Promotion of Energy Sustainability – Viana do Castelo Interventions in public infrastructure of local government: Public Lighting Systems (Q2894544): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Förderung der Nachhaltigkeit im Energiebereich – Viana do Castelo Interventionen in öffentlichen Infrastrukturen der lokalen Gebietskörperschaften: Öffentliche Beleuchtungssysteme | |||||||||||||||
Property / summary | |||||||||||||||
Diese Maßnahme sieht die Durchführung einer Reihe integrierter Maßnahmen zur Förderung der Energieeffizienz und zur Rationalisierung des Verbrauchs an öffentlichen Beleuchtungssystemen der Gemeinde Viana do Castelo vor, insbesondere durch die Installation effizienterer Systeme und Technologien. (German) | |||||||||||||||
Property / summary: Diese Maßnahme sieht die Durchführung einer Reihe integrierter Maßnahmen zur Förderung der Energieeffizienz und zur Rationalisierung des Verbrauchs an öffentlichen Beleuchtungssystemen der Gemeinde Viana do Castelo vor, insbesondere durch die Installation effizienterer Systeme und Technologien. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Diese Maßnahme sieht die Durchführung einer Reihe integrierter Maßnahmen zur Förderung der Energieeffizienz und zur Rationalisierung des Verbrauchs an öffentlichen Beleuchtungssystemen der Gemeinde Viana do Castelo vor, insbesondere durch die Installation effizienterer Systeme und Technologien. (German) / qualifier | |||||||||||||||
point in time: 13 December 2021
|
Revision as of 13:44, 13 December 2021
Project Q2894544 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Promotion of Energy Sustainability – Viana do Castelo Interventions in public infrastructure of local government: Public Lighting Systems |
Project Q2894544 in Portugal |
Statements
1,671,174.0 Euro
0 references
1,759,632.0 Euro
0 references
94.97 percent
0 references
23 January 2019
0 references
31 December 2020
0 references
MUNICÍPIO DE VIANA DO CASTELO
0 references
Q3000045 (Deleted Item)
0 references
Esta Operação prevê a implementação de um conjunto de medidas integradas de promoção da eficiência energética e de racionalização dos consumos nos sistemas de iluminação pública do concelho de Viana do Castelo, nomeadamente através da instalação de sistemas e tecnologias mais eficientes. (Portuguese)
0 references
This operation provides for the implementation of a set of integrated measures to promote energy efficiency and rationalise consumption in public lighting systems in the municipality of Viana do Castelo, notably through the installation of more efficient systems and technologies. (English)
8 July 2021
0 references
Cette opération prévoit la mise en œuvre d’un ensemble de mesures intégrées visant à promouvoir l’efficacité énergétique et à rationaliser la consommation dans les systèmes d’éclairage public de la commune de Viana do Castelo, notamment par l’installation de systèmes et de technologies plus efficaces. (French)
5 December 2021
0 references
Diese Maßnahme sieht die Durchführung einer Reihe integrierter Maßnahmen zur Förderung der Energieeffizienz und zur Rationalisierung des Verbrauchs an öffentlichen Beleuchtungssystemen der Gemeinde Viana do Castelo vor, insbesondere durch die Installation effizienterer Systeme und Technologien. (German)
13 December 2021
0 references
Viana do Castelo
0 references
Identifiers
NORTE-03-1203-FEDER-000202
0 references