Construction of infrastructure for non-motorised transport in the territory of the town of Humenné (Q3102042): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Costruzione di infrastrutture per trasporti non motorizzati a Humenné
Property / summary
 
L'obiettivo del presente progetto "Costruzione di infrastrutture per il trasporto non a motore nella città di Humenné" è quello di aumentare l'attrattiva e la capacità di trasporto del trasporto non motorizzato — pedalando sul numero totale di passeggeri trasportati, attraverso due attività principali, che consistono nella costruzione di una pista ciclabile di collegamento dal vecchio ponte Valaškovský alla pista ciclabile presso la diga vicino a Laborec e l'infrastruttura ciclabile supplementare all'interno della quale è affrontata la posizione dei cavalletti ciclabili con tetti e stand ciclistici lungo la pista ciclabile costruita e pianificata. Il progetto creerà le condizioni per una migliore mobilità degli abitanti della città, contribuendo a una rete di piste ciclabili sufficientemente costruita e compatta in città. Essa contribuirà inoltre a modificare la divisione dei lavori di trasporto a favore di modi di trasporto più rispettosi dell'ambiente e a un aumento della quota della bicicletta, alleggerendo in tal modo i centri urbani da un graduale aumento del tasso di assistenza e creando un effetto ambientale positivo in termini di riduzione dell'inquinamento atmosferico, del rumore e delle vibrazioni.  Il progetto è in linea con le attività ammissibili, in quanto sarà dedicato alle infrastrutture per il trasporto non a motore e alla promozione e all'aumento dell'attrattiva della bicicletta per il pubblico. Il presente progetto garantirà che le infrastrutture ciclabili esistenti o previste siano interconnesse con l'infrastruttura civile, la zona industriale e l'infrastruttura per il trasporto pubblico di passeggeri. Il progetto corrisponde pienamente ai documenti di strategia in materia di trasporti. Gli indicatori misurabili sono: Lunghezza delle strade ciclabili nuove = 0,2174 km; Numero di elementi aggiuntivi dell'infrastruttura ciclistica creati= 7. (Italian)
Property / summary: L'obiettivo del presente progetto "Costruzione di infrastrutture per il trasporto non a motore nella città di Humenné" è quello di aumentare l'attrattiva e la capacità di trasporto del trasporto non motorizzato — pedalando sul numero totale di passeggeri trasportati, attraverso due attività principali, che consistono nella costruzione di una pista ciclabile di collegamento dal vecchio ponte Valaškovský alla pista ciclabile presso la diga vicino a Laborec e l'infrastruttura ciclabile supplementare all'interno della quale è affrontata la posizione dei cavalletti ciclabili con tetti e stand ciclistici lungo la pista ciclabile costruita e pianificata. Il progetto creerà le condizioni per una migliore mobilità degli abitanti della città, contribuendo a una rete di piste ciclabili sufficientemente costruita e compatta in città. Essa contribuirà inoltre a modificare la divisione dei lavori di trasporto a favore di modi di trasporto più rispettosi dell'ambiente e a un aumento della quota della bicicletta, alleggerendo in tal modo i centri urbani da un graduale aumento del tasso di assistenza e creando un effetto ambientale positivo in termini di riduzione dell'inquinamento atmosferico, del rumore e delle vibrazioni.  Il progetto è in linea con le attività ammissibili, in quanto sarà dedicato alle infrastrutture per il trasporto non a motore e alla promozione e all'aumento dell'attrattiva della bicicletta per il pubblico. Il presente progetto garantirà che le infrastrutture ciclabili esistenti o previste siano interconnesse con l'infrastruttura civile, la zona industriale e l'infrastruttura per il trasporto pubblico di passeggeri. Il progetto corrisponde pienamente ai documenti di strategia in materia di trasporti. Gli indicatori misurabili sono: Lunghezza delle strade ciclabili nuove = 0,2174 km; Numero di elementi aggiuntivi dell'infrastruttura ciclistica creati= 7. (Italian) / rank
 
Normal rank
Property / summary: L'obiettivo del presente progetto "Costruzione di infrastrutture per il trasporto non a motore nella città di Humenné" è quello di aumentare l'attrattiva e la capacità di trasporto del trasporto non motorizzato — pedalando sul numero totale di passeggeri trasportati, attraverso due attività principali, che consistono nella costruzione di una pista ciclabile di collegamento dal vecchio ponte Valaškovský alla pista ciclabile presso la diga vicino a Laborec e l'infrastruttura ciclabile supplementare all'interno della quale è affrontata la posizione dei cavalletti ciclabili con tetti e stand ciclistici lungo la pista ciclabile costruita e pianificata. Il progetto creerà le condizioni per una migliore mobilità degli abitanti della città, contribuendo a una rete di piste ciclabili sufficientemente costruita e compatta in città. Essa contribuirà inoltre a modificare la divisione dei lavori di trasporto a favore di modi di trasporto più rispettosi dell'ambiente e a un aumento della quota della bicicletta, alleggerendo in tal modo i centri urbani da un graduale aumento del tasso di assistenza e creando un effetto ambientale positivo in termini di riduzione dell'inquinamento atmosferico, del rumore e delle vibrazioni.  Il progetto è in linea con le attività ammissibili, in quanto sarà dedicato alle infrastrutture per il trasporto non a motore e alla promozione e all'aumento dell'attrattiva della bicicletta per il pubblico. Il presente progetto garantirà che le infrastrutture ciclabili esistenti o previste siano interconnesse con l'infrastruttura civile, la zona industriale e l'infrastruttura per il trasporto pubblico di passeggeri. Il progetto corrisponde pienamente ai documenti di strategia in materia di trasporti. Gli indicatori misurabili sono: Lunghezza delle strade ciclabili nuove = 0,2174 km; Numero di elementi aggiuntivi dell'infrastruttura ciclistica creati= 7. (Italian) / qualifier
 
point in time: 12 January 2022
Timestamp+2022-01-12T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 08:41, 12 January 2022

Project Q3102042 in Slovakia
Language Label Description Also known as
English
Construction of infrastructure for non-motorised transport in the territory of the town of Humenné
Project Q3102042 in Slovakia

    Statements

    0 references
    105,043.91 Euro
    0 references
    123,581.07 Euro
    0 references
    85.0 percent
    0 references
    1 June 2020
    0 references
    1 May 2021
    0 references
    Mesto Humenné
    0 references
    0 references

    48°56'1.97"N, 21°54'38.59"E
    0 references
    Zámerom predkladaného projektu "Výstavba infraštruktúry pre nemotorovú dopravu na území mesta Humenné" je zvýšenie atraktivity a prepravnej kapacity nemotorovej dopravy - cyklistickej dopravy na celkovom počte prepravovaných osôb a to prostredníctvom dvoch hlavných aktivít, ktoré spočívajú vo výstavbe prepojovacieho cyklochodníka od starého Valaškovského mosta po cyklochodník na hrádzi pri Laborci a doplnkovej cyklistickej infraštruktúry v rámci ktorej sa rieši umiestnenie cyklostojanov s prestrešením a cyklostojanov pozdĺž vybudovaného a plánovaného cyklochodníka. Projekt  vytvorí podmienky pre lepšiu mobilitu obyvateľov mesta tým, že prispeje k dostatočne vybudovanej  a kompaktnej sieti cyklotrás v meste. Ďalej prispeje k zmene deľby prepravnej práce v prospech environmentálne priaznivejších módov dopravy a k zvýšeniu podielu využívania cyklistickej dopravy, čím odľahčí centrá miest  od postupne narastajúcej miery automobilizácie a vytvorí pozitívny environmentálny efekt v podobe zníženia miery znečistenia ovzdušia, hluku a vibrácií.  Projekt je v súlade s oprávnenými aktivitami, nakoľko sa bude venovať infraštruktúre pre nemotorovú dopravu a propagácii a zvyšovaniu atraktivity cyklistickej dopravy pre verejnosť. Predkladaným projektom sa zabezpečí prepojenosť existujúcej resp.plánovanej cyklistickej infraštruktúry s občianskou infraštruktúrou, priemyselnou zónou a infraštruktúru verejnej osobnej dopravy. Projekt plne korešponduje s príslušnými strategickými dokumentmi pre oblasť dopravy. Merateľnými ukazovateľmi sú: Dĺžka nových úsekov cyklistických komunikácií= 0,2174     km; Počet vytvorených prvkov doplnkovej cyklistickej infraštruktúry= 7. (Slovak)
    0 references
    The aim of the present project “Construction of infrastructure for non-motor transport in the city of Humenné” is to increase the attractiveness and transport capacity of non-motorised transport – cycling on the total number of passengers transported, through two main activities, which consist of the construction of a connecting cycle path from the old Valaškovský bridge to the cycling path at the dam near Laborec and the additional cycling infrastructure within which the location of cycling stands with roofing and cycling stands along the built and planned cycling pathway is addressed. The project will create conditions for better mobility of the city’s inhabitants by contributing to a sufficiently built and compact network of cycle paths in the city. It will also contribute to a change in the division of transport work in favour of more environmentally friendly modes of transport and to an increase in the share of cycling, thus lightening urban centres from a gradually increasing rate of caring and creating a positive environmental effect in terms of reducing air pollution, noise and vibration.  The project is in line with the eligible activities, as it will be dedicated to infrastructure for non-motor transport and to promoting and increasing the attractiveness of cycling to the public. The present project will ensure that existing or planned cycling infrastructure is interconnected with the civil infrastructure, the industrial zone and the public passenger transport infrastructure. The project fully corresponds with the relevant transport strategy papers. Measurable indicators are: Length of new cycle roads = 0.2174 km; Number of additional cycling infrastructure elements created= 7. (English)
    28 September 2021
    0 references
    L’objectif du présent projet «Construction d’infrastructures pour le transport non motorisé dans la ville de Humenné» est d’accroître l’attractivité et la capacité de transport des transports non motorisés — à vélo sur le nombre total de passagers transportés, par le biais de deux activités principales, qui consistent en la construction d’une piste cyclable reliant l’ancien pont de Valaškovský à la piste cyclable du barrage près de Laborec et l’infrastructure cyclable supplémentaire au sein de laquelle l’emplacement des stands cyclables avec toitures et stands cyclables le long de la piste cyclable construite et prévue est abordé. Le projet créera les conditions d’une meilleure mobilité des habitants de la ville en contribuant à un réseau suffisamment construit et compact de pistes cyclables dans la ville. Elle contribuera également à une modification de la répartition des travaux de transport en faveur de modes de transport plus respectueux de l’environnement et à une augmentation de la part du vélo, ce qui allégera les centres urbains à partir d’un rythme croissant de soins et créera un effet positif sur l’environnement en termes de réduction de la pollution de l’air, du bruit et des vibrations.  Le projet est conforme aux activités éligibles, étant donné qu’il sera consacré aux infrastructures de transport non motorisé et à la promotion et à l’augmentation de l’attrait du vélo auprès du public. Le présent projet permettra d’assurer l’interconnexion des infrastructures cyclables existantes ou prévues avec les infrastructures civiles, la zone industrielle et les infrastructures de transport public de voyageurs. Le projet correspond pleinement aux documents de stratégie pertinents en matière de transport. Les indicateurs mesurables sont les suivants: Longueur des nouvelles routes cyclables = 0,2174 km; Nombre d’éléments d’infrastructure cyclable supplémentaires créés= 7. (French)
    27 November 2021
    0 references
    Ziel des vorliegenden Projekts „Konstruktion der Infrastruktur für den nichtmotorischen Verkehr in der Stadt Humenné“ ist es, die Attraktivität und die Transportkapazität des nicht motorisierten Verkehrs zu erhöhen – Radfahren auf der Gesamtzahl der beförderten Personen durch zwei Hauptaktivitäten, die im Bau eines Verbindungsradwegs von der alten Valaškovský Brücke zum Radweg am Damm bei Laborec und der zusätzlichen Radinfrastruktur bestehen, in der die Lage des Radsports mit Dach- und Fahrradständen entlang des gebauten und geplanten Radweges angesprochen wird. Das Projekt wird die Voraussetzungen für eine bessere Mobilität der Einwohner der Stadt schaffen, indem es zu einem ausreichend gebauten und kompakten Netz von Radwegen in der Stadt beiträgt. Sie wird auch zu einer Änderung der Verkehrsteilung zugunsten umweltfreundlicherer Verkehrsträger und zu einer Erhöhung des Anteils des Radverkehrs beitragen, wodurch die städtischen Zentren von einer allmählich steigenden Betreuungsrate abgeschwächt werden und eine positive Umweltwirkung im Hinblick auf die Verringerung der Luftverschmutzung, Lärm und Vibrationen entsteht.  Das Projekt steht im Einklang mit den förderfähigen Aktivitäten, da es sich um Infrastrukturen für den nicht motorischen Verkehr und die Förderung und Steigerung der Attraktivität des Radverkehrs für die Öffentlichkeit handelt. Mit dem vorliegenden Projekt wird sichergestellt, dass die bestehende oder geplante Fahrradinfrastruktur mit der zivilen Infrastruktur, dem Industriegebiet und der öffentlichen Personenverkehrsinfrastruktur verbunden ist. Das Projekt entspricht voll und ganz den einschlägigen Verkehrsstrategiepapieren. Messbare Indikatoren sind: Länge der neuen Radwege = 0,2174 km; Anzahl der zusätzlichen Elemente der Fahrradinfrastruktur = 7. (German)
    29 November 2021
    0 references
    Het doel van dit project „Bouw van infrastructuur voor niet-motorisch vervoer in de stad Humenné” is de aantrekkelijkheid en de vervoerscapaciteit van niet-gemotoriseerd vervoer te vergroten — fietsen op het totale aantal passagiers dat wordt vervoerd, door middel van twee hoofdactiviteiten, die bestaan uit de aanleg van een verbindingsfietspad van de oude Valaškovský-brug naar het fietspad bij de dam bij Laborec en de extra fietsinfrastructuur waarbinnen de locatie van de fiets met dakbedekking en fietsen staat langs het aangelegde en geplande fietspad. Het project zal de voorwaarden scheppen voor een betere mobiliteit van de inwoners van de stad door bij te dragen aan een voldoende gebouwd en compact netwerk van fietspaden in de stad. Het zal ook bijdragen tot een verandering in de verdeling van de vervoerswerkzaamheden ten gunste van milieuvriendelijkere vervoerswijzen en tot een toename van het aandeel van fietsen, waardoor de stedelijke centra worden verlicht door een geleidelijk toenemende zorg en een positief effect op het milieu in termen van vermindering van luchtverontreiniging, geluidshinder en trillingen.  Het project is in overeenstemming met de in aanmerking komende activiteiten, aangezien het zal worden gewijd aan infrastructuur voor niet-motorisch vervoer en aan het bevorderen en vergroten van de aantrekkelijkheid van fietsen voor het publiek. Het huidige project zal ervoor zorgen dat de bestaande of geplande fietsinfrastructuur wordt gekoppeld aan de civiele infrastructuur, de industriezone en de infrastructuur voor openbaar personenvervoer. Het project stemt volledig overeen met de relevante vervoersstrategiedocumenten. Meetbare indicatoren zijn: Lengte van nieuwe fietswegen = 0,2174 km; Aantal extra elementen van de fietsinfrastructuur = 7. (Dutch)
    4 December 2021
    0 references
    L'obiettivo del presente progetto "Costruzione di infrastrutture per il trasporto non a motore nella città di Humenné" è quello di aumentare l'attrattiva e la capacità di trasporto del trasporto non motorizzato — pedalando sul numero totale di passeggeri trasportati, attraverso due attività principali, che consistono nella costruzione di una pista ciclabile di collegamento dal vecchio ponte Valaškovský alla pista ciclabile presso la diga vicino a Laborec e l'infrastruttura ciclabile supplementare all'interno della quale è affrontata la posizione dei cavalletti ciclabili con tetti e stand ciclistici lungo la pista ciclabile costruita e pianificata. Il progetto creerà le condizioni per una migliore mobilità degli abitanti della città, contribuendo a una rete di piste ciclabili sufficientemente costruita e compatta in città. Essa contribuirà inoltre a modificare la divisione dei lavori di trasporto a favore di modi di trasporto più rispettosi dell'ambiente e a un aumento della quota della bicicletta, alleggerendo in tal modo i centri urbani da un graduale aumento del tasso di assistenza e creando un effetto ambientale positivo in termini di riduzione dell'inquinamento atmosferico, del rumore e delle vibrazioni.  Il progetto è in linea con le attività ammissibili, in quanto sarà dedicato alle infrastrutture per il trasporto non a motore e alla promozione e all'aumento dell'attrattiva della bicicletta per il pubblico. Il presente progetto garantirà che le infrastrutture ciclabili esistenti o previste siano interconnesse con l'infrastruttura civile, la zona industriale e l'infrastruttura per il trasporto pubblico di passeggeri. Il progetto corrisponde pienamente ai documenti di strategia in materia di trasporti. Gli indicatori misurabili sono: Lunghezza delle strade ciclabili nuove = 0,2174 km; Numero di elementi aggiuntivi dell'infrastruttura ciclistica creati= 7. (Italian)
    12 January 2022
    0 references

    Identifiers

    302011M332
    0 references