Completion and rehabilitation of the water supply and sewerage infrastructure in agglomerations with a population of more than 10 000 population equivalents falling within the scope of the separate area of “Water Supply and Sewerage — Sliven” OOD (Q3832239): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
||||||||||||||
label / nl | label / nl | ||||||||||||||
Voltooiing en sanering van de watervoorzienings- en rioleringsinfrastructuur in agglomeraties met een bevolking van meer dan 10 000 inwonerequivalenten die vallen onder het afzonderlijke gebied „Watervoorziening en riolering — Sliven” OOD | |||||||||||||||
Property / summary | |||||||||||||||
Het project zal worden uitgevoerd op het afzonderlijke grondgebied van „Water Supply and Sewerage — Sliven” OOD (Water Supply and Sewerage Department — Sliven), dat samenvalt met de administratieve grenzen van het district Sliven, met name op het grondgebied van de volgende agglomeraties en hun watervoorzieningssystemen: Agglomeratie Sliven, met inbegrip van Rechitsa (BGAG67338_00) en de agglomeratie Nova Zagora (BGAG51809_00). Revalidatie, reparatie en aanleg van 54,71 km waterleidingnet en 44,79 km rioleringsnetwerk, wederopbouw van afvalwaterzuiveringsinstallaties (WWTP)-Sliven-agglomeratie Sliven en WWTP-Nova Zagora van de agglomeratie Nova Zagora zijn gepland. Agglomeratie Sliven, met inbegrip van Levering: aanleg van nieuwe watervoorzienings-/voedselpijpleidingen; wederopbouw van waterleidinglijnen; revisie van bestaande pompstations en andere installaties; vervanging van de pompen en de integratie ervan in SKADA; hoofdreparatie van het waterleidingnet. Analyse: bouw van hoofdspruitstukken en secundair netwerk, kanaalpompstation (CPS) en pusher in het district Rechitsa; voltooiing en wederopbouw van rioleringsnet met hoge infiltratie in de stad Sliven.Purification: Reconstruction of WWTP-Sliven.- Nova Zagora agglomeratie: Watervoorziening: Hoofdreparatie van het stedelijke waterleidingnet; wederopbouw van pompstations; reparatie van droge kamers van de drukwatertank (NV).Analyse: voltooiing en wederopbouw van het rioleringsnetwerk op het grondgebied van de stad Nova Zagora.Purification: volledige renovatie van WWTP-Nova Zagora.OOD „Water Supply and Sewerage — Sliven” OOD en de twee agglomeraties die aan investeringen onderworpen zijn, in dit investeringsvoorstel voorziet in uitbreiding/aanleg van het bestaande SCADA-systeem, samen met prestatiemaatregelen voor het monitoren, verzamelen en verwerken van gegevens in realtime, alsmede de registratie van evenementen in de vorm van logbestanden, en de bouw en uitvoering van een geografisch informatiesysteem („GIS”). (Dutch) | |||||||||||||||
Property / summary: Het project zal worden uitgevoerd op het afzonderlijke grondgebied van „Water Supply and Sewerage — Sliven” OOD (Water Supply and Sewerage Department — Sliven), dat samenvalt met de administratieve grenzen van het district Sliven, met name op het grondgebied van de volgende agglomeraties en hun watervoorzieningssystemen: Agglomeratie Sliven, met inbegrip van Rechitsa (BGAG67338_00) en de agglomeratie Nova Zagora (BGAG51809_00). Revalidatie, reparatie en aanleg van 54,71 km waterleidingnet en 44,79 km rioleringsnetwerk, wederopbouw van afvalwaterzuiveringsinstallaties (WWTP)-Sliven-agglomeratie Sliven en WWTP-Nova Zagora van de agglomeratie Nova Zagora zijn gepland. Agglomeratie Sliven, met inbegrip van Levering: aanleg van nieuwe watervoorzienings-/voedselpijpleidingen; wederopbouw van waterleidinglijnen; revisie van bestaande pompstations en andere installaties; vervanging van de pompen en de integratie ervan in SKADA; hoofdreparatie van het waterleidingnet. Analyse: bouw van hoofdspruitstukken en secundair netwerk, kanaalpompstation (CPS) en pusher in het district Rechitsa; voltooiing en wederopbouw van rioleringsnet met hoge infiltratie in de stad Sliven.Purification: Reconstruction of WWTP-Sliven.- Nova Zagora agglomeratie: Watervoorziening: Hoofdreparatie van het stedelijke waterleidingnet; wederopbouw van pompstations; reparatie van droge kamers van de drukwatertank (NV).Analyse: voltooiing en wederopbouw van het rioleringsnetwerk op het grondgebied van de stad Nova Zagora.Purification: volledige renovatie van WWTP-Nova Zagora.OOD „Water Supply and Sewerage — Sliven” OOD en de twee agglomeraties die aan investeringen onderworpen zijn, in dit investeringsvoorstel voorziet in uitbreiding/aanleg van het bestaande SCADA-systeem, samen met prestatiemaatregelen voor het monitoren, verzamelen en verwerken van gegevens in realtime, alsmede de registratie van evenementen in de vorm van logbestanden, en de bouw en uitvoering van een geografisch informatiesysteem („GIS”). (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Het project zal worden uitgevoerd op het afzonderlijke grondgebied van „Water Supply and Sewerage — Sliven” OOD (Water Supply and Sewerage Department — Sliven), dat samenvalt met de administratieve grenzen van het district Sliven, met name op het grondgebied van de volgende agglomeraties en hun watervoorzieningssystemen: Agglomeratie Sliven, met inbegrip van Rechitsa (BGAG67338_00) en de agglomeratie Nova Zagora (BGAG51809_00). Revalidatie, reparatie en aanleg van 54,71 km waterleidingnet en 44,79 km rioleringsnetwerk, wederopbouw van afvalwaterzuiveringsinstallaties (WWTP)-Sliven-agglomeratie Sliven en WWTP-Nova Zagora van de agglomeratie Nova Zagora zijn gepland. Agglomeratie Sliven, met inbegrip van Levering: aanleg van nieuwe watervoorzienings-/voedselpijpleidingen; wederopbouw van waterleidinglijnen; revisie van bestaande pompstations en andere installaties; vervanging van de pompen en de integratie ervan in SKADA; hoofdreparatie van het waterleidingnet. Analyse: bouw van hoofdspruitstukken en secundair netwerk, kanaalpompstation (CPS) en pusher in het district Rechitsa; voltooiing en wederopbouw van rioleringsnet met hoge infiltratie in de stad Sliven.Purification: Reconstruction of WWTP-Sliven.- Nova Zagora agglomeratie: Watervoorziening: Hoofdreparatie van het stedelijke waterleidingnet; wederopbouw van pompstations; reparatie van droge kamers van de drukwatertank (NV).Analyse: voltooiing en wederopbouw van het rioleringsnetwerk op het grondgebied van de stad Nova Zagora.Purification: volledige renovatie van WWTP-Nova Zagora.OOD „Water Supply and Sewerage — Sliven” OOD en de twee agglomeraties die aan investeringen onderworpen zijn, in dit investeringsvoorstel voorziet in uitbreiding/aanleg van het bestaande SCADA-systeem, samen met prestatiemaatregelen voor het monitoren, verzamelen en verwerken van gegevens in realtime, alsmede de registratie van evenementen in de vorm van logbestanden, en de bouw en uitvoering van een geografisch informatiesysteem („GIS”). (Dutch) / qualifier | |||||||||||||||
point in time: 10 December 2021
|
Revision as of 15:51, 10 December 2021
Project Q3832239 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Completion and rehabilitation of the water supply and sewerage infrastructure in agglomerations with a population of more than 10 000 population equivalents falling within the scope of the separate area of “Water Supply and Sewerage — Sliven” OOD |
Project Q3832239 in Bulgaria |
Statements
80,082,827.52 Bulgarian lev
0 references
109,552,431.63 Bulgarian lev
0 references
0.73 percent
0 references
9 October 2019
0 references
9 January 2024
0 references
0 references
Проектът ще се реализира на обособената територия на „Водоснабдяване и канализация - Сливен”ООД ( ОТ"ВиК–Сливен"),която съвпада с административните граници на област Сливен, и в частност на териториите на следните агломерации и водоснабдителните системи към тях: Агломерация Сливен, включително кв. Речица (BGAG67338_00) и Агломерация Нова Загора (BGAG51809_00).Предвиждат се рехабилитация,ремонт и изграждане на 54,71 км. водопроводна мрежа и на 44,79 км. канализационна мрежа,реконструкция на пречиствателни станции за отпадъчни води (ПСОВ)-Сливен на агломерация Сливен и ПСОВ–Нова Загора на агломерация Нова Загора. - Агломерация Сливен, включително кв. Речица:Водоснабдяване:изграждане на нови довеждащи/хранителни водопроводи; реконструкция на довеждащи водопроводи; основен ремонт на съществуващи помпени станции и други съоръжения;подмяна на помпите и включването им към СКАДА; основен ремонт на водопроводна мрежа.Канализация:изграждане на главни колектори и второстепенна мрежа,канализационна помпена станция (КПС) и тласкател в кв.Речица; доизграждане и реконструкция на канализационна мрежа с висока инфилтрация в гр.Сливен.Пречистване:Реконструкция на ПСОВ–Сливен.- Агломерация Нова Загора:Водоснабдяване:Основен ремонт на градската водопроводна мрежа;реконструкция на помпените станции;ремонт на сухите камери на напорния водоем(НВ).Канализация: доизграждане и реконструкция на канализационна мрежа на територията на гр.Нова Загора.Пречистване:пълна реновация на ПСОВ-Нова Загора.За ОТ „Водоснабдяване и канализация – Сливен“ООД и нейните две агломерации обект на инвестиция, в настоящото инвестиционно предложение, е предвидено разширение / доизграждане на съществуващата СКАДА система, ведно с Мерки за ефективност за мониторинг, събиране и обработка на данни в реално време, както и запис на събития под формата на логове, и изграждане и внедряване на Географска информационна система („ГИС“). (Bulgarian)
0 references
The project will be implemented on the separate territory of “Water Supply and Sewerage — Sliven” OOD (Water Supply and Sewerage Department — Sliven), which coincides with the administrative boundaries of the district of Sliven, in particular in the territories of the following agglomerations and their water supply systems: Agglomeration of Sliven, including Rechitsa (BGAG67338_00) and Nova Zagora agglomeration (BGAG51809_00). Rehabilitation, repair and construction of 54.71 km of water supply network and 44.79 km sewerage network, reconstruction of waste water treatment plants (WWTP)-Sliven agglomeration of Sliven and WWTP-Nova Zagora of the agglomeration of Nova Zagora are planned. — Agglomeration of Sliven, including Supply: construction of new water supply/food pipelines; reconstruction of water supply lines; overhaul of existing pumping stations and other facilities; replacement of the pumps and their incorporation to SKADA; main repair of water supply network.Canalysis: construction of main manifolds and secondary network, canalisation pump station (CPS) and pusher in Rechitsa district; completion and reconstruction of sewerage network with high infiltration in the town of Sliven.Purification: Reconstruction of WWTP-Sliven.- Nova Zagora agglomeration: Water supply: Main repair of the urban water supply network; reconstruction of pumping stations; repair of dry chambers of the pressure water tank (NV).Canalysis: completion and reconstruction of sewerage network on the territory of the town of Nova Zagora.Purification: complete renovation of WWTP-Nova Zagora.OOD “Water Supply and Sewerage — Sliven” OOD and its two agglomerations subject to investment, in this investment proposal, provides for extension/construction of the existing SCADA system, together with Performance Measures for monitoring, collection and processing of data in real time, as well as recording of events in the form of logs, and construction and implementation of a Geographic Information System (“GIS”). (English)
2 December 2021
0 references
Le projet sera mis en œuvre sur le territoire distinct de l’OOD «Approvisionnement en eau et assainissement — Sliven» (Département de l’approvisionnement en eau et des eaux usées — Sliven), qui coïncide avec les limites administratives du district de Sliven, notamment sur les territoires des agglomérations suivantes et de leurs réseaux d’approvisionnement en eau: Agglomération de Sliven, y compris Rechitsa (BGAG67338_00) et agglomération de Nova Zagora (BGAG51809_00). Réhabilitation, réparation et construction de 54,71 km de réseau d’approvisionnement en eau et 44,79 km de réseau d’assainissement, reconstruction des stations d’épuration des eaux usées (WWTP)-agglomération de Sliven et WWTP-Nova Zagora de l’agglomération de Nova Zagora. — Agglomération de Sliven, y compris Approvisionnement: construction de nouveaux pipelines d’approvisionnement en eau et de denrées alimentaires; reconstruction des conduites d’approvisionnement en eau; la révision des stations de pompage existantes et d’autres installations; le remplacement des pompes et leur incorporation à SKADA; réparation principale du réseau d’approvisionnement en eau.Analyse: construction de collecteurs principaux et réseau secondaire, station de pompage de canalisation (CPS) et poussoir dans le district de Rechitsa; achèvement et reconstruction du réseau d’assainissement avec une forte infiltration dans la ville de Sliven.Purification: Reconstruction de la station d’épuration-Sliven.- agglomération de Nova Zagora: Approvisionnement en eau: Réparation principale du réseau d’alimentation en eau urbaine; reconstruction des stations de pompage; réparation des chambres sèches du réservoir d’eau sous pression (NV).Canalyse: achèvement et reconstruction du réseau d’assainissement sur le territoire de la ville de Nova Zagora.Purification: rénovation complète de WWTP-Nova Zagora.OOD «Approvisionnement en eau et assainissement — Sliven» OOD et ses deux agglomérations faisant l’objet d’investissements, dans cette proposition d’investissement, prévoit l’extension/la construction du système SCADA existant, ainsi que les mesures de performance pour le suivi, la collecte et le traitement des données en temps réel, ainsi que l’enregistrement des événements sous forme de grumes, ainsi que la construction et la mise en œuvre d’un système d’information géographique («SIG»). (French)
3 December 2021
0 references
Das Projekt wird auf dem separaten Gebiet der „Wasserversorgung und -ablagerung – Sliven“ (Abteilung für Wasserversorgung und Abwasserentsorgung – Sliven) durchgeführt, die mit den Verwaltungsgrenzen des Bezirks Sliven, insbesondere in den Gebieten der folgenden Ballungsräume und ihrer Wasserversorgungssysteme, zusammenfällt: Agglomeration von Sliven, einschließlich Rechitsa (BGAG67338_00) und Nova Zagora Agglomeration (BGAG51809_00). Sanierung, Reparatur und Bau von 54,71 km Wasserversorgungsnetz und 44,79 km Kanalisation, Wiederaufbau von Abwasserbehandlungsanlagen (WWTP)-Sliven Agglomeration von Sliven und WWTP-Nova Zagora des Ballungsraums Nova Zagora sind geplant. — Agglomeration von Sliven, einschließlich Versorgung: Bau neuer Wasserversorgungs-/Lebensmittelpipelines; Wiederaufbau von Wasserversorgungsleitungen; Überarbeitung bestehender Pumpstationen und anderer Anlagen; Austausch der Pumpen und deren Einbau in SKADA; Hauptreparatur des Wasserversorgungsnetzes.Kanalyse: Bau von Hauptkrümmern und Sekundärnetz, Kanalisation Pumpstation (CPS) und Pusher im Bezirk Rechitsa; Fertigstellung und Wiederaufbau des Kanalisationsnetzes mit hoher Infiltration in der Stadt Sliven.Verarbeitung: Wiederaufbau der WWTP-Sliven.- Nova Zagora Agglomeration: Wasserversorgung: Hauptreparatur des städtischen Wasserversorgungsnetzes; Umbau von Pumpstationen; Reparatur von Trockenkammern des Druckwassertanks (NV).Canalysis: Fertigstellung und Rekonstruktion des Kanalisationsnetzes auf dem Territorium der Stadt Nova Zagora.Verarbeitung: komplette Renovierung des WWTP-Nova Zagora.OOD „Wasserversorgung und Abwasserentsorgung – Sliven“ OOD und seine beiden Gemeinden, die Investitionen unterliegen, in diesem Investitionsvorschlag sieht die Erweiterung/Bau des bestehenden SCADA-Systems sowie Performance-Maßnahmen zur Überwachung, Erfassung und Verarbeitung von Daten in Echtzeit sowie Aufzeichnung von Ereignissen in Form von Protokollen sowie den Bau und die Umsetzung eines geografischen Informationssystems („GIS“) vor. (German)
4 December 2021
0 references
Het project zal worden uitgevoerd op het afzonderlijke grondgebied van „Water Supply and Sewerage — Sliven” OOD (Water Supply and Sewerage Department — Sliven), dat samenvalt met de administratieve grenzen van het district Sliven, met name op het grondgebied van de volgende agglomeraties en hun watervoorzieningssystemen: Agglomeratie Sliven, met inbegrip van Rechitsa (BGAG67338_00) en de agglomeratie Nova Zagora (BGAG51809_00). Revalidatie, reparatie en aanleg van 54,71 km waterleidingnet en 44,79 km rioleringsnetwerk, wederopbouw van afvalwaterzuiveringsinstallaties (WWTP)-Sliven-agglomeratie Sliven en WWTP-Nova Zagora van de agglomeratie Nova Zagora zijn gepland. Agglomeratie Sliven, met inbegrip van Levering: aanleg van nieuwe watervoorzienings-/voedselpijpleidingen; wederopbouw van waterleidinglijnen; revisie van bestaande pompstations en andere installaties; vervanging van de pompen en de integratie ervan in SKADA; hoofdreparatie van het waterleidingnet. Analyse: bouw van hoofdspruitstukken en secundair netwerk, kanaalpompstation (CPS) en pusher in het district Rechitsa; voltooiing en wederopbouw van rioleringsnet met hoge infiltratie in de stad Sliven.Purification: Reconstruction of WWTP-Sliven.- Nova Zagora agglomeratie: Watervoorziening: Hoofdreparatie van het stedelijke waterleidingnet; wederopbouw van pompstations; reparatie van droge kamers van de drukwatertank (NV).Analyse: voltooiing en wederopbouw van het rioleringsnetwerk op het grondgebied van de stad Nova Zagora.Purification: volledige renovatie van WWTP-Nova Zagora.OOD „Water Supply and Sewerage — Sliven” OOD en de twee agglomeraties die aan investeringen onderworpen zijn, in dit investeringsvoorstel voorziet in uitbreiding/aanleg van het bestaande SCADA-systeem, samen met prestatiemaatregelen voor het monitoren, verzamelen en verwerken van gegevens in realtime, alsmede de registratie van evenementen in de vorm van logbestanden, en de bouw en uitvoering van een geografisch informatiesysteem („GIS”). (Dutch)
10 December 2021
0 references
Сливен
0 references
Identifiers
BG16M1OP002-1.016-0008
0 references