Lot 12 “Road II-44 Draganovtsi — Gabrovo from km 14+ 600 to km 23+ 978.36 and from km 25+ 731 to km 28+ 972.75, with a total length of 12.620 km, Gabrovo district” (Q3835735): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The main result that will be achieved from the implementation of all project activities is the existence of a rehabilitated road section of 12.620 km on road II-44. The restoration and improvement of the transport and operational qualities of the existing road surface and the road body will provide conditions of traffic safety and comfort for the travelers of three settlements in the village of Draganovtsi, Yankovtsi and Gabrovo. The improved co...)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Lot 12 «Route II-44 Draganovtsi — Gabrovo du km 14+ 600 au km 23+ 978.36 et du km 25+ 731 au km 28+ 972.75, d’une longueur totale de 12,620 km, district de Gabrovo»
Property / summary
 
Le principal résultat qui sera obtenu par la mise en œuvre de toutes les activités du projet est l’existence d’un tronçon routier réhabilité de 12,620 km sur la route II-44. La restauration et l’amélioration du transport et des qualités opérationnelles de la surface de la route existante et le corps de la route fournira des conditions de sécurité et de confort de la circulation pour les voyageurs de trois colonies dans le village de Draganovtsi, Yankovtsi et Gabrovo. L’amélioration des conditions de franchissement du tronçon routier aura un impact bénéfique sur les groupes cibles de ce projet et sur les bénéficiaires finaux — la population du district de Gabrovo. La mise en œuvre des activités envisagées dans le cadre de ce projet contribuera à améliorer la qualité de vie et l’environnement de travail, ainsi qu’à offrir de nouvelles possibilités d’accroître la capacité concurrentielle de la région. Le tronçon routier réhabilité améliore l’accessibilité du réseau RTE-T au fret et aux passagers dans la région, ce qui permet également d’atteindre l’objectif du régime actuel de subventions. Les principales activités prévues pour la mise en œuvre réussie du projet sont les suivantes: Équipe de gestion de projet; Travaux de construction; La supervision de la construction pendant la construction du site; La supervision du projet par l’auteur; Audit du projet; Des mesures d’information et de publicité pour le projet; La mise en service du site, la vérification des coûts et la communication des résultats obtenus; (French)
Property / summary: Le principal résultat qui sera obtenu par la mise en œuvre de toutes les activités du projet est l’existence d’un tronçon routier réhabilité de 12,620 km sur la route II-44. La restauration et l’amélioration du transport et des qualités opérationnelles de la surface de la route existante et le corps de la route fournira des conditions de sécurité et de confort de la circulation pour les voyageurs de trois colonies dans le village de Draganovtsi, Yankovtsi et Gabrovo. L’amélioration des conditions de franchissement du tronçon routier aura un impact bénéfique sur les groupes cibles de ce projet et sur les bénéficiaires finaux — la population du district de Gabrovo. La mise en œuvre des activités envisagées dans le cadre de ce projet contribuera à améliorer la qualité de vie et l’environnement de travail, ainsi qu’à offrir de nouvelles possibilités d’accroître la capacité concurrentielle de la région. Le tronçon routier réhabilité améliore l’accessibilité du réseau RTE-T au fret et aux passagers dans la région, ce qui permet également d’atteindre l’objectif du régime actuel de subventions. Les principales activités prévues pour la mise en œuvre réussie du projet sont les suivantes: Équipe de gestion de projet; Travaux de construction; La supervision de la construction pendant la construction du site; La supervision du projet par l’auteur; Audit du projet; Des mesures d’information et de publicité pour le projet; La mise en service du site, la vérification des coûts et la communication des résultats obtenus; (French) / rank
 
Normal rank
Property / summary: Le principal résultat qui sera obtenu par la mise en œuvre de toutes les activités du projet est l’existence d’un tronçon routier réhabilité de 12,620 km sur la route II-44. La restauration et l’amélioration du transport et des qualités opérationnelles de la surface de la route existante et le corps de la route fournira des conditions de sécurité et de confort de la circulation pour les voyageurs de trois colonies dans le village de Draganovtsi, Yankovtsi et Gabrovo. L’amélioration des conditions de franchissement du tronçon routier aura un impact bénéfique sur les groupes cibles de ce projet et sur les bénéficiaires finaux — la population du district de Gabrovo. La mise en œuvre des activités envisagées dans le cadre de ce projet contribuera à améliorer la qualité de vie et l’environnement de travail, ainsi qu’à offrir de nouvelles possibilités d’accroître la capacité concurrentielle de la région. Le tronçon routier réhabilité améliore l’accessibilité du réseau RTE-T au fret et aux passagers dans la région, ce qui permet également d’atteindre l’objectif du régime actuel de subventions. Les principales activités prévues pour la mise en œuvre réussie du projet sont les suivantes: Équipe de gestion de projet; Travaux de construction; La supervision de la construction pendant la construction du site; La supervision du projet par l’auteur; Audit du projet; Des mesures d’information et de publicité pour le projet; La mise en service du site, la vérification des coûts et la communication des résultats obtenus; (French) / qualifier
 
point in time: 3 December 2021
Timestamp+2021-12-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:31, 3 December 2021

Project Q3835735 in Bulgaria
Language Label Description Also known as
English
Lot 12 “Road II-44 Draganovtsi — Gabrovo from km 14+ 600 to km 23+ 978.36 and from km 25+ 731 to km 28+ 972.75, with a total length of 12.620 km, Gabrovo district”
Project Q3835735 in Bulgaria

    Statements

    0 references
    9,356,896.17 Bulgarian lev
    0 references
    4,772,017.05 Euro
    1 December 2021
    0 references
    11,008,113.15 Bulgarian lev
    0 references
    5,614,137.71 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    9 May 2016
    0 references
    14 July 2020
    0 references
    0 references
    Основният резултат, който ще бъде постигнат от изпълнението на всички дейности по проекта е наличието на рехабилитиран пътен участък от 12.620 км на път II–44. С възстановяването и подобряването на транспортно-експлоатационните качества на съществуващата пътна настилка и пътното тяло ще се осигурят условия на безопасност на движението и комфорт на пътуващите на жителите на три населени места с. Драгановци, с. Янковци и гр. Габрово. Подобрените условия за преминаване по пътния участък ще окажат благоприятно въздействие върху целевите групи по настоящия проект и крайните бенефициенти – населението на област Габрово. Осъществяването на дейностите предвидени по настоящия проект ще допринесе за подобряване на качеството на живот и работна среда, както и осигуряването на нови възможности за повишаване конкурентно способността в региона. Рехабилитираният пътен участък подобрява достъпността до TEN-T мрежата на товари и пътници в рамките на региона, с което се постига и целта на настоящата схема за предоставяне на безвъзмездна помощ. Основните дейности, които са заложени за успешната реализацията по проекта са: Екип за управление на проекта; Строително монтажни работи; Строителен надзор по време на строителството на обекта; Авторски надзор на проекта; Одит на проекта; Мерки за информация и публичност на проекта; Въвеждане на обекта в експлоатация, верификация на разходите и отчитане на постигнатите резултати; (Bulgarian)
    0 references
    The main result that will be achieved from the implementation of all project activities is the existence of a rehabilitated road section of 12.620 km on road II-44. The restoration and improvement of the transport and operational qualities of the existing road surface and the road body will provide conditions of traffic safety and comfort for the travelers of three settlements in the village of Draganovtsi, Yankovtsi and Gabrovo. The improved conditions for crossing the road section will have a beneficial impact on the target groups of this project and the final beneficiaries — the population of Gabrovo district. The implementation of the activities envisaged under this project will contribute to improving the quality of life and working environment, as well as providing new opportunities to increase the competitive capacity in the region. The rehabilitated road section improves the accessibility of the TEN-T network to freight and passengers within the region, which also achieves the objective of the current grant scheme. The main activities set for the successful implementation of the project are: Project management team; Construction works; Construction supervision during the construction of the site; Author’s supervision of the project; Project audit; Information and publicity measures for the project; Putting the site into operation, verification of costs and reporting of the results achieved; (English)
    2 December 2021
    0 references
    Le principal résultat qui sera obtenu par la mise en œuvre de toutes les activités du projet est l’existence d’un tronçon routier réhabilité de 12,620 km sur la route II-44. La restauration et l’amélioration du transport et des qualités opérationnelles de la surface de la route existante et le corps de la route fournira des conditions de sécurité et de confort de la circulation pour les voyageurs de trois colonies dans le village de Draganovtsi, Yankovtsi et Gabrovo. L’amélioration des conditions de franchissement du tronçon routier aura un impact bénéfique sur les groupes cibles de ce projet et sur les bénéficiaires finaux — la population du district de Gabrovo. La mise en œuvre des activités envisagées dans le cadre de ce projet contribuera à améliorer la qualité de vie et l’environnement de travail, ainsi qu’à offrir de nouvelles possibilités d’accroître la capacité concurrentielle de la région. Le tronçon routier réhabilité améliore l’accessibilité du réseau RTE-T au fret et aux passagers dans la région, ce qui permet également d’atteindre l’objectif du régime actuel de subventions. Les principales activités prévues pour la mise en œuvre réussie du projet sont les suivantes: Équipe de gestion de projet; Travaux de construction; La supervision de la construction pendant la construction du site; La supervision du projet par l’auteur; Audit du projet; Des mesures d’information et de publicité pour le projet; La mise en service du site, la vérification des coûts et la communication des résultats obtenus; (French)
    3 December 2021
    0 references
    Габрово
    0 references

    Identifiers

    BG16RFOP001-7.001-0007
    0 references