecc. Il progetto realizzerà anche i lavori di costruzione e installazione relativi all'attuazione di misure di efficienza energetica e al ripristino dello stato iniziale danneggiato a seguito della ristrutturazione. I principali risultati del progetto sono legati al raggiungimento della classe energetica "A" dell'edificio della Chitalishte, risparmiando il 60,15 % dell'attuale consumo dell'edificio e riducendo le emissioni nocive generate dal funzionamento dell'edificio di 108,84 t/anno. (Italian) | |||||||||||||||
Property / summary: L'obiettivo principale della proposta di progetto è aumentare l'efficienza energetica negli edifici pubblici delle infrastrutture culturali, in particolare la Chitalishte "Hristo Botev 1884", nella città di Botevgrad, migliorare le condizioni di lavoro dei dipendenti e dei gruppi dilettanti e rendere l'edificio conforme ai requisiti normativi per l'ambiente accessibile. L'edificio di Chitalishte "Hristo Botev 1884" è stato messo in funzione nel 1976 ed è in cattive condizioni. Al fine di soddisfare i moderni requisiti EE, ambienti accessibili, ecc., è necessaria una ristrutturazione importante dell'edificio, che comprende: attuazione delle misure EE, tra cui l'isolamento termico delle pareti esterne, la struttura del tetto e l'abitacolo, la sostituzione dei telai delle finestre, la riparazione dell'impianto elettrico di illuminazione e la realizzazione di un'illuminazione a risparmio energetico in tutto l'edificio, la sostituzione della rete di tubi e delle caldaie per una grande sala, la sostituzione delle apparecchiature di ventilazione, ecc. Il progetto realizzerà anche i lavori di costruzione e installazione relativi all'attuazione di misure di efficienza energetica e al ripristino dello stato iniziale danneggiato a seguito della ristrutturazione. I principali risultati del progetto sono legati al raggiungimento della classe energetica "A" dell'edificio della Chitalishte, risparmiando il 60,15 % dell'attuale consumo dell'edificio e riducendo le emissioni nocive generate dal funzionamento dell'edificio di 108,84 t/anno. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L'obiettivo principale della proposta di progetto è aumentare l'efficienza energetica negli edifici pubblici delle infrastrutture culturali, in particolare la Chitalishte "Hristo Botev 1884", nella città di Botevgrad, migliorare le condizioni di lavoro dei dipendenti e dei gruppi dilettanti e rendere l'edificio conforme ai requisiti normativi per l'ambiente accessibile. L'edificio di Chitalishte "Hristo Botev 1884" è stato messo in funzione nel 1976 ed è in cattive condizioni. Al fine di soddisfare i moderni requisiti EE, ambienti accessibili, ecc., è necessaria una ristrutturazione importante dell'edificio, che comprende: attuazione delle misure EE, tra cui l'isolamento termico delle pareti esterne, la struttura del tetto e l'abitacolo, la sostituzione dei telai delle finestre, la riparazione dell'impianto elettrico di illuminazione e la realizzazione di un'illuminazione a risparmio energetico in tutto l'edificio, la sostituzione della rete di tubi e delle caldaie per una grande sala, la sostituzione delle apparecchiature di ventilazione, ecc. Il progetto realizzerà anche i lavori di costruzione e installazione relativi all'attuazione di misure di efficienza energetica e al ripristino dello stato iniziale danneggiato a seguito della ristrutturazione. I principali risultati del progetto sono legati al raggiungimento della classe energetica "A" dell'edificio della Chitalishte, risparmiando il 60,15 % dell'attuale consumo dell'edificio e riducendo le emissioni nocive generate dal funzionamento dell'edificio di 108,84 t/anno. (Italian) / qualifier | |||||||||||||||
point in time: 13 January 2022
|
Revision as of 22:57, 13 January 2022
Project Q3884172 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Introduction of energy efficiency measures in a building from the cultural infrastructure of the town of Botevgrad |
Project Q3884172 in Bulgaria |
Statements
1,018,223.68 Bulgarian lev
0 references
1,197,910.21 Bulgarian lev
0 references
0.85 percent
0 references
26 September 2016
0 references
29 January 2020
0 references
0 references
Основната цел на проектното предложение е повишаване на енергийната ефективност в обществените сгради от културната инфраструктура, в частност на Читалище „Христо Ботев 1884”, в гр. Ботевград и подобряване на условията за работа на служителите и самодейните състави и привеждане на сградата в съответствие с нормативните изисквания за достъпна среда. Сградата на Читалище „Христо Ботев 1884” е въведена в експлоатация през 1976г. и е в лошо състояние. За да бъде приведена в съответствие със съвременните изисквания за ЕЕ, достъпна среда и др. е необходим основен ремонт на сградата, който включва: изпълнение на ЕЕ мерки, в това число топлоизолиране на външни стени, покривна конструкция и еркер, подмяна на дограма, ремонт на осветителна електроинсталация и изпълнение на енергоспестяващо осветление в цялата сграда, подмяна на тръбна мрежа и котел/и за голяма зала, подмяна вентилационни съоръжения и др. В рамките на проекта ще бъдат изпълнени и съпътстващите строителни и монтажни работи, свързани с изпълнението на мерките за енергийна ефективност и възстановяване на първоначалното състояние, нарушено в резултат на обновяването. Основният резултати от изпълнението на проекта са свързани с постигане на енергиен клас „А” на сградата на читалището, спестяване на енергия в размер на 60,15% от сегашното потребление на сградата и намаляване на вредните емисии, генерирани от експлоатацията на сградата, с 108,84 t/год. (Bulgarian)
0 references
The main objective of the project proposal is to increase the energy efficiency in the public buildings of the cultural infrastructure, in particular the Chitalishte “Hristo Botev 1884”, in the town of Botevgrad and to improve the working conditions of employees and amateur groups and bring the building into compliance with the regulatory requirements for accessible environment. The building of Chitalishte “Hristo Botev 1884” was put into operation in 1976 and is in poor condition. In order to comply with modern EE requirements, accessible environments, etc., a major renovation of the building is necessary, which includes: implementation of EE measures, including thermal insulation of external walls, roof structure and arker, replacement of window frames, repair of lighting electrical installation and implementation of energy-saving lighting throughout the building, replacement of pipe network and boiler(s) for a large hall, replacement of ventilation equipment, etc. The project will also implement the accompanying construction and installation works related to the implementation of energy efficiency measures and restoration of the initial condition damaged as a result of the renovation. The main results of the project are related to achieving the energy class “A” of the building of the Chitalishte, saving 60.15 % of the current consumption of the building and reducing the harmful emissions generated by the operation of the building by 108.84 t/year. (English)
2 December 2021
0 references
L’objectif principal de la proposition de projet est d’accroître l’efficacité énergétique dans les bâtiments publics des infrastructures culturelles, en particulier le Chitalishte «Hristo Botev 1884», dans la ville de Botevgrad et d’améliorer les conditions de travail des employés et des groupes amateurs et de mettre le bâtiment en conformité avec les exigences réglementaires pour un environnement accessible. Le bâtiment de Chitalishte «Hristo Botev 1884» a été mis en service en 1976 et est en mauvais état. Afin de respecter les exigences modernes en matière d’EE, les environnements accessibles, etc., une rénovation majeure du bâtiment est nécessaire, qui comprend: mise en œuvre des mesures d’efficacité énergétique, y compris l’isolation thermique des murs extérieurs, la structure du toit et l’arker, le remplacement des cadres de fenêtres, la réparation de l’installation électrique d’éclairage et la mise en œuvre d’un éclairage économe en énergie dans tout le bâtiment, le remplacement du réseau de canalisations et des chaudières pour un grand hall, le remplacement des équipements de ventilation, etc. Le projet mettra également en œuvre les travaux de construction et d’installation d’accompagnement liés à la mise en œuvre de mesures d’efficacité énergétique et à la restauration de l’état initial endommagé à la suite de la rénovation. Les principaux résultats du projet sont liés à la réalisation de la classe énergétique «A» du bâtiment du Chitalishte, en économisant 60,15 % de la consommation actuelle du bâtiment et en réduisant les émissions nocives générées par l’exploitation du bâtiment de 108,84 t/an. (French)
3 December 2021
0 references
Das Hauptziel des Projektvorschlags ist die Steigerung der Energieeffizienz in den öffentlichen Gebäuden der kulturellen Infrastruktur, insbesondere der Chitalishte „Hristo Botev 1884“, in der Stadt Botevgrad, sowie die Verbesserung der Arbeitsbedingungen von Mitarbeitern und Amateurgruppen und die Anpassung des Gebäudes an die regulatorischen Anforderungen an barrierefreie Umwelt. Das Gebäude von Chitalishte „Hristo Botev 1884“ wurde 1976 in Betrieb genommen und befindet sich in schlechtem Zustand. Um den modernen EE-Anforderungen, den zugänglichen Umgebungen usw. gerecht zu werden, ist eine umfangreiche Renovierung des Gebäudes erforderlich, die Folgendes umfasst: Durchführung von EE-Maßnahmen, einschließlich Wärmedämmung von Außenwänden, Dachkonstruktion und Archer, Austausch von Fensterrahmen, Reparatur der elektrischen Beleuchtung und Umsetzung energiesparender Beleuchtung im gesamten Gebäude, Austausch von Rohrnetz und Kessel für eine große Halle, Austausch von Lüftungsanlagen usw. Das Projekt wird auch die begleitenden Bau- und Installationsarbeiten im Zusammenhang mit der Durchführung von Energieeffizienzmaßnahmen und der Restaurierung des durch die Renovierung beschädigten ursprünglichen Zustands durchführen. Die wichtigsten Ergebnisse des Projekts betreffen die Erzielung der Energieklasse „A“ des Gebäudes der Chitalishte, 60,15 % des aktuellen Gebäudeverbrauchs und die Verringerung der durch den Betrieb des Gebäudes verursachten schädlichen Emissionen um 108,84 t/Jahr. (German)
4 December 2021
0 references
De belangrijkste doelstelling van het projectvoorstel is het verhogen van de energie-efficiëntie in de openbare gebouwen van de culturele infrastructuur, met name de Chitalishte „Hristo Botev 1884”, in de stad Botevgrad, en het verbeteren van de arbeidsomstandigheden van werknemers en amateurgroepen en het in overeenstemming brengen van het gebouw met de wettelijke vereisten voor een toegankelijke omgeving. Het gebouw van Chitalishte „Hristo Botev 1884” werd in 1976 in gebruik genomen en verkeert in slechte staat. Om te voldoen aan moderne EE-eisen, toegankelijke omgevingen, enz., is een ingrijpende renovatie van het gebouw nodig, waaronder: uitvoering van EE-maatregelen, met inbegrip van thermische isolatie van buitenmuren, dakconstructie en arker, vervanging van raamkozijnen, reparatie van verlichting elektrische installatie en uitvoering van energiebesparende verlichting in het hele gebouw, vervanging van leidingnet en ketel(s) voor een grote hal, vervanging van ventilatieapparatuur, enz. Het project zal ook de bijbehorende bouw- en installatiewerkzaamheden uitvoeren in verband met de uitvoering van energie-efficiëntiemaatregelen en het herstel van de door de renovatie beschadigde oorspronkelijke toestand. De belangrijkste resultaten van het project hebben betrekking op het bereiken van de energieklasse „A” van het gebouw van de Chitalishte, een besparing van 60,15 % van het huidige verbruik van het gebouw en een vermindering van de schadelijke emissies die door de exploitatie van het gebouw worden gegenereerd met 108,84 ton/jaar. (Dutch)
12 December 2021
0 references
L'obiettivo principale della proposta di progetto è aumentare l'efficienza energetica negli edifici pubblici delle infrastrutture culturali, in particolare la Chitalishte "Hristo Botev 1884", nella città di Botevgrad, migliorare le condizioni di lavoro dei dipendenti e dei gruppi dilettanti e rendere l'edificio conforme ai requisiti normativi per l'ambiente accessibile. L'edificio di Chitalishte "Hristo Botev 1884" è stato messo in funzione nel 1976 ed è in cattive condizioni. Al fine di soddisfare i moderni requisiti EE, ambienti accessibili, ecc., è necessaria una ristrutturazione importante dell'edificio, che comprende: attuazione delle misure EE, tra cui l'isolamento termico delle pareti esterne, la struttura del tetto e l'abitacolo, la sostituzione dei telai delle finestre, la riparazione dell'impianto elettrico di illuminazione e la realizzazione di un'illuminazione a risparmio energetico in tutto l'edificio, la sostituzione della rete di tubi e delle caldaie per una grande sala, la sostituzione delle apparecchiature di ventilazione, ecc. Il progetto realizzerà anche i lavori di costruzione e installazione relativi all'attuazione di misure di efficienza energetica e al ripristino dello stato iniziale danneggiato a seguito della ristrutturazione. I principali risultati del progetto sono legati al raggiungimento della classe energetica "A" dell'edificio della Chitalishte, risparmiando il 60,15 % dell'attuale consumo dell'edificio e riducendo le emissioni nocive generate dal funzionamento dell'edificio di 108,84 t/anno. (Italian)
13 January 2022
0 references
Ботевград
0 references
Identifiers
BG16RFOP001-2.001-0057
0 references