Reconstruction of station complexes Stara Zagora and Nova Zagora (Q3856401): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Created claim: summary (P836): As a result of the long-standing operation, the reception buildings of the railway stations in Bulgaria are in very poor condition. This requires their modernisation, refurbishment and repair, including their installation systems. The appearance of the reception facilities at the stations is of great importance for the image of rail transport. They are in many cases the face of the railroad. It is no accident in Europe that large railway station...)
Property / summary
 
As a result of the long-standing operation, the reception buildings of the railway stations in Bulgaria are in very poor condition. This requires their modernisation, refurbishment and repair, including their installation systems. The appearance of the reception facilities at the stations is of great importance for the image of rail transport. They are in many cases the face of the railroad. It is no accident in Europe that large railway stations have been turned into shopping centers with shops, restaurants and car parks. Therefore, for the renovation and reconstruction of the old and for the construction of new stations it is necessary to develop different concepts tailored to the location of each of them. Of particular importance is the organisation of the service in the stations in order to create the necessary amenities and comfort for the passengers. The project provides for a complete reconstruction of the reception facilities (for Nova Zagora a new reception building), in accordance with the high requirements of the European standards in the field, which will guarantee the safety of passengers and the quality of service provision, a comfortable working environment for the employees, as well as the alignment of the surrounding space in accordance with the requirements for accessibility of disabled and disadvantaged people. Measures will be implemented to increase the energy efficiency of public spaces, introduction of intelligent, modern systems for management of heating, air conditioning, lighting, information, etc. Renovation and structural reinforcement of individual elements of the supporting structures, replacement of roof structures, partial functional refurbishment of the premises, replacement of electrical installations, water supply and sewerage systems, parking and public works of the surrounding area, etc. The project and its management is planned to be implemented in from 01.02.2016 to 19.04.2022-75 months.Detailed information is set out in point B.3.1 of the FC and Annex 1 to the FC. (English)
Property / summary: As a result of the long-standing operation, the reception buildings of the railway stations in Bulgaria are in very poor condition. This requires their modernisation, refurbishment and repair, including their installation systems. The appearance of the reception facilities at the stations is of great importance for the image of rail transport. They are in many cases the face of the railroad. It is no accident in Europe that large railway stations have been turned into shopping centers with shops, restaurants and car parks. Therefore, for the renovation and reconstruction of the old and for the construction of new stations it is necessary to develop different concepts tailored to the location of each of them. Of particular importance is the organisation of the service in the stations in order to create the necessary amenities and comfort for the passengers. The project provides for a complete reconstruction of the reception facilities (for Nova Zagora a new reception building), in accordance with the high requirements of the European standards in the field, which will guarantee the safety of passengers and the quality of service provision, a comfortable working environment for the employees, as well as the alignment of the surrounding space in accordance with the requirements for accessibility of disabled and disadvantaged people. Measures will be implemented to increase the energy efficiency of public spaces, introduction of intelligent, modern systems for management of heating, air conditioning, lighting, information, etc. Renovation and structural reinforcement of individual elements of the supporting structures, replacement of roof structures, partial functional refurbishment of the premises, replacement of electrical installations, water supply and sewerage systems, parking and public works of the surrounding area, etc. The project and its management is planned to be implemented in from 01.02.2016 to 19.04.2022-75 months.Detailed information is set out in point B.3.1 of the FC and Annex 1 to the FC. (English) / rank
 
Normal rank
Property / summary: As a result of the long-standing operation, the reception buildings of the railway stations in Bulgaria are in very poor condition. This requires their modernisation, refurbishment and repair, including their installation systems. The appearance of the reception facilities at the stations is of great importance for the image of rail transport. They are in many cases the face of the railroad. It is no accident in Europe that large railway stations have been turned into shopping centers with shops, restaurants and car parks. Therefore, for the renovation and reconstruction of the old and for the construction of new stations it is necessary to develop different concepts tailored to the location of each of them. Of particular importance is the organisation of the service in the stations in order to create the necessary amenities and comfort for the passengers. The project provides for a complete reconstruction of the reception facilities (for Nova Zagora a new reception building), in accordance with the high requirements of the European standards in the field, which will guarantee the safety of passengers and the quality of service provision, a comfortable working environment for the employees, as well as the alignment of the surrounding space in accordance with the requirements for accessibility of disabled and disadvantaged people. Measures will be implemented to increase the energy efficiency of public spaces, introduction of intelligent, modern systems for management of heating, air conditioning, lighting, information, etc. Renovation and structural reinforcement of individual elements of the supporting structures, replacement of roof structures, partial functional refurbishment of the premises, replacement of electrical installations, water supply and sewerage systems, parking and public works of the surrounding area, etc. The project and its management is planned to be implemented in from 01.02.2016 to 19.04.2022-75 months.Detailed information is set out in point B.3.1 of the FC and Annex 1 to the FC. (English) / qualifier
 
point in time: 2 December 2021
Timestamp+2021-12-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:50, 2 December 2021

Project Q3856401 in Bulgaria
Language Label Description Also known as
English
Reconstruction of station complexes Stara Zagora and Nova Zagora
Project Q3856401 in Bulgaria

    Statements

    0 references
    14,041,437.86 Bulgarian lev
    0 references
    7,161,133.31 Euro
    1 December 2021
    0 references
    16,519,338.66 Bulgarian lev
    0 references
    8,424,862.72 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    1 February 2016
    0 references
    19 October 2022
    0 references
    Q3856400 (Deleted Item)
    0 references
    В резултат от дългогодишната експлоатация приемните сгради на жп гарите в България са в много лошо състояние. Това налага тяхната модернизация, преустройство и ремонт, включително и на инсталационните системи в тях. Външният вид на приемните здания на гарите е от голямо значение за имиджа на железопътния транспорт. Те в много случаи са лицето на железницата. Не случайно в Европа, големите железопътни гари са превърнати в търговски центрове с магазини, ресторанти и паркинги. Ето защо, за обновяването и реконструкцията на старите и за строителството на нови гари е необходимо разработването на различни концепции, съобразени с местоположението на всяка една от тях. От особена важност е организацията на обслужването в гарите, за да бъдат създадени необходимите удобства и комфорт за пътницитe.Проектът предвижда цялостна реконструкция на приемните здания (за Нова Загора ново приемно здание), в съответствие с високите изисквания на Европейските стандарти в областта, което да гарантира сигурността на пътниците и качеството на предлагане на услугите, комфортна работна среда за служителите, както и привеждане на околното пространство съгласно изискванията за достъпност на хора с увреждания и хора в неравностойно положение. Ще се изпълнят мерки за повишаване енергийната ефективност на обществените пространства, въвеждане на интелигентни, модерни системи за управление на системи за отопление, климатизация, осветление, информация и др. Ще се извърши саниране и конструктивно усилване на отделни елементи от носещите конструкции, подмяна на покривните конструкции, частично функционално преустройство на помещенията, подмяна на електроинсталациите, водоснабдителните и канализационните системи, ще се извърши паркоустройство и благоустройство на околното пространство и т.н.Проектът и управлението му е предвидено да се осъществи в периода 01.02.2016 г. до 19.04.2022 г. - 75 месеца.Подробна информация е посочена в т. Б.3.1 на ФК и Приложение № 1 към ФК. (Bulgarian)
    0 references
    As a result of the long-standing operation, the reception buildings of the railway stations in Bulgaria are in very poor condition. This requires their modernisation, refurbishment and repair, including their installation systems. The appearance of the reception facilities at the stations is of great importance for the image of rail transport. They are in many cases the face of the railroad. It is no accident in Europe that large railway stations have been turned into shopping centers with shops, restaurants and car parks. Therefore, for the renovation and reconstruction of the old and for the construction of new stations it is necessary to develop different concepts tailored to the location of each of them. Of particular importance is the organisation of the service in the stations in order to create the necessary amenities and comfort for the passengers. The project provides for a complete reconstruction of the reception facilities (for Nova Zagora a new reception building), in accordance with the high requirements of the European standards in the field, which will guarantee the safety of passengers and the quality of service provision, a comfortable working environment for the employees, as well as the alignment of the surrounding space in accordance with the requirements for accessibility of disabled and disadvantaged people. Measures will be implemented to increase the energy efficiency of public spaces, introduction of intelligent, modern systems for management of heating, air conditioning, lighting, information, etc. Renovation and structural reinforcement of individual elements of the supporting structures, replacement of roof structures, partial functional refurbishment of the premises, replacement of electrical installations, water supply and sewerage systems, parking and public works of the surrounding area, etc. The project and its management is planned to be implemented in from 01.02.2016 to 19.04.2022-75 months.Detailed information is set out in point B.3.1 of the FC and Annex 1 to the FC. (English)
    2 December 2021
    0 references
    Нова ЗагораСтара Загора
    0 references

    Identifiers

    BG16M1OP001-3.001-0009
    0 references