Increase the connectivity of new renewable electricity generation units through the construction and modernisation of the SN network at the Olsztyn ENERGA-OPERATOR SA Branch (Q131699): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: contained in NUTS (P1845): Olsztyński (Q2577186), Removing duplicate contained in NUTS)
(‎Removed claim: contained in NUTS (P1845): Olsztyński (Q2577186), Removing duplicate contained in NUTS)
Property / contained in NUTS
 
Property / contained in NUTS: Olsztyński / rank
Normal rank
 

Revision as of 21:29, 3 December 2021

Project Q131699 in Poland
Language Label Description Also known as
English
Increase the connectivity of new renewable electricity generation units through the construction and modernisation of the SN network at the Olsztyn ENERGA-OPERATOR SA Branch
Project Q131699 in Poland

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    3,761,728.26 zloty
    0 references
    902,814.78 Euro
    13 January 2020
    0 references
    6,358,567.04 zloty
    0 references
    1,526,056.09 Euro
    13 January 2020
    0 references
    59.16 percent
    0 references
    24 October 2018
    0 references
    30 June 2019
    0 references
    ENERGA-OPERATOR SPÓŁKA AKCYJNA
    0 references
    0 references

    54°5'12.1"N, 20°54'31.7"E
    0 references

    53°35'46.0"N, 19°34'34.0"E
    0 references

    54°2'53.9"N, 21°8'31.9"E
    0 references

    53°44'57.1"N, 21°20'28.3"E
    0 references

    53°21'41.0"N, 20°25'39.4"E
    0 references

    53°59'56.0"N, 22°19'6.2"E
    0 references

    53°44'52.8"N, 20°14'3.8"E
    0 references

    53°55'13.1"N, 19°44'30.1"E
    0 references

    53°54'43.2"N, 19°55'40.8"E
    0 references

    53°42'10.1"N, 19°57'46.4"E
    0 references
    Zakres projektu obejmuje budowę i przebudowę linii elektroenergetycznych średniego napięcia (SN) zlokalizowanych na terenie działania Oddziału Olsztyn ENERGA-OPERATOR SA Projekt obejmuje 9 zadań inwestycyjnych planowanych do realizacji w 2018 i 2019 r. na terenie województwa warmińsko-mazurskiego, na obszarze gmin: Małdyty, Morąg, Nidzica miasto, Bisztynek, Reszel, Piecki, Świętajno, Ostróda, Gietrzwałd, Iława i Iława Miasto. Szczegółowy zakres, tj. precyzyjne określenie miejsca Projektu (gminy, miejscowości, adresy i nr działek), zakres rzeczowy poszczególnych zadań (elementy techniczne, rodzaj infrastruktury, ilości) opis wybranego rozwiązania i techniczne uwarunkowania realizacyjne wraz z określeniem czy elementy infrastruktury są nowe, modernizowane, adaptowane czy niepodlegające modernizacji zawiera rozdział 2.2 studium wykonalności oraz Załącznik 1 do studium wykonalności. Zakres rzeczowy Projektu i wybrane rozwiązania technologiczne obejmują: budowę nowych powiązań kablowych istniejących linii SN oraz jednego nowego wyprowadzenia kablowego z GPZ, przebudowę wyprowadzeń oraz podejść linii kablowych SN z GPZ, wymianę starych nieizolowanych, napowietrznych przewodów elektroenergetycznych na odcinku istniejącej linii średniego napięcia 15 kV na nowe, niepełnoizolowane. Proponowane zadania inwestycyjne pozwolą zwiększyć możliwości przyłączania do sieci nowych jednostek wytwórczych energii elektrycznej z OZE oraz mikroinstalacji w sposób zapewniający bezpieczeństwo funkcjonowania sieci elektroenergetycznych OSD. Długość nowowobudowanej sieci 21,205 km. Długość zmodernizowanej sieci 2,475 km. (Polish)
    0 references
    The scope of the project includes the construction and reconstruction of medium voltage power lines (SN) located on the premises of the Olsztyn ENERGA-OPERATOR SA Branch The project comprises 9 investment tasks planned to be carried out in 2018 and 2019 in the Warmia-Mazury Voivodeship, in the area of communes: Małdyty, Morąg, Nidzica town, Bishtynek, Reszel, Piecki, Swiejno, Ostróda, Gietrzwald, Iława and Iława City. The detailed scope, i.e. precise determination of the location of the Project (communities, towns, addresses and plots), the material scope of individual tasks (technical elements, type of infrastructure, quantity) description of the chosen solution and technical implementation conditions, together with the determination of whether the infrastructure elements are new, modernised, adapted or not to be modernised, includes chapter 2.2 of the feasibility study and Appendix 1 to the feasibility study. The Project’s material scope and selected technological solutions include: construction of new cable connections of existing SN lines and one new cable outlet from GPZ, reconstruction of outlets and approaches of cable lines SN from GPZ, replacement of old non-insulated overhead power cables on the section of the existing medium voltage line of 15 kV with new, insulated. The proposed investment tasks will increase the ability to connect new RES generation units and micro-installations to the grid in such a way as to ensure the safety of OSD electricity grids. The length of the new network is 21.205 km. The length of the upgraded network is 2.475 km. (English)
    21 October 2020
    0 references
    Le projet comprend la construction et la reconstruction de lignes électriques à moyenne tension (SN) situées dans la zone d’exploitation de la branche Olsztyn ENERGA-OPERATOR SA. Le projet couvre 9 projets d’investissement dont la mise en œuvre est prévue en 2018 et 2019 dans la voïvodie de Warmińsko-Mazurskie, dans les communes: Małdyty, Morąg, Nidzica, Bishtinek, Reszel, Piecki, Noël, Ostróda, Gietrzwałd, Iława et Iława City. Le champ d’application détaillé, c’est-à-dire l’emplacement précis du projet (municipalités, localités, adresses et numéros de parcelle), la portée matérielle des différentes tâches (éléments techniques, type d’infrastructure, quantités), la description de la solution choisie et les conditions de mise en œuvre technique, ainsi que la détermination de la nouveauté, de la modernisation, de l’adaptation ou non de la modernisation des éléments d’infrastructure, voir le chapitre 2.2 de l’étude de faisabilité et l’annexe 1 de l’étude de faisabilité. Le champ d’application matériel du projet et les solutions technologiques sélectionnées comprennent: construction de nouvelles connexions de câbles des lignes SN existantes et d’une nouvelle sortie de câble de GPZ, reconstruction des sorties et approches des lignes de câbles SN à partir de GPZ, remplacement des anciennes lignes aériennes non isolées sur le tronçon de la ligne moyenne tension 15 kV existante en nouvelles lignes non isolées. Les tâches d’investissement proposées augmenteront la possibilité de connecter de nouvelles unités de production d’électricité à partir des SER et des micro-installations au réseau de manière à garantir la sécurité de l’exploitation des réseaux électriques OSD. La longueur du réseau nouvellement construit 21,205 km. La longueur du réseau modernisé 2,475 km. (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0001/18
    0 references