Construction of the Rapid Via Lobos Chamber/Wolves Chamber Strait (Q2883678): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Bau der Schnellstraße Câmara de Lobos/Streito de Câmara de Lobos | |||||||||||||||
Property / summary | |||||||||||||||
Die 2,5 km lange Straßeninfrastruktur umfasst die Ausführung folgender Arbeiten: 2,498 km voller Gleis 2 unidirektionale Tunnel, einer von 330 m und der andere von 390 m 5 Viadukte, für eine Gesamtlänge von 871 m 8 Kunstwerke Strom (PI, PS, PA und PP) über eine kumulierte Erweiterung von 360 m 7 Restaurierungen auf das bestehende Straßennetz 3 Rotundas 3 Verbindungen (German) | |||||||||||||||
Property / summary: Die 2,5 km lange Straßeninfrastruktur umfasst die Ausführung folgender Arbeiten: 2,498 km voller Gleis 2 unidirektionale Tunnel, einer von 330 m und der andere von 390 m 5 Viadukte, für eine Gesamtlänge von 871 m 8 Kunstwerke Strom (PI, PS, PA und PP) über eine kumulierte Erweiterung von 360 m 7 Restaurierungen auf das bestehende Straßennetz 3 Rotundas 3 Verbindungen (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Die 2,5 km lange Straßeninfrastruktur umfasst die Ausführung folgender Arbeiten: 2,498 km voller Gleis 2 unidirektionale Tunnel, einer von 330 m und der andere von 390 m 5 Viadukte, für eine Gesamtlänge von 871 m 8 Kunstwerke Strom (PI, PS, PA und PP) über eine kumulierte Erweiterung von 360 m 7 Restaurierungen auf das bestehende Straßennetz 3 Rotundas 3 Verbindungen (German) / qualifier | |||||||||||||||
point in time: 13 December 2021
|
Revision as of 12:39, 13 December 2021
Project Q2883678 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the Rapid Via Lobos Chamber/Wolves Chamber Strait |
Project Q2883678 in Portugal |
Statements
41,213,399.0 Euro
0 references
48,486,352.0 Euro
0 references
85.0 percent
0 references
1 January 2014
0 references
31 December 2020
0 references
SECRETARIA REGIONAL DE EQUIPAMENTOS E INFRAESTRUTURAS
0 references
A infraestrutura rodoviária, com 2,5km de extensão, inclui a execução dos seguintes trabalhos: 2,498 Km de plena via 2 Túneis unidireccionais, um de 330m e outro de 390m 5 Viadutos, numa extensão total de 871m 8 Obras de arte Correntes (PI, PS, PA e PP) numa extensão acumulada de 360 m 7 Restabelecimentos à rede viária existente 3 Rotundas 3 Arruamentos de ligação (Portuguese)
0 references
The road infrastructure, with 2.5 km of extension, includes the execution of the following works: 2.498 Km of full road 2 unidirectional tunnels, one of 330 m and another of 390 m 5 Viaducts, in a total length of 871 m 8 Current Artworks (PI, PS, PA and PP) in a cumulative extension of 360 m 7 restorations to the existing road network 3 Rotundas 3 connecting streets (English)
7 July 2021
0 references
L’infrastructure routière, de 2,5 km de long, comprend l’exécution des travaux suivants: 2,498 km de voies complètes 2 tunnels unidirectionnels, l’un de 330 m et l’autre de 390 m 5 Viaducs, pour une longueur totale de 871 m 8 œuvres d’art Courant (PI, PS, PA et PP) sur une extension cumulée de 360 m 7 restaurations au réseau routier existant 3 Rotundas 3 Connexions (French)
5 December 2021
0 references
Die 2,5 km lange Straßeninfrastruktur umfasst die Ausführung folgender Arbeiten: 2,498 km voller Gleis 2 unidirektionale Tunnel, einer von 330 m und der andere von 390 m 5 Viadukte, für eine Gesamtlänge von 871 m 8 Kunstwerke Strom (PI, PS, PA und PP) über eine kumulierte Erweiterung von 360 m 7 Restaurierungen auf das bestehende Straßennetz 3 Rotundas 3 Verbindungen (German)
13 December 2021
0 references
Câmara de Lobos, Câmara de Lobos
0 references
Identifiers
M1420-06-2756-FEDER-000002
0 references