Protection and requalification of the coastline in Porto Pim and the Port of Feteira (Q2853779): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed label, description and/or aliases in de, and other parts: Adding German translations) |
||||||||||||||
label / de | label / de | ||||||||||||||
Schutz und Neuqualifizierung der Küste in Porto Pim und Porto da Feteira | |||||||||||||||
Property / summary | |||||||||||||||
Dieses Projekt umfasst zwei Maßnahmen, die auf der Insel Faial im Hinblick auf den Küstenschutz durchgeführt werden sollen, nämlich in Porto de Pim und Porto da Feteira. Die erste Intervention besteht in der Instandsetzung der Räumlichkeiten und der Durchführung eines an der Wand befestigten Schutzes durch die Durchführung eines einstufigen Twisting Prismens von 10 bis 20 kN, basierend auf dem natürlichen Gelände, das an der bestehenden Wand festhält.Die zweite Intervention besteht in der Reinigung (German) | |||||||||||||||
Property / summary: Dieses Projekt umfasst zwei Maßnahmen, die auf der Insel Faial im Hinblick auf den Küstenschutz durchgeführt werden sollen, nämlich in Porto de Pim und Porto da Feteira. Die erste Intervention besteht in der Instandsetzung der Räumlichkeiten und der Durchführung eines an der Wand befestigten Schutzes durch die Durchführung eines einstufigen Twisting Prismens von 10 bis 20 kN, basierend auf dem natürlichen Gelände, das an der bestehenden Wand festhält.Die zweite Intervention besteht in der Reinigung (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Dieses Projekt umfasst zwei Maßnahmen, die auf der Insel Faial im Hinblick auf den Küstenschutz durchgeführt werden sollen, nämlich in Porto de Pim und Porto da Feteira. Die erste Intervention besteht in der Instandsetzung der Räumlichkeiten und der Durchführung eines an der Wand befestigten Schutzes durch die Durchführung eines einstufigen Twisting Prismens von 10 bis 20 kN, basierend auf dem natürlichen Gelände, das an der bestehenden Wand festhält.Die zweite Intervention besteht in der Reinigung (German) / qualifier | |||||||||||||||
point in time: 13 December 2021
|
Revision as of 08:38, 13 December 2021
Project Q2853779 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Protection and requalification of the coastline in Porto Pim and the Port of Feteira |
Project Q2853779 in Portugal |
Statements
89,903.0 Euro
0 references
105,769.0 Euro
0 references
85.0 percent
0 references
14 October 2014
0 references
30 June 2016
0 references
SECRETARIA REGIONAL DO MAR E DAS PESCAS
0 references
O presente projeto contempla duas intervenções a realizar na ilha do Faial, tendo em vista a proteção costeira, designadamente em Porto de Pim e no Porto da Feteira. A primeira intervenção consiste na reparação das locas e na execução de uma proteção aderente à muralha, através da execução de um prisma de enrocamento de gama única de 10 a 20 kN, assente sob o terreno natural aderente à muralha existente.A segunda intervenção consiste na limpe (Portuguese)
0 references
The present project includes two interventions on the island of Faial, with a view to coastal protection, in particular at the Port of Pim and the Port of Feteira. The first intervention consists of the repair of the locations and the execution of a protection adherent to the wall, through the execution of a single-range screwing prism of 10 to 20 kN, based on the natural terrain adherent to the existing wall.The second intervention consists of the cleanliness (English)
6 July 2021
0 references
Ce projet comprend deux interventions à mener sur l’île de Faial, en vue de la protection des côtes, à savoir Porto de Pim et Porto da Feteira. La première intervention consiste en la réparation des locaux et la mise en œuvre d’une protection attachée au mur, par l’exécution d’un prisme tordu à une seule portée de 10 à 20 kN, basé sur le terrain naturel adhérant au mur existant.La seconde intervention consiste en un nettoyage (French)
4 December 2021
0 references
Dieses Projekt umfasst zwei Maßnahmen, die auf der Insel Faial im Hinblick auf den Küstenschutz durchgeführt werden sollen, nämlich in Porto de Pim und Porto da Feteira. Die erste Intervention besteht in der Instandsetzung der Räumlichkeiten und der Durchführung eines an der Wand befestigten Schutzes durch die Durchführung eines einstufigen Twisting Prismens von 10 bis 20 kN, basierend auf dem natürlichen Gelände, das an der bestehenden Wand festhält.Die zweite Intervention besteht in der Reinigung (German)
13 December 2021
0 references
Horta
0 references
Identifiers
ACORES-05-1809-FEDER-000006
0 references