Replacement of the Coverages of the School EB 2/3 de Maceda (Q3357367): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Ersatz der Deckungen der Schule EB 2/3 de Maceda | |||||||||||||||
Property / summary | |||||||||||||||
Die Operation „Replacement of the Coverages of the School EB 2/3 de Maceda“ erfolgt im Einklang mit der Resolution der Versammlung der Republik Nr. 24/2003, vom 2. April und dem Gesetz Nr. 2/2011, vom 9. Februar, für die Beseitigung der Befruchtung und um dem Gebäude mehr theoretischen Komfort und Bedingungen der Dichtheit zu geben. (German) | |||||||||||||||
Property / summary: Die Operation „Replacement of the Coverages of the School EB 2/3 de Maceda“ erfolgt im Einklang mit der Resolution der Versammlung der Republik Nr. 24/2003, vom 2. April und dem Gesetz Nr. 2/2011, vom 9. Februar, für die Beseitigung der Befruchtung und um dem Gebäude mehr theoretischen Komfort und Bedingungen der Dichtheit zu geben. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Die Operation „Replacement of the Coverages of the School EB 2/3 de Maceda“ erfolgt im Einklang mit der Resolution der Versammlung der Republik Nr. 24/2003, vom 2. April und dem Gesetz Nr. 2/2011, vom 9. Februar, für die Beseitigung der Befruchtung und um dem Gebäude mehr theoretischen Komfort und Bedingungen der Dichtheit zu geben. (German) / qualifier | |||||||||||||||
point in time: 16 December 2021
|
Revision as of 08:15, 16 December 2021
Project Q3357367 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Replacement of the Coverages of the School EB 2/3 de Maceda |
Project Q3357367 in Portugal |
Statements
129,877.0 Euro
0 references
129,877.0 Euro
0 references
100.0 percent
0 references
12 July 2021
0 references
30 October 2021
0 references
MUNICÃPIO DE OVAR
0 references
A operação "Substituição das Coberturas da Escola EB 2/3 de Maceda" vem dar cumprimento à Resolução da Assembleia da República n.º 24/2003, de 2 de abril, e à Lei n.º 2/2011, de 9 de fevereiro, para a remoção de fibrocimento e conferir ao edifÃcio maior conforto térmico e condições de estanquidade. (Portuguese)
0 references
The operation “Replacement of the Coverages of the School EB 2/3 de Maceda” comes in compliance with the Resolution of the Assembly of the Republic No. 24/2003, of 2 April, and to Law No. 2/2011, of 9 February, for the removal of fibrocement and to give the building greater theoretical comfort and conditions of tightness. (English)
29 November 2021
0 references
L’opération «Remplacement des couvertures de l’école EB 2/3 de Maceda» est conforme à la résolution de l’Assemblée de la République no 24/2003, du 2 avril, et à la loi no 2/2011, du 9 février, pour l’élimination du fibrocement et pour donner au bâtiment un plus grand confort théorique et des conditions d’étanchéité. (French)
7 December 2021
0 references
Die Operation „Replacement of the Coverages of the School EB 2/3 de Maceda“ erfolgt im Einklang mit der Resolution der Versammlung der Republik Nr. 24/2003, vom 2. April und dem Gesetz Nr. 2/2011, vom 9. Februar, für die Beseitigung der Befruchtung und um dem Gebäude mehr theoretischen Komfort und Bedingungen der Dichtheit zu geben. (German)
16 December 2021
0 references
Ovar, Região de Aveiro, Centro
0 references
Identifiers
CENTRO-03-5673-FEDER-000277
0 references