Reconstruction of square space with bus stops on Ivan Vazov Blvd., P. Bonev Street, D. Malinchev Str., Prof. K. Galabov Str., Tsar Simeon I Str. and Krarechna Street in Perushtitsa (Q3886353): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
label / enlabel / en
 
Reconstruction of square space with bus stops on Ivan Vazov Blvd., P. Bonev Street, D. Malinchev Str., Prof. K. Galabov Str., Tsar Simeon I Str. and Krarechna Street in Perushtitsa
Property / summary
 
The project proposal provides for reconstruction of square space and delivery of 2 stops for the needs of public transport, which are located in front of the bus station and the section from Ivan Vazov Blvd. to the entrance of the central garden. The square is the overlap of the third-class Republican road III-8602 and fourth-class municipal road No 15141. Part of the space is used for parking the vehicle and for the bus station, as it has bus stops to connect with other settlements. The project provides for the construction of new curbs and sidewalks, construction of an island for waiting passengers on the square space, milling of the existing pavement and reasphalisation and street marking. Milling is provided for 0-4 cm and preasphalting 4-6 cm. With asphalt concrete E=1200 MPa. Pavement is provided for 1 ton load.-Trotoar tiles — 5 cm-Cymental sand solution — 3 cm-Unsorted crushed stone — 16 cm. The vertical planning is consistent with the existing flooring, as the first stage provides for the construction of curbs and sidewalks, and in a second stage there is a milling of the existing flooring and reasphalisation of the whole site. Concrete curbs 15/25/50 on concrete base 25/25 concrete grade B 12.5 are provided. Pavement with wheel load for 1 ton.-5 cm concrete slabs-3 cm. Cymentoptic solution-16 cm. Base of unsorted crushed stone E=250Mera-Earth base E=30 m.The curbs in the area of footpaths have been reduced. (English)
Property / summary: The project proposal provides for reconstruction of square space and delivery of 2 stops for the needs of public transport, which are located in front of the bus station and the section from Ivan Vazov Blvd. to the entrance of the central garden. The square is the overlap of the third-class Republican road III-8602 and fourth-class municipal road No 15141. Part of the space is used for parking the vehicle and for the bus station, as it has bus stops to connect with other settlements. The project provides for the construction of new curbs and sidewalks, construction of an island for waiting passengers on the square space, milling of the existing pavement and reasphalisation and street marking. Milling is provided for 0-4 cm and preasphalting 4-6 cm. With asphalt concrete E=1200 MPa. Pavement is provided for 1 ton load.-Trotoar tiles — 5 cm-Cymental sand solution — 3 cm-Unsorted crushed stone — 16 cm. The vertical planning is consistent with the existing flooring, as the first stage provides for the construction of curbs and sidewalks, and in a second stage there is a milling of the existing flooring and reasphalisation of the whole site. Concrete curbs 15/25/50 on concrete base 25/25 concrete grade B 12.5 are provided. Pavement with wheel load for 1 ton.-5 cm concrete slabs-3 cm. Cymentoptic solution-16 cm. Base of unsorted crushed stone E=250Mera-Earth base E=30 m.The curbs in the area of footpaths have been reduced. (English) / rank
 
Normal rank
Property / summary: The project proposal provides for reconstruction of square space and delivery of 2 stops for the needs of public transport, which are located in front of the bus station and the section from Ivan Vazov Blvd. to the entrance of the central garden. The square is the overlap of the third-class Republican road III-8602 and fourth-class municipal road No 15141. Part of the space is used for parking the vehicle and for the bus station, as it has bus stops to connect with other settlements. The project provides for the construction of new curbs and sidewalks, construction of an island for waiting passengers on the square space, milling of the existing pavement and reasphalisation and street marking. Milling is provided for 0-4 cm and preasphalting 4-6 cm. With asphalt concrete E=1200 MPa. Pavement is provided for 1 ton load.-Trotoar tiles — 5 cm-Cymental sand solution — 3 cm-Unsorted crushed stone — 16 cm. The vertical planning is consistent with the existing flooring, as the first stage provides for the construction of curbs and sidewalks, and in a second stage there is a milling of the existing flooring and reasphalisation of the whole site. Concrete curbs 15/25/50 on concrete base 25/25 concrete grade B 12.5 are provided. Pavement with wheel load for 1 ton.-5 cm concrete slabs-3 cm. Cymentoptic solution-16 cm. Base of unsorted crushed stone E=250Mera-Earth base E=30 m.The curbs in the area of footpaths have been reduced. (English) / qualifier
 
point in time: 2 December 2021
Timestamp+2021-12-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:38, 2 December 2021

Project Q3886353 in Bulgaria
Language Label Description Also known as
English
Reconstruction of square space with bus stops on Ivan Vazov Blvd., P. Bonev Street, D. Malinchev Str., Prof. K. Galabov Str., Tsar Simeon I Str. and Krarechna Street in Perushtitsa
Project Q3886353 in Bulgaria

    Statements

    0 references
    55,174.09 Bulgarian lev
    0 references
    28,138.79 Euro
    1 December 2021
    0 references
    61,304.54 Bulgarian lev
    0 references
    31,265.32 Euro
    1 December 2021
    0 references
    0.9 percent
    0 references
    10 February 2021
    0 references
    10 February 2023
    0 references
    Q3886347 (Deleted Item)
    0 references
    Проектното предложение предвижда реконструкция на площадно пространство и доставка на 2 броя спирки за нуждите на градски транспорт, които се намират пред автогарата и участъка от бул. „Иван Вазов“ до входа на централната градина. Площадното пространство представлява точка на застъпване на третокласен републикански път III-8602 и четвъртокласен общински път № 15141. Част от пространството служи за паркиране на МПС и за автогара, тъй като на него са разположени автобусни спирки за връзка с другите населени места. Проекта предвижда направа на нови бордюри и тротоари, изграждане на остров за чакащите пътници върху площадното пространство, фрезоване на съществуващата настилка и преасфалтиране и нанасяне на улична маркировка. Фрезоването е предвидено 0-4 см., а преасфалтирането 4-6 см. С асфалтобетон Е=1200 МРа. Тротоарната настилка е предвидена за 1 тон натоварване.-Тротоарни плочки – 5 см-Циментно пясъчен разтвор – 3 см-Несортиран трошен камък – 16 см.Вертикалната планировка е съобразена със съществуващата настилка, като на първи етап е предвидено направа на бордюрите и тротоарите, а на втори етап е предвидено фрезоване на съществуващата настилка и преасфалтиране на целия обект. Предвидени са бетонови бордюри 15/25/50 върху бетонова основа 25/25 бетон клас В 12,5. Тротоарна настилка с колесно натоварване за 1 тон.-5 см бетонови плочи-3 см. Циментопясъчен разтвор-16 см. Основа от несортиран трошен камък Е=250МРа-Земна основа Е=30мраПредвидени са понижение на бордюрите в зоната на пешеходните пътеки. (Bulgarian)
    0 references
    The project proposal provides for reconstruction of square space and delivery of 2 stops for the needs of public transport, which are located in front of the bus station and the section from Ivan Vazov Blvd. to the entrance of the central garden. The square is the overlap of the third-class Republican road III-8602 and fourth-class municipal road No 15141. Part of the space is used for parking the vehicle and for the bus station, as it has bus stops to connect with other settlements. The project provides for the construction of new curbs and sidewalks, construction of an island for waiting passengers on the square space, milling of the existing pavement and reasphalisation and street marking. Milling is provided for 0-4 cm and preasphalting 4-6 cm. With asphalt concrete E=1200 MPa. Pavement is provided for 1 ton load.-Trotoar tiles — 5 cm-Cymental sand solution — 3 cm-Unsorted crushed stone — 16 cm. The vertical planning is consistent with the existing flooring, as the first stage provides for the construction of curbs and sidewalks, and in a second stage there is a milling of the existing flooring and reasphalisation of the whole site. Concrete curbs 15/25/50 on concrete base 25/25 concrete grade B 12.5 are provided. Pavement with wheel load for 1 ton.-5 cm concrete slabs-3 cm. Cymentoptic solution-16 cm. Base of unsorted crushed stone E=250Mera-Earth base E=30 m.The curbs in the area of footpaths have been reduced. (English)
    2 December 2021
    0 references
    Перущица
    0 references

    Identifiers

    BG06RDNP001-19.234-0001
    0 references