Improving the energy efficiency of residential buildings in Berkovitsa — stage 2 (Q3884047): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Changed label, description and/or aliases in en, and other parts: Adding en translations) |
||||||||||||||
label / en | label / en | ||||||||||||||
Improving the energy efficiency of residential buildings in Berkovitsa — stage 2 | |||||||||||||||
Property / summary | |||||||||||||||
The present project proposal is aimed at increasing the EE of two residential buildings on the territory of Berkovitsa by implementing energy-saving measures. The buildings are selected after an information campaign. The project proposal provides for the implementation of all mandatory ESM from the energy audit of residential buildings, subject to project intervention and achievement of at least the energy class C of each building. One multi-family residential building has an administrative address in Berkovitsa, Izgrev district, bl. 9, bl. 10 and bl. 11, UPI IV, quarter. 1 according to the plan of Berkovitsa, PI 03928.513.278. The building was put into operation in 1980. The other multi-family residential building has an administrative address in Berkovitsa, Zaraynitza residential district, bl. 21 and bl. 22, UPI I, quarter. 6 according to the plan of Berkovitsa, PI 03928.510.16.15 and PI 03928.510.16.16. The building was put into operation in 1981.The project activities will help to reduce the cost of maintenance of the facilities and the costs of energy consumption and heating, while improving the comfort and energy performance of the buildings. An additional effect of the measures will ensure cost-effective operation, allowing its sustainable management and maintenance over time. This project proposal provides for the implementation of the following EJNs and the achievement of energy class A of the two buildings: Measure B1 — Heat insulation of external walls; Measure B2 — Heat insulation of a roof; Measure HZ — Heat insulation of the floor; Measure B4 — Replacement of joinery; Measure C1 — Optimisation of the lighting system — installation of LED luminaires in common areas; The energy audit found that the thermal losses through the surrounding external elements — walls and roof were large and the building did not meet modern energy efficiency requirements. In the current state, buildings fall into energy consumption class D on a scale of energy consumption. (English) | |||||||||||||||
Property / summary: The present project proposal is aimed at increasing the EE of two residential buildings on the territory of Berkovitsa by implementing energy-saving measures. The buildings are selected after an information campaign. The project proposal provides for the implementation of all mandatory ESM from the energy audit of residential buildings, subject to project intervention and achievement of at least the energy class C of each building. One multi-family residential building has an administrative address in Berkovitsa, Izgrev district, bl. 9, bl. 10 and bl. 11, UPI IV, quarter. 1 according to the plan of Berkovitsa, PI 03928.513.278. The building was put into operation in 1980. The other multi-family residential building has an administrative address in Berkovitsa, Zaraynitza residential district, bl. 21 and bl. 22, UPI I, quarter. 6 according to the plan of Berkovitsa, PI 03928.510.16.15 and PI 03928.510.16.16. The building was put into operation in 1981.The project activities will help to reduce the cost of maintenance of the facilities and the costs of energy consumption and heating, while improving the comfort and energy performance of the buildings. An additional effect of the measures will ensure cost-effective operation, allowing its sustainable management and maintenance over time. This project proposal provides for the implementation of the following EJNs and the achievement of energy class A of the two buildings: Measure B1 — Heat insulation of external walls; Measure B2 — Heat insulation of a roof; Measure HZ — Heat insulation of the floor; Measure B4 — Replacement of joinery; Measure C1 — Optimisation of the lighting system — installation of LED luminaires in common areas; The energy audit found that the thermal losses through the surrounding external elements — walls and roof were large and the building did not meet modern energy efficiency requirements. In the current state, buildings fall into energy consumption class D on a scale of energy consumption. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The present project proposal is aimed at increasing the EE of two residential buildings on the territory of Berkovitsa by implementing energy-saving measures. The buildings are selected after an information campaign. The project proposal provides for the implementation of all mandatory ESM from the energy audit of residential buildings, subject to project intervention and achievement of at least the energy class C of each building. One multi-family residential building has an administrative address in Berkovitsa, Izgrev district, bl. 9, bl. 10 and bl. 11, UPI IV, quarter. 1 according to the plan of Berkovitsa, PI 03928.513.278. The building was put into operation in 1980. The other multi-family residential building has an administrative address in Berkovitsa, Zaraynitza residential district, bl. 21 and bl. 22, UPI I, quarter. 6 according to the plan of Berkovitsa, PI 03928.510.16.15 and PI 03928.510.16.16. The building was put into operation in 1981.The project activities will help to reduce the cost of maintenance of the facilities and the costs of energy consumption and heating, while improving the comfort and energy performance of the buildings. An additional effect of the measures will ensure cost-effective operation, allowing its sustainable management and maintenance over time. This project proposal provides for the implementation of the following EJNs and the achievement of energy class A of the two buildings: Measure B1 — Heat insulation of external walls; Measure B2 — Heat insulation of a roof; Measure HZ — Heat insulation of the floor; Measure B4 — Replacement of joinery; Measure C1 — Optimisation of the lighting system — installation of LED luminaires in common areas; The energy audit found that the thermal losses through the surrounding external elements — walls and roof were large and the building did not meet modern energy efficiency requirements. In the current state, buildings fall into energy consumption class D on a scale of energy consumption. (English) / qualifier | |||||||||||||||
point in time: 2 December 2021
|
Revision as of 22:28, 2 December 2021
Project Q3884047 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the energy efficiency of residential buildings in Berkovitsa — stage 2 |
Project Q3884047 in Bulgaria |
Statements
1,274,497.39 Bulgarian lev
0 references
1,499,408.7 Bulgarian lev
0 references
0.85 percent
0 references
2 September 2020
0 references
2 March 2023
0 references
0 references
Настоящето проектно предложение е насочено към повишаване на ЕЕ на две жилищни сгради на територията на град Берковица, чрез осъществяване на енергоспестяващи мерки.Сградите са избрани след проведена информационна кампания.С проектно предложение се предвижда внедряването на всички задължителни ЕСМ от енергийното обследване на жилищните сгради, обект на интервенция по проекта и постигане на най-малко на енергиен клас С на всяка сграда. Едната многофамилна жилищна сграда е с административен адрес гр. Берковица, ж.к. "Изгрев", бл. 9, бл. 10 и бл. 11, УПИ IV, кв. 1 по плана на гр. Берковица, ПИ 03928.513.278. Сградата е въведена в експлоатация през 1980 г.Другата многофамилна жилищна сграда е с административен адрес гр. Берковица, ж.к. "Заряница", бл. 21 и бл. 22, УПИ I, кв. 6 по плана на гр. Берковица, ПИ 03928.510.16.15 и ПИ 03928.510.16.16. Сградата е въведена в експлоатация през 1981 г.Дейностите по проекта ще спомогнат за намаляване разходите за поддръжката на материалната база и разходи за енергопотребление и отопление, като от друга страна ще се подобри комфорта и енергийните характеристики на сградите. Допълнителен ефект от мерките ще осигури рентабилната експлоатация, което ще позволи устойчивото й управление и поддръжка във времето. С настоящето проектно предложение се предвижда внедряването на следните ЕСМ и постигане на енергиен клас А на двете сгради: Мярка В1 – Топлоизолация на външни стени; Мярка В2 – Топлоизолация на покрив; Мярка ВЗ - Топлоизолация на под; Мярка В4 - Подмяна на дограма; Мярка С1 – Оптимизация на осветителната система – монтаж на светодиодни осветители в общите части; При извършеното енергийно обследване се установи, че топлинните загуби през ограждащите външни елементи – стени и покрив са големи и сградата не отговаря на съвременните изисквания за енергийна ефективност. В настоящето състояние сградите попадат в клас на енергопотребление D от скала на енергопотреблението. (Bulgarian)
0 references
The present project proposal is aimed at increasing the EE of two residential buildings on the territory of Berkovitsa by implementing energy-saving measures. The buildings are selected after an information campaign. The project proposal provides for the implementation of all mandatory ESM from the energy audit of residential buildings, subject to project intervention and achievement of at least the energy class C of each building. One multi-family residential building has an administrative address in Berkovitsa, Izgrev district, bl. 9, bl. 10 and bl. 11, UPI IV, quarter. 1 according to the plan of Berkovitsa, PI 03928.513.278. The building was put into operation in 1980. The other multi-family residential building has an administrative address in Berkovitsa, Zaraynitza residential district, bl. 21 and bl. 22, UPI I, quarter. 6 according to the plan of Berkovitsa, PI 03928.510.16.15 and PI 03928.510.16.16. The building was put into operation in 1981.The project activities will help to reduce the cost of maintenance of the facilities and the costs of energy consumption and heating, while improving the comfort and energy performance of the buildings. An additional effect of the measures will ensure cost-effective operation, allowing its sustainable management and maintenance over time. This project proposal provides for the implementation of the following EJNs and the achievement of energy class A of the two buildings: Measure B1 — Heat insulation of external walls; Measure B2 — Heat insulation of a roof; Measure HZ — Heat insulation of the floor; Measure B4 — Replacement of joinery; Measure C1 — Optimisation of the lighting system — installation of LED luminaires in common areas; The energy audit found that the thermal losses through the surrounding external elements — walls and roof were large and the building did not meet modern energy efficiency requirements. In the current state, buildings fall into energy consumption class D on a scale of energy consumption. (English)
2 December 2021
0 references
Берковица
0 references
Identifiers
BG16RFOP001-2.003-0038
0 references