Supporting low-carbon strategies in the City and Municipality of Szamotuły through the construction of the Integrated Interchange Node in Szamotuła, Memorial and Baborik together with infrastructure. (Q134929): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
Ondersteuning van koolstofarme strategieën in het gebied van de stad en de gemeente Szamotuły door de bouw van het geïntegreerde transmissieknooppunt in Szamotuła, Pamiątków en Babortok, samen met infrastructuur. | |||||||||||||||
Property / summary | |||||||||||||||
Proj.realizo. maakt deel uit van 5 taken en omvat de bouw van 3 geïntegreerde overdrachtsknooppunten (ZWP) van infrastrukturą:1.Budowa ZWP in Szamotuła (voorbereidings- en sloopwerkzaamheden, oppervlakken van het grensgebied, baaibus., wafer, dr.manewr.-1 056 m², Parking Pamp;R(83msc inclusief 2voor gedeeltelijke pm-1 047,5 m²), Bamp;R(60msc), wederopbouw van het rioleringsnetwerk regen., ingangen, fietswegen.-500 m², wandelingen-674 m², verlichting-8pcs., passagier inf. paneel-1pcs., fietswerelden, bushaltes,boards.driving,tyflografische kaart van het station, geleidende borden,inventaris en project groen, werken afwerking, bouwtoezicht).2.Bouw van ZWP in Pamiątków (Rob.preparation en sloop, oppervlakte van beton, dr. toegang-840 m², parkeren Pamp;R(21seat-345 m²),Bamp;R(20 m),sc, Pro.with drainage gebied, fietswegen.-412,5 m², lopen-43,75 m², lopen-ride-trein-1 006,5 m², verlichting-1pcs, inf.passage board, wereld fiets., bushalte.,tabl.departures,tyflografische kaart van het station, gids platen, inventaris en groene projectie, robots afwerking.)3.Bouw van ZPW in Babork (Rob.preparation en sloop, oppervlakken van beton, wegmanoeuvre.-888 m²,Parkingi:Pamp;R(11msc, inclusief 2voor part-pr.-147,5 m²),Bamp;R(20msc), Pro. met uitdroging gebied, racefiets-1 155 m², wandelingen, verlichting-1pcs,inf.passagiers board, fietswereld, bushalte., tafel ontvouwen. reizen, typografische kaart van het station, gids platen, inventaris en groene projectie, werken afwerking.)4.Aankoop van stadsfietsen met apparatuur,5. Promotie en informatie productenProj. (jaar van prestatie-2018)•Lb bouw. ZWP-3pcs •Lb bouw van "park and drive" objecten -3 stuks •Lb parkeerplaatsen in gebouwde objecten "park and drive" -115pcs.•Lb parkeerplaatsen voor personen onder-voorbereid in gebouwde objecten "park en drive"-4pcs •Lb gebouwde Bikeamp objecten; rit"-3pcs •Lb stopt in gebouwde "Bikeamp;Ride" — 100pcs •Voor de ondersteunde infrastructuur van de fiets — 1,01 km•Lb acties en promotiecampagnes-1pcs•Lb nieuwe/moder.points van licht-10pcs. (Dutch) | |||||||||||||||
Property / summary: Proj.realizo. maakt deel uit van 5 taken en omvat de bouw van 3 geïntegreerde overdrachtsknooppunten (ZWP) van infrastrukturą:1.Budowa ZWP in Szamotuła (voorbereidings- en sloopwerkzaamheden, oppervlakken van het grensgebied, baaibus., wafer, dr.manewr.-1 056 m², Parking Pamp;R(83msc inclusief 2voor gedeeltelijke pm-1 047,5 m²), Bamp;R(60msc), wederopbouw van het rioleringsnetwerk regen., ingangen, fietswegen.-500 m², wandelingen-674 m², verlichting-8pcs., passagier inf. paneel-1pcs., fietswerelden, bushaltes,boards.driving,tyflografische kaart van het station, geleidende borden,inventaris en project groen, werken afwerking, bouwtoezicht).2.Bouw van ZWP in Pamiątków (Rob.preparation en sloop, oppervlakte van beton, dr. toegang-840 m², parkeren Pamp;R(21seat-345 m²),Bamp;R(20 m),sc, Pro.with drainage gebied, fietswegen.-412,5 m², lopen-43,75 m², lopen-ride-trein-1 006,5 m², verlichting-1pcs, inf.passage board, wereld fiets., bushalte.,tabl.departures,tyflografische kaart van het station, gids platen, inventaris en groene projectie, robots afwerking.)3.Bouw van ZPW in Babork (Rob.preparation en sloop, oppervlakken van beton, wegmanoeuvre.-888 m²,Parkingi:Pamp;R(11msc, inclusief 2voor part-pr.-147,5 m²),Bamp;R(20msc), Pro. met uitdroging gebied, racefiets-1 155 m², wandelingen, verlichting-1pcs,inf.passagiers board, fietswereld, bushalte., tafel ontvouwen. reizen, typografische kaart van het station, gids platen, inventaris en groene projectie, werken afwerking.)4.Aankoop van stadsfietsen met apparatuur,5. Promotie en informatie productenProj. (jaar van prestatie-2018)•Lb bouw. ZWP-3pcs •Lb bouw van "park and drive" objecten -3 stuks •Lb parkeerplaatsen in gebouwde objecten "park and drive" -115pcs.•Lb parkeerplaatsen voor personen onder-voorbereid in gebouwde objecten "park en drive"-4pcs •Lb gebouwde Bikeamp objecten; rit"-3pcs •Lb stopt in gebouwde "Bikeamp;Ride" — 100pcs •Voor de ondersteunde infrastructuur van de fiets — 1,01 km•Lb acties en promotiecampagnes-1pcs•Lb nieuwe/moder.points van licht-10pcs. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Proj.realizo. maakt deel uit van 5 taken en omvat de bouw van 3 geïntegreerde overdrachtsknooppunten (ZWP) van infrastrukturą:1.Budowa ZWP in Szamotuła (voorbereidings- en sloopwerkzaamheden, oppervlakken van het grensgebied, baaibus., wafer, dr.manewr.-1 056 m², Parking Pamp;R(83msc inclusief 2voor gedeeltelijke pm-1 047,5 m²), Bamp;R(60msc), wederopbouw van het rioleringsnetwerk regen., ingangen, fietswegen.-500 m², wandelingen-674 m², verlichting-8pcs., passagier inf. paneel-1pcs., fietswerelden, bushaltes,boards.driving,tyflografische kaart van het station, geleidende borden,inventaris en project groen, werken afwerking, bouwtoezicht).2.Bouw van ZWP in Pamiątków (Rob.preparation en sloop, oppervlakte van beton, dr. toegang-840 m², parkeren Pamp;R(21seat-345 m²),Bamp;R(20 m),sc, Pro.with drainage gebied, fietswegen.-412,5 m², lopen-43,75 m², lopen-ride-trein-1 006,5 m², verlichting-1pcs, inf.passage board, wereld fiets., bushalte.,tabl.departures,tyflografische kaart van het station, gids platen, inventaris en groene projectie, robots afwerking.)3.Bouw van ZPW in Babork (Rob.preparation en sloop, oppervlakken van beton, wegmanoeuvre.-888 m²,Parkingi:Pamp;R(11msc, inclusief 2voor part-pr.-147,5 m²),Bamp;R(20msc), Pro. met uitdroging gebied, racefiets-1 155 m², wandelingen, verlichting-1pcs,inf.passagiers board, fietswereld, bushalte., tafel ontvouwen. reizen, typografische kaart van het station, gids platen, inventaris en groene projectie, werken afwerking.)4.Aankoop van stadsfietsen met apparatuur,5. Promotie en informatie productenProj. (jaar van prestatie-2018)•Lb bouw. ZWP-3pcs •Lb bouw van "park and drive" objecten -3 stuks •Lb parkeerplaatsen in gebouwde objecten "park and drive" -115pcs.•Lb parkeerplaatsen voor personen onder-voorbereid in gebouwde objecten "park en drive"-4pcs •Lb gebouwde Bikeamp objecten; rit"-3pcs •Lb stopt in gebouwde "Bikeamp;Ride" — 100pcs •Voor de ondersteunde infrastructuur van de fiets — 1,01 km•Lb acties en promotiecampagnes-1pcs•Lb nieuwe/moder.points van licht-10pcs. (Dutch) / qualifier | |||||||||||||||
point in time: 17 December 2021
|
Revision as of 20:23, 17 December 2021
Project Q134929 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Supporting low-carbon strategies in the City and Municipality of Szamotuły through the construction of the Integrated Interchange Node in Szamotuła, Memorial and Baborik together with infrastructure. |
Project Q134929 in Poland |
Statements
2,960,713.1 zloty
0 references
3,483,191.89 zloty
0 references
85.0 percent
0 references
23 March 2017
0 references
29 December 2017
0 references
MIASTO I GMINA SZAMOTUŁY
0 references
Proj.realizo. będzie w ramach 5 zadań i będzie obejmo. budowę 3 zintegrowanych węzłów przesiadkowych(ZWP)z infrastrukturą:1.Budowa ZWP w Szamotułach(Roboty przygotow. i rozbiórkowe, nawierzchnie z k.granitowej,zatoka autobus.,opaski,dr.manewr.-1056m2,parkingi Pamp;R(83msc w tym 2dla niepełnospr.-1047,5m2),Bamp;R(60msc),przebudowa sieci kanaliz. deszcz.,wjazdy, drogi rower.-500m2,chodniki-674 m2,oświetlenie-8szt.,tabl. inf. pasażerskiej-1szt.,wiaty rowerowe,przystanek autobusowy,tabl. rozkł. jazdy,tyflograficzna mapa stacji,płyty prowadzące,inwentaryzacja i proj.zieleni,roboty wykończ.,nadzór budowlany).2.Budowa ZWP w Pamiątkowie(Rob.przygotow. i rozbiórkowe,nawierzchnie z k.betonowej,dr.dojazd-840m2,parkingi Pamp;R(21miejsc-345m2),Bamp;R(20msc),proj.z odwodnieniem pow.,drogi rower.-412,5m2,chodnik-43,75m2,ciąg piesz-jezdny-1006,5m2,oświetlenie-1szt,tablica inf.pasaż.,wiata rower.,przystanek autobus.,tabl. rozkł.jazdy,tyflograficzna mapa stacji, płyty prowadzące,inwentaryzacja i proj.zieleni, roboty wykończ.)3.Budowa ZPW w Baborówku(Rob.przygotow. i rozbiórkowe,nawierzchnie z k.betonowej,droga manewr.-888m2,parkingi:Pamp;R(11msc,w tym 2dla niepełnospr.-147,5m2),Bamp;R(20msc),proj.z odwodnieniem pow.,drogi rower-1155m2,chodniki,oświetlenie-1szt,tabl. inf.pasażerskiej,wiata rowerowa,przystanek autobus.,tablica rozkł.jazdy,tyflograficzna mapa stacji,płyty prowadzące,inwentaryzacja i proj.zieleni, roboty wykończ.)4.Zakup rowerów miejskich z wyposażeniem,5.Dz.promocyjno-informacyjneProdukty proj.(rok osiągnięcia-2018)•Lb wybudowa. ZWP–3szt.•Lb wybudowa. obiektów„parkuj i jedź”–3 szt.•Lb miejsc postoj. w wybudowanych obiektach„parkuj i jedź”–115szt.•Lb miejsc postoj. dla os. niepełnospra. w wybudowanych obiektach„parkuj i jedź”–4szt.•Lb wybudowanych obiektów„Bikeamp;Ride”–3szt.•Lb stanowisk postoj. w wybudowanych obiektach„Bikeamp;Ride”–100szt.•Dł wspartej infrastru. rowero.- 1,01 km•Lb akcji i kampanii informacyjno-promocyjnych–1szt.•Lb nowych/zmoder.pkt świetlnych-10szt. (Polish)
0 references
X-674,8,1,2,840,21,840,21,345,20,8,1,2,840,21,345,20,8,1,2,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,43,75,674,8,1,2,840,840,21,840,21,840,21,345,20,412,840,21,345,21,345,20,412,840,840,21,840,21,345,20,345,20,345,20,-412,345,20,-8,1,-2,840,840,21,345,20,345,20,345,20,345,20,-412,5,43,75,1006.345,20,20,412,5,840,840,21,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,-412,840,21,345,20,20,412,5,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,5,21,345,20,412,5,43,75,-674,8,1,2,840,21,345,20,412,5,43,75,-1006.345,20,-412,5,43,-75,-1006,345,20,-412,5,840,21,-345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,21,-345,20,412,5,840,21,345,20,412,5,840,840,21,345,20,412,5,840,840,840,21,345,20,412,-840,21,345,20,412,840,-21,-345,20,-412,-840,840,21,-840,21,345,20,-412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20, 412,840,21,345,20,412,840,840,21,345,20,412,840,-21,345,20,412,-840,21,345,20, 412,5,43,75,-1006,345,20,412,840,21,345,20, 412,5,43,75,-1006.345,20,-412,5,43.75,-1006.,-345,20,-412.5,43.75,-1006.,-8,-1,2.840,21,345,20,345,20,412,5,43.75,-21,345,20,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,412,840,21,345,20,-412.412,840,21,345,20,-412,-412,-840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,345,20,412,840,21,345,20,345,20,412.412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,412,840,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412.840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,21,345,20,412,840,840,21,345,20,345,20,412,5.840,21,345,20,345,20,412,5,5,840,840,840,21,345,20,412,840,840,21,345,345,20,412,840,840,840,21,345,20,412,840,840,21,345,20,412,840,840,21,840,840,21,840,840,21,840,840,21,840,840,21,840,21,345,20,345,20,412,840,840,840,840,21,840,840,840,21,840,21,840,840,840,21,840,840,21,840,21,345,20,345,20,20,412,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,840,840,21,345,20,345,20,412,840,840,840,21,345,20,345,20,412,840,840,21,345,20,412,840,840,840,840,840,21,345,20,345,20,412,840,840,840,840,840,840,840,840,840,840,21,345,20,412,840,840,21,345,20,345,20,412,840,840,840,840,840,840,21,345,345,20,345,20,345,20,-412,840,840,21,345,20,345,20,345,20,345,20,412,840,840,21,345,345,20,345,20,345,20,412,840,840,-840,840,840,-840,840,840,840,840,-21,345,840,-21,345,20,-345,-20,-412,840,-840,-840,-840,-840,-840,-840,-840,-21,-840,-840,-840,-840,-840,-840,840,-21,-840,-840,-840,840,-840,-840,840,840,840,840,-840,-840,840,-840,-21,-345,-20,-345,-20,-345,-20,-412,840,840-21,345-345-20,345-20,345,-20,345,-20,345,-20,-412,840,840-21,345-20,345,-20,345,-20,345,-20,345,20,345,-20,345,-20,345,-20,345,-20,345,20,-345,20,20,-412,840,840,840,840,840,840,840,840,21,-21,345,-20,-345,20,-8-1,840,840,840,840,21,840,840,840,840,840,840,840,840,840,840,840,840,840,840,-21,-sex-840,840,840,840,840,840,840,840,840,840,840,21-840,-840,-840,-840,-840,-840,-840-21-345-345,345-sac-20,-412,840,840,-840,21,-345-345,Robre,Rond-Month-Month-Month-Month,-674-8-Month-Month-Rond way,Rond,-1, ZWP-3pc.•Lb buildings“park and drive”-3 pcs•Lb parking places. in built objects“park and drive”–115pcs.•Lb parking places. for the disabled persons in built objects“park and drive”–4pieces.•Lb of built actions“Bikeamp;Ride”-3p. (English)
21 October 2020
0 references
Proj.realizo. fera partie de 5 tâches et comprendra la construction de 3 nœuds de transfert intégrés (ZWP) à partir de infrastrukturą:1.Budowa ZWP à Szamotuła (travaux de préparation et de démolition, surfaces de la zone frontalière, bus de la baie, wafer, dr.manewr.-1 056 m², parking Pamp;R(83msc dont 2pour p.m. partiel-1 047,5 m²), Bamp;R(60msc), reconstruction du réseau d’assainissement pluie.,entrées, routes cyclables.-500 m², trottoirs-674 m², éclairage-8pcs.,passenger inf. panneau-1pcs., mondes de bicyclettes, arrêts d’autobus, planches.conduite, carte stylographique de la station, tableaux de guidage, inventaire et projet vert, finition des travaux, supervision de la construction).2.Construction de ZWP à Pamiątków(Rob.préparation et démolition, surface de béton,dr. accès-840 m²,Pampe de stationnement;R(21seat-345 m²),Ramp;R20m), Pro.avec zone de drainage, routes cyclables.-412,5 m², promenade-43,75 m², marche-ride-train-1 006,5 m², éclairage-1pcs,inf.passage board, world bike., arrêt de bus.,tabl.departures, carte stylographique de la station, plaques de guidage, inventaire et projection verte, finition des robots. pro. avec zone de déshydratation, vélo de route-1 155 m², promenades, éclairage-1pcs, inf.passenger board, monde de vélos, arrêt de bus., table dépliant. voyages, carte typographique de la station, plaques de guidage, inventaire et projection verte, finition des travaux.)4.Achat de vélos de ville avec équipement,5.Promotion et produits d’informationProj.(année de réalisation-2018)•Construit en lb. ZWP-3pcs •Lb construction d’objets "park and drive" -3 pcs •Lb places de stationnement dans des objets construits "park and drive" -115pcs.•Lb places de stationnement pour les personnes sous-préparées dans des objets construits "park and drive"-4pcs •Lb d’objets Bikeamp construits; ride"-3pcs •Lb s’arrête dans "Bikeamp;Ride" construit — 100pcs •Pour l’infrastructure supportée du vélo — 1,01 km•Lb actions et campagnes de promotion-1pcs•Lb nouveau/moder.points de lumière-10pcs. (French)
2 December 2021
0 references
Proj.realizo. wird Teil von 5 Aufgaben sein und umfasst den Bau von 3 integrierten Transferknoten (ZWP) von infrastrukturą:1.Budowa ZWP in Szamotuła (Vorbereitungs- und Abbrucharbeiten, Oberflächen aus dem Grenzgebiet, Buchtbus., Wafer, dr.manewr.-1 056 m², Parkplatz Pamp;R(83 msc einschließlich 2für partielles pm-1 047,5 m²), Bamp;R(60msc), Rekonstruktion des Kanalisationsnetzes Regen.,Eingänge, Fahrradstraßen.-500 m², Gehwege-674 m², Beleuchtung-8pcs., Passagier inf. Panel-1pcs.,Fahrradwelten, Bushaltestellen,boards.driving,tyflographische Karte der Station,Leittafeln, Inventar und Projekt grün, Bauausführung, Bauaufsicht).2.Bau von ZWP in Pamiątków(Rob.Präparation und Abriss, Oberfläche aus Beton, Zugang-840 m², Parken Pamp;R(21seat-345 m²), Bamp; R(20msc), pro.mit Drainagebereich, Fahrradstraßen.-412,5 m², Gehweg-43,75 m², Geh-Fahrt-Bahn-1 006,5 m², Beleuchtung-1pcs,inf.passage Board, Weltfahrrad., Bushaltestelle.,tabl.departures,tyflographische Karte der Station, Führungsplatten, Inventar und grüne Projektion, Roboter Finish.)3.Bau von ZPW in Babork(Rob.Vorbereitung und Abriss, Oberflächen aus Beton, Weg Manöver.-888 m²,Parkingi:Pamp;R(11msc, einschließlich 2für Teil-pr.-147,5 m²), Bamp; R(20msc), Pro. mit Dehydrationsbereich, Rennrad-1 155 m², Gehwege, Beleuchtung-1pcs, Inf.passenger Board, Fahrradwelt, Bushaltestelle., Tisch entfalten. Reisen, typographische Karte der Station, Führerplatten, Inventar und grüne Projektion, Ausführung.)4.Kauf von Stadtfahrrädern mit Ausrüstung,5.Förder- und InformationsprodukteProj.(Jahr der Leistung-2018)•Lb Bau. ZWP-3pcs •Lb Bau von "Park-und Laufwerk"-Objekten -3 Stück •Lb-Stellplätze in gebauten Objekten "Park und Antrieb" -115pcs.•Lb Parkplätze für Personen, die in gebauten Objekten "park and drive"-4pcs unterbereitet sind •Lb von gebauten Bikeamp-Objekten; Fahrt"-3pcs •Lb stoppt in gebauten "Bikeamp;Ride" – 100pcs •Für die unterstützte Infrastruktur des Fahrrads – 1,01 km•Lb Aktionen und Werbekampagnen-1pcs•Lb neu/moder.Punkte von Licht-10pcs. (German)
9 December 2021
0 references
Proj.realizo. maakt deel uit van 5 taken en omvat de bouw van 3 geïntegreerde overdrachtsknooppunten (ZWP) van infrastrukturą:1.Budowa ZWP in Szamotuła (voorbereidings- en sloopwerkzaamheden, oppervlakken van het grensgebied, baaibus., wafer, dr.manewr.-1 056 m², Parking Pamp;R(83msc inclusief 2voor gedeeltelijke pm-1 047,5 m²), Bamp;R(60msc), wederopbouw van het rioleringsnetwerk regen., ingangen, fietswegen.-500 m², wandelingen-674 m², verlichting-8pcs., passagier inf. paneel-1pcs., fietswerelden, bushaltes,boards.driving,tyflografische kaart van het station, geleidende borden,inventaris en project groen, werken afwerking, bouwtoezicht).2.Bouw van ZWP in Pamiątków (Rob.preparation en sloop, oppervlakte van beton, dr. toegang-840 m², parkeren Pamp;R(21seat-345 m²),Bamp;R(20 m),sc, Pro.with drainage gebied, fietswegen.-412,5 m², lopen-43,75 m², lopen-ride-trein-1 006,5 m², verlichting-1pcs, inf.passage board, wereld fiets., bushalte.,tabl.departures,tyflografische kaart van het station, gids platen, inventaris en groene projectie, robots afwerking.)3.Bouw van ZPW in Babork (Rob.preparation en sloop, oppervlakken van beton, wegmanoeuvre.-888 m²,Parkingi:Pamp;R(11msc, inclusief 2voor part-pr.-147,5 m²),Bamp;R(20msc), Pro. met uitdroging gebied, racefiets-1 155 m², wandelingen, verlichting-1pcs,inf.passagiers board, fietswereld, bushalte., tafel ontvouwen. reizen, typografische kaart van het station, gids platen, inventaris en groene projectie, werken afwerking.)4.Aankoop van stadsfietsen met apparatuur,5. Promotie en informatie productenProj. (jaar van prestatie-2018)•Lb bouw. ZWP-3pcs •Lb bouw van "park and drive" objecten -3 stuks •Lb parkeerplaatsen in gebouwde objecten "park and drive" -115pcs.•Lb parkeerplaatsen voor personen onder-voorbereid in gebouwde objecten "park en drive"-4pcs •Lb gebouwde Bikeamp objecten; rit"-3pcs •Lb stopt in gebouwde "Bikeamp;Ride" — 100pcs •Voor de ondersteunde infrastructuur van de fiets — 1,01 km•Lb acties en promotiecampagnes-1pcs•Lb nieuwe/moder.points van licht-10pcs. (Dutch)
17 December 2021
0 references
Identifiers
RPWP.03.03.03-30-0006/16
0 references