“Reconstruction and rehabilitation of street network, sidewalks, facilities and accessories to them in Smyadovo, Municipality of Smyadovo” (Q3887692): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en, and other parts: Adding en translations) |
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
||||||||||
Property / coordinate location | |||||||||||
43°3'58.46"N, 27°1'13.48"E
| |||||||||||
Property / coordinate location: 43°3'58.46"N, 27°1'13.48"E / rank | |||||||||||
Normal rank |
Revision as of 17:01, 3 December 2021
Project Q3887692 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | “Reconstruction and rehabilitation of street network, sidewalks, facilities and accessories to them in Smyadovo, Municipality of Smyadovo” |
Project Q3887692 in Bulgaria |
Statements
987,559.35 Bulgarian lev
0 references
1,161,834.53 Bulgarian lev
0 references
0.85 percent
0 references
30 May 2019
0 references
30 May 2022
0 references
Q3887673 (Deleted Item)
0 references
Проектното предложение, на община Смядово, за реконструкция и рехабилитация на уличната настилка, тротоари, съоръженията и принадлежностите към тях, ще се осъществява на територия та на общинския център - гр. Смядово. Обща дължина на уличната мрежа, която ще бъде рехабилитирана, чрез проекта е 2 195 м. или, за всяка от улиците, включени в проекта, метража рехабилитирана / реконструирана част ще бъде, както следва:ул. "Априлско въстание" - 509 м.;ул. "Райна Княгиня" - 367 м.;ул. "Захари Величков" - 871 м.;ул. "Иван Вазов" - 448 м. (Bulgarian)
0 references
The project proposal of the Municipality of Smyadovo for reconstruction and rehabilitation of the pavement, pavements, facilities and accessories to them will be carried out on the territory of the municipal center — Smyadovo. The total length of the street network, which will be rehabilitated, through the project is 2 195 m. or, for each of the streets included in the project, the meter rehabilitated/reconstructed part will be as follows: 509 m. April Uprising Str., 367 m., Zahari Velichkov Str., 871 m., Ivan Vazov Str. — 448 m. (English)
2 December 2021
0 references
Смядово
0 references
Identifiers
BG06RDNP001-7.001-0023
0 references