Improving the energy efficiency of “Constraction Group” Ltd. (Q3831589): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Created claim: summary (P836): “Constraction Group” Ltd. has its main economic activity: 4120 — construction of residential and non-residential buildings. The company has a machine park that is in good technical condition. Earthworks — excavations, embankments and tamping are available; machines for manual, hydraulic and mechanised breaking of monolithic concrete, flooring and masonry; means of transport; apparatus for welding, etc. The company carries out its activities on...) |
||||||||||||||
Property / summary | |||||||||||||||
“Constraction Group” Ltd. has its main economic activity: 4120 — construction of residential and non-residential buildings. The company has a machine park that is in good technical condition. Earthworks — excavations, embankments and tamping are available; machines for manual, hydraulic and mechanised breaking of monolithic concrete, flooring and masonry; means of transport; apparatus for welding, etc. The company carries out its activities on construction sites throughout Bulgaria. Since 2012 the company has completed many construction projects in northwestern Bulgaria. After a company survey and anticipation of new sites in order to make the activity more effective, Construction Group Ltd. has rented a base with the following address: Pleven District, Bukovluk village, Autopolygon of Traffic Police. In the above-mentioned facility, the mechanisation of the project will be acquired and will be positioned when it is not used on a given site in Bulgaria. Some ongoing maintenance and repairs of the equipment will be carried out at the base. “Construction Group” Ltd. plans to improve its energy efficiency and reduce its costs by purchasing new high-performance and diverse construction machines such as: dumper, excavator, vibration roller, chain excavator with clip to recycle destroyed waste concrete, mini chain excavator, crusher that also serves for recycling construction waste, compressor station with tooling and hydraulic station. The company will use consulting services for the introduction and certification of an energy management system according to standard BDS EN ISO 50001 and Energy Audit Services to prescribe energy efficient measures. Through the project, the company plans to expand its activities, reduce the cost of construction, and thus become more competitive. This is a prerequisite for sustainable development, which will expand the market position of the company in the construction sector. (English) | |||||||||||||||
Property / summary: “Constraction Group” Ltd. has its main economic activity: 4120 — construction of residential and non-residential buildings. The company has a machine park that is in good technical condition. Earthworks — excavations, embankments and tamping are available; machines for manual, hydraulic and mechanised breaking of monolithic concrete, flooring and masonry; means of transport; apparatus for welding, etc. The company carries out its activities on construction sites throughout Bulgaria. Since 2012 the company has completed many construction projects in northwestern Bulgaria. After a company survey and anticipation of new sites in order to make the activity more effective, Construction Group Ltd. has rented a base with the following address: Pleven District, Bukovluk village, Autopolygon of Traffic Police. In the above-mentioned facility, the mechanisation of the project will be acquired and will be positioned when it is not used on a given site in Bulgaria. Some ongoing maintenance and repairs of the equipment will be carried out at the base. “Construction Group” Ltd. plans to improve its energy efficiency and reduce its costs by purchasing new high-performance and diverse construction machines such as: dumper, excavator, vibration roller, chain excavator with clip to recycle destroyed waste concrete, mini chain excavator, crusher that also serves for recycling construction waste, compressor station with tooling and hydraulic station. The company will use consulting services for the introduction and certification of an energy management system according to standard BDS EN ISO 50001 and Energy Audit Services to prescribe energy efficient measures. Through the project, the company plans to expand its activities, reduce the cost of construction, and thus become more competitive. This is a prerequisite for sustainable development, which will expand the market position of the company in the construction sector. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: “Constraction Group” Ltd. has its main economic activity: 4120 — construction of residential and non-residential buildings. The company has a machine park that is in good technical condition. Earthworks — excavations, embankments and tamping are available; machines for manual, hydraulic and mechanised breaking of monolithic concrete, flooring and masonry; means of transport; apparatus for welding, etc. The company carries out its activities on construction sites throughout Bulgaria. Since 2012 the company has completed many construction projects in northwestern Bulgaria. After a company survey and anticipation of new sites in order to make the activity more effective, Construction Group Ltd. has rented a base with the following address: Pleven District, Bukovluk village, Autopolygon of Traffic Police. In the above-mentioned facility, the mechanisation of the project will be acquired and will be positioned when it is not used on a given site in Bulgaria. Some ongoing maintenance and repairs of the equipment will be carried out at the base. “Construction Group” Ltd. plans to improve its energy efficiency and reduce its costs by purchasing new high-performance and diverse construction machines such as: dumper, excavator, vibration roller, chain excavator with clip to recycle destroyed waste concrete, mini chain excavator, crusher that also serves for recycling construction waste, compressor station with tooling and hydraulic station. The company will use consulting services for the introduction and certification of an energy management system according to standard BDS EN ISO 50001 and Energy Audit Services to prescribe energy efficient measures. Through the project, the company plans to expand its activities, reduce the cost of construction, and thus become more competitive. This is a prerequisite for sustainable development, which will expand the market position of the company in the construction sector. (English) / qualifier | |||||||||||||||
point in time: 2 December 2021
|
Revision as of 11:10, 2 December 2021
Project Q3831589 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the energy efficiency of “Constraction Group” Ltd. |
Project Q3831589 in Bulgaria |
Statements
835,521.59 Bulgarian lev
0 references
1,620,302.63 Bulgarian lev
0 references
0.52 percent
0 references
17 August 2017
0 references
21 December 2018
0 references
„Кънстракшън груп“ ЕООД е с основна икономическа дейност: 4120 - строителство на жилищни и нежилищни сгради. Фирмата разполага с машинен парк, който е в добро техническо състояние. Налични са машини за извършване на земни работи - изкопи, насипи и трамбоване; машини за ръчно, хидравлично и механизирано разбиване на монолитен бетон, настилки и зидарии; транспортни средства; апарати за заваръчни работи и други. Компанията извършва дейността си на строителни обекти в цяла България. От 2012 година до сега фирмата е изпълнила много строителни проекти в северозападна България. След извършено фирмено проучване и очакване на нови обекти, за да е по-ефективна дейността, „Кънстракшън груп” ЕООД са наели база със следния адрес: Област Плевен, с. Буковлък, автополигон на КАТ. В споменатата база ще бъде придобита механизацията по проекта и ще бъде позиционирана, когато не се ползва на даден обект в България. В базата ще бъдат извършвани някои текущи обслужвания и ремонти на техниката. „Кънстракшън груп“ ЕООД планира да подобри енергийната си ефективност и да намали разходите си, като закупи нови високопроизводителни и разнообразни строителни машини като: самосвал, багер, вибрационен валяк, верижен багер с щипка за рециклиране на разрушения отпадъчен бетон, мини верижен багер, трошачка, която служи и за рециклиране на строителни отпадъци, компресорна станция с инструментална екипировка и хидравлична станция. Фирмата ще използва консултантски услуги за въвеждане и сертифициране на система за енергиен мениджмънт съгласно стандарт БДС EN ISO 50001 и услуги за Eнергиен одит, който да даде предписание за извършване на енергийно ефективни мерки. Посредством проекта, компанията планира да разшири дейността си, да намали себестойността на строителството, и по този начин да стане по-конкурентна. Това е предпоставка за устойчиво развитие, което ще разшири пазарните позиции на фирмата в строителния бранш. (Bulgarian)
0 references
“Constraction Group” Ltd. has its main economic activity: 4120 — construction of residential and non-residential buildings. The company has a machine park that is in good technical condition. Earthworks — excavations, embankments and tamping are available; machines for manual, hydraulic and mechanised breaking of monolithic concrete, flooring and masonry; means of transport; apparatus for welding, etc. The company carries out its activities on construction sites throughout Bulgaria. Since 2012 the company has completed many construction projects in northwestern Bulgaria. After a company survey and anticipation of new sites in order to make the activity more effective, Construction Group Ltd. has rented a base with the following address: Pleven District, Bukovluk village, Autopolygon of Traffic Police. In the above-mentioned facility, the mechanisation of the project will be acquired and will be positioned when it is not used on a given site in Bulgaria. Some ongoing maintenance and repairs of the equipment will be carried out at the base. “Construction Group” Ltd. plans to improve its energy efficiency and reduce its costs by purchasing new high-performance and diverse construction machines such as: dumper, excavator, vibration roller, chain excavator with clip to recycle destroyed waste concrete, mini chain excavator, crusher that also serves for recycling construction waste, compressor station with tooling and hydraulic station. The company will use consulting services for the introduction and certification of an energy management system according to standard BDS EN ISO 50001 and Energy Audit Services to prescribe energy efficient measures. Through the project, the company plans to expand its activities, reduce the cost of construction, and thus become more competitive. This is a prerequisite for sustainable development, which will expand the market position of the company in the construction sector. (English)
2 December 2021
0 references
с.Буковлък
0 references
Identifiers
BG16RFOP002-3.001-0144
0 references