“Construction of an early warning system against catastrophic phenomena in Płock County” (Q109200): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: contained in NUTS (P1845): Płocki (Q2577167), Removing duplicate contained in NUTS)
(‎Removed claim: contained in NUTS (P1845): Płocki (Q2577167), Removing duplicate contained in NUTS)
Property / contained in NUTS
 
Property / contained in NUTS: Płocki / rank
Normal rank
 

Revision as of 12:52, 3 December 2021

Project Q109200 in Poland
Language Label Description Also known as
English
“Construction of an early warning system against catastrophic phenomena in Płock County”
Project Q109200 in Poland

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    326,205.9 zloty
    0 references
    78,289.42 Euro
    13 January 2020
    0 references
    445,149.98 zloty
    0 references
    106,836.0 Euro
    13 January 2020
    0 references
    73.28 percent
    0 references
    1 August 2016
    0 references
    30 June 2018
    0 references
    POWIAT PŁOCKI
    0 references
    0 references

    52°30'5.4"N, 20°1'46.2"E
    0 references

    52°32'34.1"N, 20°6'58.3"E
    0 references

    52°27'30.2"N, 20°6'11.2"E
    0 references

    52°34'48.7"N, 19°28'28.2"E
    0 references

    52°29'58.9"N, 19°50'39.8"E
    0 references

    52°36'40.0"N, 19°39'1.1"E
    0 references

    52°37'58.4"N, 19°59'11.8"E
    0 references

    52°23'18.2"N, 20°11'28.7"E
    0 references
    Projekt pn. "Budowa systemu wczesnego ostrzegania przed zjawiskami katastrofalnymi na terenie powiatu płockiego" ma na celu budowę systemu z przeznaczeniem do ostrzegania i alarmowanie mieszkańców powiatu o zagrożeniach związanych z niebezpieczeństwem powodziowym, chemicznym, związanym z eksploatacją składowisk, transportem materiałów niebezpiecznych, zagrożeniam radiacyjnym oraz zniszczeniami powstałym na skutek niekorzystnych zjawisk atmosferycznych. Budowa zintegrowanego systemu ostrzegania i alarmowania ludności o zagrożeniach na terenie powiatu płockiego, zakłada wybudowanie 19 punktów alarmowych (PA) w wyznaczonych miejscach oraz zainstalowanie 8 pulpitów sterujących przeznaczonych do montażu w gminach. Do budowanego systemu zostaną włączone istniejące już w dwóch gminach powiatu urządzenia alarmowe. Docelowo system powiatowy zostanie połączony z centralą wojewódzką. Cel główny projektu realizowany będzie poprzez uruchomienie punktów alarmowych (PA) w wyznaczonych miejscach na terenie powiatu płockiego, zainstalowanie aplikacji oraz urządzeń sterowania w ramach istniejącego zintegrowanego Systemu Powiadamiania i Alarmowania Ludności. Dodatkowo realizację głównych założeń wzmocnią działania edukacyjne w formie przekazywania wiedzy o zagrożeniach, sygnałach alarmowych i komunikatach ostrzegawczych mieszkańcom powiatu płockiego. Działania prewencyjnych w formie: spotkań z mieszkańcami w gminie, publikacji materiałów projektowych na stronie internetowej, rozpowszechniania wydawnictw , emisji artykułów w prasie i radio, stosowania narzędzi informacyjno-edukacyjnych to kolejne kroki , które przysłużą się osiągnięciu celu głównego. Realizacja projektu zapewni wyższy poziom bezpieczeństwa ludności realnie narażonej na ryzyko wymienionych powyższej zagrożeń oraz przyczyni się do zminimalizowania skutków zjawisk katastrofalnych na terenie powiatu płockiego. (Polish)
    0 references
    Project Mon. “The construction of an early warning system against catastrophic phenomena in Płock County” aims to build a system designed to alert and alert the inhabitants of the county about the dangers of flooding, chemical hazards associated with the operation of landfills, transport of dangerous goods, radiation hazards and damage caused by adverse weather phenomena. The construction of an integrated system for alerting and alerting the population about threats in Płock county, involves the construction of 19 alarm points (PA) in designated locations and the installation of 8 control panels intended for installation in municipalities. Alarm devices already existing in two municipalities of the district will be included into the system under construction. Ultimately, the county system will be connected to the voivodship headquarters. The main objective of the project will be implemented by launching alarm points (PA) in designated locations in Płock county, installing applications and control devices within the existing integrated information and alerting system. In addition, the implementation of the main objectives will strengthen educational activities in the form of transfer of knowledge about threats, alarm signals and warning messages to residents of Płock County. Preventive action in the form of: meetings with residents in the commune, publication of project materials on the website, distribution of publications, issue of articles in the press and radio, the use of information and educational tools are the next steps that will serve the main objective. The implementation of the project will ensure a higher level of safety for the population actually exposed to the risks mentioned above and will help to minimise the effects of catastrophic phenomena in the Płock district. (English)
    20 October 2020
    0 references
    Projet intitulé «Construction d’un système d’alerte rapide contre les perturbations naturelles dans le district de Płockie» vise à mettre en place un système d’alerte et d’alerte des résidents du district sur les dangers des inondations, des produits chimiques, des sites de stockage, du transport de matières dangereuses, des dangers radiologiques et des dommages causés par des phénomènes météorologiques défavorables. La construction d’un système intégré d’alerte et d’alerte de la population contre les menaces dans le district de Płock implique la construction de 19 points d’alarme (PA) dans des endroits désignés et l’installation de 8 panneaux de contrôle destinés à être installés dans les municipalités. Des dispositifs d’alarme qui existent déjà dans deux municipalités du district seront intégrés au système en cours de construction. En fin de compte, le réseau de district sera relié à l’administration centrale provinciale. L’objectif principal du projet sera atteint en lançant des points d’alarme (PA) dans des endroits désignés dans le district de Płock, en installant des applications et des dispositifs de contrôle dans le système intégré existant de notification et d’alerte en matière de population. En outre, la mise en œuvre des principaux objectifs sera renforcée par des activités éducatives sous forme de transmission de connaissances sur les menaces, les signaux d’alarme et les messages d’avertissement aux résidents du district de Płocki. Actions préventives sous forme de: des réunions avec les habitants de la municipalité, la publication de matériel de projet sur le site Web, la diffusion de publications, la diffusion d’articles dans la presse et la radio, l’utilisation d’informations et d’outils éducatifs sont les prochaines étapes pour atteindre l’objectif principal. La mise en œuvre du projet garantira un niveau de sécurité plus élevé pour la population effectivement exposée aux risques susmentionnés et contribuera à réduire au minimum les effets des perturbations naturelles dans le district de Płocki. (French)
    1 December 2021
    0 references

    Identifiers

    RPMA.05.01.00-14-4020/15
    0 references