Connecting the tapa station to bus, pedestrian and car traffic (Q3068007): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Collegamento della stazione di tapa al traffico di autobus, pedoni e auto | |||||||||||||||
Property / summary | |||||||||||||||
Come risultato del progetto, 679 m di strade a traffico leggero saranno costruiti. 428 m strade di accesso saranno riparate. Sarà costruito un parcheggio di 50 posti (34 posti in via Valve e 16 posti a sedere nel parcheggio Ambla mnt). 1 fermata dell'autobus sarà riparata. Deve essere installata una targa d'informazione per il traffico ferroviario (1 pz) e il traffico autobus (1 pz). Saranno costruiti 46 punti di illuminazione stradale. (Italian) | |||||||||||||||
Property / summary: Come risultato del progetto, 679 m di strade a traffico leggero saranno costruiti. 428 m strade di accesso saranno riparate. Sarà costruito un parcheggio di 50 posti (34 posti in via Valve e 16 posti a sedere nel parcheggio Ambla mnt). 1 fermata dell'autobus sarà riparata. Deve essere installata una targa d'informazione per il traffico ferroviario (1 pz) e il traffico autobus (1 pz). Saranno costruiti 46 punti di illuminazione stradale. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Come risultato del progetto, 679 m di strade a traffico leggero saranno costruiti. 428 m strade di accesso saranno riparate. Sarà costruito un parcheggio di 50 posti (34 posti in via Valve e 16 posti a sedere nel parcheggio Ambla mnt). 1 fermata dell'autobus sarà riparata. Deve essere installata una targa d'informazione per il traffico ferroviario (1 pz) e il traffico autobus (1 pz). Saranno costruiti 46 punti di illuminazione stradale. (Italian) / qualifier | |||||||||||||||
point in time: 12 January 2022
|
Revision as of 15:17, 12 January 2022
Project Q3068007 in Estonia
Language | Label | Description | Also known as |
---|---|---|---|
English | Connecting the tapa station to bus, pedestrian and car traffic |
Project Q3068007 in Estonia |
Statements
539,843.00 Euro
0 references
642,670.94 Euro
0 references
84.0 percent
0 references
20 May 2015
0 references
31 May 2018
0 references
Tapa Vallavalitsus
0 references
45107
0 references
Projekti tulemusel ehitatakse 679m kergliiklusteid. Remonditakse 428m juurdepääsuteed. Rajatakse 50 kohaline autoparkla (34 kohta Valve tänavale ja 16 kohta Ambla mnt parklas). Remonditakse 1 bussipeatus. Paigaldatakse infotahvel rongiliiklusele (1 tk) ja bussiliiklusele (1 tk). Rajatakse 46 tänavavalgustuspunkti. (Estonian)
0 references
As a result of the project, 679 m of light traffic roads will be built. 428 m access roads will be repaired. A car park of 50 seats will be built (34 seats on Valve street and 16 seats in Ambla mnt parking lot). 1 bus stop will be repaired. An information plaque shall be installed for train traffic (1 pcs) and bus traffic (1 pcs). 46 street lighting points will be built. (English)
16 August 2021
0 references
Grâce à ce projet, 679 m de routes légères seront construites. Des routes d’accès de 428 m seront réparées. Un parking de 50 places sera construit (34 places dans la rue Valve et 16 places dans le parking Ambla mnt). 1 arrêt de bus sera réparé. Une plaque d’information doit être installée pour le trafic ferroviaire (1 PC) et le trafic d’autobus (1 PC). 46 points d’éclairage public seront construits. (French)
26 November 2021
0 references
Als Ergebnis des Projekts werden 679 m Ampelstraßen gebaut. 428 m Zufahrtsstraßen werden repariert. Es wird ein Parkplatz mit 50 Sitzplätzen gebaut (34 Sitzplätze auf der Valve-Straße und 16 Sitzplätze auf dem Parkplatz Ambla mnt). 1 Bushaltestelle wird repariert. Für den Zugverkehr (1 Stück) und den Busverkehr (1 Stück) ist eine Informationstafel einzurichten. 46 Straßenbeleuchtungspunkte werden gebaut. (German)
30 November 2021
0 references
Als gevolg van het project zal 679 m lichte verkeerswegen worden aangelegd. 428 m toegangswegen worden gerepareerd. Er wordt een parkeerplaats van 50 zitplaatsen gebouwd (34 zitplaatsen op Valve straat en 16 zitplaatsen in Ambla mnt parkeerplaats). 1 bushalte wordt gerepareerd. Er moet een informatieplaatje worden geïnstalleerd voor treinverkeer (1 stuks) en busverkeer (1 stuks). 46 straatverlichtingspunten zullen worden gebouwd. (Dutch)
5 December 2021
0 references
Come risultato del progetto, 679 m di strade a traffico leggero saranno costruiti. 428 m strade di accesso saranno riparate. Sarà costruito un parcheggio di 50 posti (34 posti in via Valve e 16 posti a sedere nel parcheggio Ambla mnt). 1 fermata dell'autobus sarà riparata. Deve essere installata una targa d'informazione per il traffico ferroviario (1 pz) e il traffico autobus (1 pz). Saranno costruiti 46 punti di illuminazione stradale. (Italian)
12 January 2022
0 references
Identifiers
2014-2020.10.02.001.01.15-0036
0 references