Requalification of the Historic Center of the Royal Palace (Q2863392): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Neuqualifizierung des historischen Zentrums des Königspalastes | |||||||||||||||
Property / summary | |||||||||||||||
Die Gemeinde Rio Maior beabsichtigt, einige der bestehenden Gebäude zu sanieren, indem neue Funktionen eingeführt werden, die die soziokulturelle Dynamik des historischen Zentrums stimulieren. Diese Intervention zielt darauf ab, die historische Vergangenheit auf die heutigen Erfahrungen zu aggregieren und umzusetzen, unter Bedingungen, um die „Geschichte der Geschichte von Rio Maior“ neu zu gestalten und diesen Pol auch Teil des Kreises polynukleierter Besuche zu machen. (German) | |||||||||||||||
Property / summary: Die Gemeinde Rio Maior beabsichtigt, einige der bestehenden Gebäude zu sanieren, indem neue Funktionen eingeführt werden, die die soziokulturelle Dynamik des historischen Zentrums stimulieren. Diese Intervention zielt darauf ab, die historische Vergangenheit auf die heutigen Erfahrungen zu aggregieren und umzusetzen, unter Bedingungen, um die „Geschichte der Geschichte von Rio Maior“ neu zu gestalten und diesen Pol auch Teil des Kreises polynukleierter Besuche zu machen. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Die Gemeinde Rio Maior beabsichtigt, einige der bestehenden Gebäude zu sanieren, indem neue Funktionen eingeführt werden, die die soziokulturelle Dynamik des historischen Zentrums stimulieren. Diese Intervention zielt darauf ab, die historische Vergangenheit auf die heutigen Erfahrungen zu aggregieren und umzusetzen, unter Bedingungen, um die „Geschichte der Geschichte von Rio Maior“ neu zu gestalten und diesen Pol auch Teil des Kreises polynukleierter Besuche zu machen. (German) / qualifier | |||||||||||||||
point in time: 13 December 2021
|
Revision as of 09:28, 13 December 2021
Project Q2863392 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Requalification of the Historic Center of the Royal Palace |
Project Q2863392 in Portugal |
Statements
422,463.0 Euro
0 references
497,015.0 Euro
0 references
85.0 percent
0 references
1 August 2016
0 references
31 December 2017
0 references
MUNICÍPIO DE RIO MAIOR
0 references
O município de Rio Maior pretende reabilitar alguns dos edifícios existentes, introduzindo novas funções que estimulem as dinâmicas socioculturais do centro histórico. Esta intervenção visa agregar e transpor o passado histórico para as vivências dos nossos dias, com condições de recrear as "Histórias da Historia de Rio Maior", fazendo, também, este polo parte do circuito de visitas polinucleado. (Portuguese)
0 references
The municipality of Rio Maior intends to rehabilitate some of the existing buildings, introducing new functions that stimulate the sociocultural dynamics of the historical center. This intervention aims to aggregate and transpose the historical past into the experiences of our day, with conditions to recreate the “History of the History of Rio Maior”, also making this pole part of the circuit of polynucleated visits. (English)
6 July 2021
0 references
La municipalité de Rio Maior a l’intention de réhabiliter certains bâtiments existants en introduisant de nouvelles fonctions qui stimulent la dynamique socioculturelle du centre historique. Cette intervention vise à agréger et à transposer le passé historique aux expériences d’aujourd’hui, avec des conditions pour recréer l’«Histoire de l’Histoire de Rio Maior», faisant également partie de ce pôle du circuit des visites polynucléées. (French)
4 December 2021
0 references
Die Gemeinde Rio Maior beabsichtigt, einige der bestehenden Gebäude zu sanieren, indem neue Funktionen eingeführt werden, die die soziokulturelle Dynamik des historischen Zentrums stimulieren. Diese Intervention zielt darauf ab, die historische Vergangenheit auf die heutigen Erfahrungen zu aggregieren und umzusetzen, unter Bedingungen, um die „Geschichte der Geschichte von Rio Maior“ neu zu gestalten und diesen Pol auch Teil des Kreises polynukleierter Besuche zu machen. (German)
13 December 2021
0 references
Rio Maior
0 references
Identifiers
ALT20-04-2316-FEDER-000023
0 references