Energy efficiency at CENTRAL BOLKAN RSYKING EOOD (Q3834263): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
||||||||||
Property / coordinate location | |||||||||||
42°53'27.85"N, 24°42'44.46"E
| |||||||||||
Property / coordinate location: 42°53'27.85"N, 24°42'44.46"E / rank | |||||||||||
Normal rank |
Revision as of 10:06, 3 December 2021
Project Q3834263 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy efficiency at CENTRAL BOLKAN RSYKING EOOD |
Project Q3834263 in Bulgaria |
Statements
240,426.75 Bulgarian lev
0 references
394,950.0 Bulgarian lev
0 references
0.61 percent
0 references
9 August 2017
0 references
18 April 2019
0 references
“ЦЕНТРАЛ БОЛКАН РИСАЙКЛИНГ“ ЕООД е частна компания с основен предмет на дейност рециклиране на всички видове отпадъчни кабели (медни, алуминиеви и композитни). Проектът предвижда закупуване на съвременно оборудване, което се характеризира със значително по-ниско енергийно потребление за единица продукция и по-голяма производителност в сравнение със съществуващото в момента. По този начин, реализацията на проекта пряко ще допринесе за постигане на висока енергийна ефективност от дружеството, нейното устойчиво възходящо развитие и повишена конкурентоспособност. Също така, ще доведе до значително понижение на енергопотреблението и намаляване на оперативните експлоатационни разходи на производствената база.Прилагането на енергоспестяващи производствени технологии ще допринесе и за устойчиво екологично развитие и намаляване на негативното въздействие върху околната среда.Тъй като рециклирането се извършва с неефективна инсталация, потребяваща значителна електроенергия, стратегическа цел на настоящия проект е постигане на оптимално енергийно потребление чрез изпълнение на следните дейности:1. Извършване на енергийно обследване;2. Оптимизиране енергийното потребление на цялото производство чрез внедряване и сертифициране по БДС EN ISO 50 001 за енергиен мениджмънт;3. Модернизация на производствените мощности за повишаване производствения капацитет и намаляване на производствените разходи чрез внедряване на високо-технологично и енергоефективно оборудване за производство за рециклиране на кабели, чрез закупуване на ново оборудване.Всички дейности по този проект ще доведат до намаляване на потреблението на електроенергия за произвеждането на единица продукция, както и на вредните емисии на СО2. Реализацията на дейностите по проекта ще повишат конкурентоспособността и ефективността на производството и ще направят възможно разширяването на производствения капацитет на фирмата, без да се променя из основи базисния производствен процес. (Bulgarian)
0 references
“Central BOLKAN RSYKING” Ltd. is a private company with main activity recycling of all types of waste cables (copper, aluminum and composite). The project envisages the purchase of modern equipment characterised by significantly lower energy consumption per unit of output and higher productivity than currently existing. Thus, the implementation of the project will directly contribute to achieving high energy efficiency by the company, its sustainable upward development and increased competitiveness. It will also lead to a significant reduction in energy consumption and a reduction in the operating costs of the production base. The application of energy-saving production technologies will also contribute to sustainable environmental development and reduce the negative impact on the environment. Since recycling is carried out with an inefficient installation consuming significant electricity, a strategic goal of this project is to achieve optimal energy consumption through the implementation of the following activities:1. Carrying out an energy audit;2. Optimisation of the energy consumption of all production through implementation and certification according to BDS EN ISO 50 001 for energy management;3. Modernisation of production capacity to increase production capacity and reduce production costs by introducing high-tech and energy efficient equipment for cable recycling, by purchasing new equipment.All activities under this project will lead to a reduction in the electricity consumption for the production of a unit of production, as well as the harmful CO2 emissions. The realisation of the project activities will increase the competitiveness and efficiency of the production and will make it possible to expand the production capacity of the company without fundamentally changing the basic production process. (English)
2 December 2021
0 references
«Central Bolkan RSYKING» Ltd. est une entreprise privée dont l’activité principale consiste à recycler tous les types de câbles de déchets (cuivre, aluminium et composite). Le projet prévoit l’achat d’équipements modernes caractérisés par une consommation d’énergie par unité de production nettement inférieure et une productivité supérieure à celle qui existe actuellement. Ainsi, la mise en œuvre du projet contribuera directement à la réalisation d’une efficacité énergétique élevée par l’entreprise, son développement durable vers le haut et son renforcement de la compétitivité. Elle entraînera également une réduction significative de la consommation d’énergie et des coûts d’exploitation de la base de production. L’application de technologies de production économes en énergie contribuera également au développement durable de l’environnement et à réduire l’impact négatif sur l’environnement. Étant donné que le recyclage est effectué avec une installation inefficace consommant beaucoup d’électricité, l’un des objectifs stratégiques de ce projet est d’atteindre une consommation d’énergie optimale grâce à la mise en œuvre des activités suivantes:1. Réalisation d’un audit énergétique;2. Optimisation de la consommation d’énergie de toute production par la mise en œuvre et la certification selon BDS EN ISO 50 001 pour la gestion de l’énergie;3. Modernisation de la capacité de production pour augmenter la capacité de production et réduire les coûts de production par l’introduction d’équipements de haute technologie et économes en énergie pour le recyclage des câbles, par l’achat de nouveaux équipements.Toutes les activités menées dans le cadre de ce projet entraîneront une réduction de la consommation d’électricité pour la production d’une unité de production, ainsi que des émissions de CO2 nocives. La réalisation des activités du projet augmentera la compétitivité et l’efficacité de la production et permettra d’élargir la capacité de production de l’entreprise sans modifier fondamentalement le processus de production de base. (French)
3 December 2021
0 references
Троян
0 references
Identifiers
BG16RFOP002-3.001-0938
0 references