Refrigeration base for storage and cutting of dairy products and modernisation of an existing establishment (Q3832580): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Created claim: summary (P836): The investment is aimed at expanding and modernising the production activity. For this purpose, a Refrigerated storage facility for dairy products and modernisation of an existing establishment will be built. It is envisaged to build a Refrigerated storage facility for dairy products with a dairy cutting plant consisting of the following sub-sites:- Air-conditioned building for storage and cutting of dairy products with a total area of 1565 sq....)
Property / summary
 
The investment is aimed at expanding and modernising the production activity. For this purpose, a Refrigerated storage facility for dairy products and modernisation of an existing establishment will be built. It is envisaged to build a Refrigerated storage facility for dairy products with a dairy cutting plant consisting of the following sub-sites:- Air-conditioned building for storage and cutting of dairy products with a total area of 1565 sq. m.; photovoltaic installation for own needs — 30 kWp;- Openwork fence with a length of 73.03 l.m.;- Vertical Planning with area networks of 1172.07 sq. m.;- Landscaping and Landscape with total area of 392.20 sq. m. The upcoming base is designed so that it is a large refrigerator, and the areas that are not refrigeration chambers are entirely air-conditioned. The new air-conditioned building is designed on two floors with 10 refrigeration chambers, with the refrigeration equipment provided for them, one of them for deep-freezing, a cutting plant, a carton shop, storage, auxiliary, machinery and household rooms. The building also provides installation with solar panels for the production of hot water for washing dishes and equipment. The connection of the ground floor to the second level is made with two load lifts — sets for technological needs for the transport of raw materials and finished products. There is a machine room next to them, which serves them. The following production equipment for the cutting plant is intended for purchase: two electric stackers, six mobile tables and four mobile, shelves. The investment also aims at technological modernisation of the production facilities in a milk processing plant of Eco-F EAD.The investment includes the purchase of production equipment as follows:- Milk pasteuriser 10 000 l/h- Milk pasteuriser 5 000 l/h- Vertical water reservoir/milk 40 m³- Installation for ice water (English)
Property / summary: The investment is aimed at expanding and modernising the production activity. For this purpose, a Refrigerated storage facility for dairy products and modernisation of an existing establishment will be built. It is envisaged to build a Refrigerated storage facility for dairy products with a dairy cutting plant consisting of the following sub-sites:- Air-conditioned building for storage and cutting of dairy products with a total area of 1565 sq. m.; photovoltaic installation for own needs — 30 kWp;- Openwork fence with a length of 73.03 l.m.;- Vertical Planning with area networks of 1172.07 sq. m.;- Landscaping and Landscape with total area of 392.20 sq. m. The upcoming base is designed so that it is a large refrigerator, and the areas that are not refrigeration chambers are entirely air-conditioned. The new air-conditioned building is designed on two floors with 10 refrigeration chambers, with the refrigeration equipment provided for them, one of them for deep-freezing, a cutting plant, a carton shop, storage, auxiliary, machinery and household rooms. The building also provides installation with solar panels for the production of hot water for washing dishes and equipment. The connection of the ground floor to the second level is made with two load lifts — sets for technological needs for the transport of raw materials and finished products. There is a machine room next to them, which serves them. The following production equipment for the cutting plant is intended for purchase: two electric stackers, six mobile tables and four mobile, shelves. The investment also aims at technological modernisation of the production facilities in a milk processing plant of Eco-F EAD.The investment includes the purchase of production equipment as follows:- Milk pasteuriser 10 000 l/h- Milk pasteuriser 5 000 l/h- Vertical water reservoir/milk 40 m³- Installation for ice water (English) / rank
 
Normal rank
Property / summary: The investment is aimed at expanding and modernising the production activity. For this purpose, a Refrigerated storage facility for dairy products and modernisation of an existing establishment will be built. It is envisaged to build a Refrigerated storage facility for dairy products with a dairy cutting plant consisting of the following sub-sites:- Air-conditioned building for storage and cutting of dairy products with a total area of 1565 sq. m.; photovoltaic installation for own needs — 30 kWp;- Openwork fence with a length of 73.03 l.m.;- Vertical Planning with area networks of 1172.07 sq. m.;- Landscaping and Landscape with total area of 392.20 sq. m. The upcoming base is designed so that it is a large refrigerator, and the areas that are not refrigeration chambers are entirely air-conditioned. The new air-conditioned building is designed on two floors with 10 refrigeration chambers, with the refrigeration equipment provided for them, one of them for deep-freezing, a cutting plant, a carton shop, storage, auxiliary, machinery and household rooms. The building also provides installation with solar panels for the production of hot water for washing dishes and equipment. The connection of the ground floor to the second level is made with two load lifts — sets for technological needs for the transport of raw materials and finished products. There is a machine room next to them, which serves them. The following production equipment for the cutting plant is intended for purchase: two electric stackers, six mobile tables and four mobile, shelves. The investment also aims at technological modernisation of the production facilities in a milk processing plant of Eco-F EAD.The investment includes the purchase of production equipment as follows:- Milk pasteuriser 10 000 l/h- Milk pasteuriser 5 000 l/h- Vertical water reservoir/milk 40 m³- Installation for ice water (English) / qualifier
 
point in time: 2 December 2021
Timestamp+2021-12-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:24, 2 December 2021

Project Q3832580 in Bulgaria
Language Label Description Also known as
English
Refrigeration base for storage and cutting of dairy products and modernisation of an existing establishment
Project Q3832580 in Bulgaria

    Statements

    0 references
    824,179.97 Bulgarian lev
    0 references
    420,331.78 Euro
    1 December 2021
    0 references
    2,197,813.29 Bulgarian lev
    0 references
    1,120,884.78 Euro
    1 December 2021
    0 references
    0.37 percent
    0 references
    14 November 2019
    0 references
    14 November 2022
    0 references
    0 references
    Инвестицията е насочена към разширение и модернизация на производствената дейност. За тази цел ще се изгради Хладилна база за съхранение и разфасовка на млечни продукти и Модернизация на съществуващо предприятие.Предвижда се изграждане на Хладилна база за съхранение на млечни продукти с цех за разфасовка на млечни продукти, състояща се от следните подобекти:- Климатизирана сграда за съхранение и разфасовка на млечни продукти с РЗП 1565 кв. м.;- Фотоволтаична инсталация за собствени нужди – 30 kWp;- Ажурна ограда с дължина 73.03 л.м.;- Вертикална Планировка с площадкови мрежи с РЗП 1172.07 кв. м.;- Озеленяване и Ландшафт с РЗП 392.20 кв. м.Предстоящата за изграждане база е проектирана така, че представлява един голям хладилник, а площите които не са хладилни камери са изцяло климатизирани. Новата климатизирана сграда е проектирана на два етажа, на които ще са разположени 10 хладилни камери, с предвиденото за тях хладилно оборудване, една от които за дълбоко замразяване, цех за разфасоване, цех за кашониране, складови, спомагателни, машинни и битови помещения. На сградата е предвидена и инсталация със слънчеви панели за производство на топла вода за измиване на съдове и оборудване.Връзката на партера с второто ниво се прави с два броя товарни подемника - комплекти за технологични нужди за пренос на суровини и готова продукция. До тях е предвидено машинно помещение, което ги обслужва. Предвидено за закупуване е следното производствено оборудване за цеха за разфасовка: два броя електрически високоповдигачи тип „стакер“, шест мобилни маси и четири мобилни, стелажни колички. Инвестицията има за цел и технологична модернизация на производствените мощности в млекопреработвателно предприятие на „Еко-Ф” ЕАД.Инвестицията включва закупуване на производствено оборудване, както следва:- Пастьоризатор за мляко 10 000л/ч- Пастьоризатор за мляко 5 000л/ч- Вертикален резервоар за вода/мляко 40 м3- Инсталация за ледена вода (Bulgarian)
    0 references
    The investment is aimed at expanding and modernising the production activity. For this purpose, a Refrigerated storage facility for dairy products and modernisation of an existing establishment will be built. It is envisaged to build a Refrigerated storage facility for dairy products with a dairy cutting plant consisting of the following sub-sites:- Air-conditioned building for storage and cutting of dairy products with a total area of 1565 sq. m.; photovoltaic installation for own needs — 30 kWp;- Openwork fence with a length of 73.03 l.m.;- Vertical Planning with area networks of 1172.07 sq. m.;- Landscaping and Landscape with total area of 392.20 sq. m. The upcoming base is designed so that it is a large refrigerator, and the areas that are not refrigeration chambers are entirely air-conditioned. The new air-conditioned building is designed on two floors with 10 refrigeration chambers, with the refrigeration equipment provided for them, one of them for deep-freezing, a cutting plant, a carton shop, storage, auxiliary, machinery and household rooms. The building also provides installation with solar panels for the production of hot water for washing dishes and equipment. The connection of the ground floor to the second level is made with two load lifts — sets for technological needs for the transport of raw materials and finished products. There is a machine room next to them, which serves them. The following production equipment for the cutting plant is intended for purchase: two electric stackers, six mobile tables and four mobile, shelves. The investment also aims at technological modernisation of the production facilities in a milk processing plant of Eco-F EAD.The investment includes the purchase of production equipment as follows:- Milk pasteuriser 10 000 l/h- Milk pasteuriser 5 000 l/h- Vertical water reservoir/milk 40 m³- Installation for ice water (English)
    2 December 2021
    0 references
    с.Карабунар
    0 references

    Identifiers

    BG06RDNP001-4.001-0141
    0 references