Removal of EB Fibrocement from Barreiro (Q2881961): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Entfernung von Fibrocement EB aus Barreiro | |||||||||||||||
Property / summary | |||||||||||||||
Es soll dem Gebäude der EB-Barreiro-Schule ein neues Dach zur Verfügung stellen, es mit neuen asbestfreien Materialien umbauen, die zum Gebäude mehr thermischen Komfort und bessere wasserdichte Bedingungen fördern und so zur Erhöhung der Deckungsrate der Grundschulen in der Union von Bairros von Alto Seixalinho, Santo André und Verderena beitragen. (German) | |||||||||||||||
Property / summary: Es soll dem Gebäude der EB-Barreiro-Schule ein neues Dach zur Verfügung stellen, es mit neuen asbestfreien Materialien umbauen, die zum Gebäude mehr thermischen Komfort und bessere wasserdichte Bedingungen fördern und so zur Erhöhung der Deckungsrate der Grundschulen in der Union von Bairros von Alto Seixalinho, Santo André und Verderena beitragen. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Es soll dem Gebäude der EB-Barreiro-Schule ein neues Dach zur Verfügung stellen, es mit neuen asbestfreien Materialien umbauen, die zum Gebäude mehr thermischen Komfort und bessere wasserdichte Bedingungen fördern und so zur Erhöhung der Deckungsrate der Grundschulen in der Union von Bairros von Alto Seixalinho, Santo André und Verderena beitragen. (German) / qualifier | |||||||||||||||
point in time: 13 December 2021
|
Revision as of 12:22, 13 December 2021
Project Q2881961 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Removal of EB Fibrocement from Barreiro |
Project Q2881961 in Portugal |
Statements
70,990.0 Euro
0 references
141,980.0 Euro
0 references
50.0 percent
0 references
1 June 2020
0 references
31 December 2020
0 references
MUNICÍPIO DO BARREIRO
0 references
Pretende-se dotar o edifício da Escola EB Barreiro com uma nova cobertura, reconstruindo-a com novos materiais isentos de amianto, que promovam ao edificado um maior conforto térmico e melhores condições de estanquidade, contribuindo deste modo, para o aumento da taxa de cobertura da requalificação das escolas do ensino básico na União de Freguesias de Alto Seixalinho, Santo André e Verderena. (Portuguese)
0 references
It is intended to provide the building of the EB Barreiro School with a new roof, rebuilding it with new materials free of asbestos, that promote to the building greater thermal comfort and better conditions of leakage, thus contributing to the increase of the rate of coverage of the requalification of primary schools in the Union of Freguesias of Alto Seixalinho, Santo André and Verderena. (English)
7 July 2021
0 references
Il est destiné à fournir la construction de l’école EB Barreiro avec un nouveau toit, le reconstruire avec de nouveaux matériaux sans amiante, qui favorisent au bâtiment un plus grand confort thermique et de meilleures conditions étanches à l’eau, contribuant ainsi à l’augmentation du taux de couverture de la requalification des écoles élémentaires dans l’Union de Bairros d’Alto Seixalinho, Santo André et Verderena. (French)
5 December 2021
0 references
Es soll dem Gebäude der EB-Barreiro-Schule ein neues Dach zur Verfügung stellen, es mit neuen asbestfreien Materialien umbauen, die zum Gebäude mehr thermischen Komfort und bessere wasserdichte Bedingungen fördern und so zur Erhöhung der Deckungsrate der Grundschulen in der Union von Bairros von Alto Seixalinho, Santo André und Verderena beitragen. (German)
13 December 2021
0 references
Barreiro, União das freguesias de Alto do Seixalinho, Santo André e Verderena
0 references
Identifiers
LISBOA-07-5673-FEDER-000091
0 references