Hermanowice Strachocin gas pipeline (Q86102): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: contained in NUTS (P1845): Krośnieński (Q2577161), Removing duplicate contained in NUTS) |
(Removed claim: contained in NUTS (P1845): Krośnieński (Q2577161), Removing duplicate contained in NUTS) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Krośnieński / rank | |||
Revision as of 10:16, 3 December 2021
Project Q86102 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Hermanowice Strachocin gas pipeline |
Project Q86102 in Poland |
Statements
146,210,751.0 zloty
0 references
267,581,181.84 zloty
0 references
54.64 percent
0 references
1 January 2014
0 references
31 December 2020
0 references
OPERATOR GAZOCIĄGÓW PRZESYŁOWYCH GAZ-SYSTEM S.A.
0 references
Przedmiotem Projektu jest budowa gazociągu Hermanowice-Strachocina. Projekt jest zlokalizowany na terenie gmin Sanok, Tyrawa Wołoska, Dydnia, Bircza, Fredropol, Przemyśl, Ustrzyki Dolne należących do województwa podkarpackiego. W ramach Projektu przewiduje się realizację następujących przedsięwzięć: budowa gazociągu Hermanowice - Strachocina o następujących parametrach: średnica nominalna: 700 mm, ciśnienie robocze:8,4 MPa, długość gazociągu: L= 71,7 km, a także: pięciu zespołów zaporowo – upustowych, układu przyłączeniowego do węzła Hermanowice, układu regulacyjnego/redukcyjnego i pomiarowego na terenie węzła Hermanowice, śluzy nadawczo – odbiorczej tłoka na terenie węzła Hermanowice, układów, systemu ochrony katodowej, w tym stacji ochrony katodowej oraz układów zasilania (AKPiA) elektroenergetycznego wraz z przyłączami. (Polish)
0 references
The subject of the project is the construction of the Hermanowice-Strachocina gas pipeline. The project is located in the communes of Sanok, Tyrawa Wołoska, Dydnia, Bircza, Fredropol, Przemyśl, Ustrzyki Dolne belonging to Podkarpackie Voivodeship. The project envisages the implementation of the following projects: construction of the Hermanowice – Strachocina pipeline with the following parameters: nominal diameter: 700 mm, working pressure: 8,4 MPa, pipeline length: L= 71,7 km as well as: five draw-off systems, connection system to Hermanowice node, regulation/reduction and measurement system in the area of Hermanowice node, transmission and reception locks in the Hermanowice node, systems, cathode protection system, cathode protection station and power supply systems (AKPiA) with connections. (English)
14 October 2020
0 references
Le projet concerne la construction du gazoduc Hermanowice-Strachocina. Le projet est situé dans les municipalités de Sanok, Tyrawa Wołoska, Dydnia, Bircza, Fredropol, Przemyśl, Ustrzyki Dolne appartenant à la voïvodie de Podkarpackie. Le projet prévoit la mise en œuvre des projets suivants: construction du gazoduc Hermanowice — Strachocina avec les paramètres suivants: diamètre nominal: 700 mm, pression robocze:8,4 MPa, longueur du pipeline: L= 71,7 km, ainsi que: cinq barrages et évents, un système de raccordement au nœud Hermanowice, un système de commande/réduction et de mesure dans le nœud Hermanowice, un émetteur-récepteur à piston au nœud Hermanowice, des systèmes, un système de protection contre les cathodes, y compris une station de protection contre les cathodes et des systèmes d’alimentation électrique (AKPiA) avec connexions électriques. (French)
30 November 2021
0 references
Identifiers
POIS.07.01.00-00-0002/16
0 references