“Integrated Water Project for Burgas District” (Q3832243): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Created claim: summary (P836): The “Integrated Water Project for Burgas Region” is prepared to build infrastructure that will achieve compliance with national and European legislation in the field of drinking water, waste water discharge and treatment and increase the efficiency of systems and facilities. The project activities aim at achieving compliance with the National Strategy for Management and Development of the Water Sector in the Republic of Bulgaria and the EU 2020...) |
||||||||||||||
Property / summary | |||||||||||||||
The “Integrated Water Project for Burgas Region” is prepared to build infrastructure that will achieve compliance with national and European legislation in the field of drinking water, waste water discharge and treatment and increase the efficiency of systems and facilities. The project activities aim at achieving compliance with the National Strategy for Management and Development of the Water Sector in the Republic of Bulgaria and the EU 2020 Strategy for Smart, Sustainable and Inclusive Growth through measures for the construction of WSS infrastructure. The designation of the specific WSS sites will contribute to achieving full compliance with the requirements of Directive 98/83/EC of 3 November 1998 and Directive 91/271 EEC of 21 May 1991. As a result of the analyses and studies carried out, the following measures have been identified to be included in the scope of the project: reconstruction, rehabilitation of the existing water and sewerage structure and construction of new systems and facilities in thirteen agglomerations with more than 10,000 eq. — Burgas, Nessebar, Pomorie, Sozopol, Primorsko, Obzor, Aytos, Karnobat, Tsarevo, Kiten, Chernomorets, Sarafovo and Lozenets, part of the separate territory served by Water Supply and Drainisation EAD Burgas. The project envisages the reconstruction of 158.296 km of water supply and 22.147 km of sewerage network, as well as the construction of 6.834 km of water supply and 73.154 km of sewerage network. 1 new WWTP will be built and 3 other WWTPs reconstructed. The reconstruction of 2 PWTPs is also envisaged. The additional number of population equivalents with access to improved waste water treatment after the project as well as the total pollution load collected and treated in full compliance with the applicable legislation as a consequence of the project will be 324 566 p.e. The residents with improved water supply will be 279 011. The scope of investments per agglomeration is described in the additional document “Project description” in point 12 of this form. (English) | |||||||||||||||
Property / summary: The “Integrated Water Project for Burgas Region” is prepared to build infrastructure that will achieve compliance with national and European legislation in the field of drinking water, waste water discharge and treatment and increase the efficiency of systems and facilities. The project activities aim at achieving compliance with the National Strategy for Management and Development of the Water Sector in the Republic of Bulgaria and the EU 2020 Strategy for Smart, Sustainable and Inclusive Growth through measures for the construction of WSS infrastructure. The designation of the specific WSS sites will contribute to achieving full compliance with the requirements of Directive 98/83/EC of 3 November 1998 and Directive 91/271 EEC of 21 May 1991. As a result of the analyses and studies carried out, the following measures have been identified to be included in the scope of the project: reconstruction, rehabilitation of the existing water and sewerage structure and construction of new systems and facilities in thirteen agglomerations with more than 10,000 eq. — Burgas, Nessebar, Pomorie, Sozopol, Primorsko, Obzor, Aytos, Karnobat, Tsarevo, Kiten, Chernomorets, Sarafovo and Lozenets, part of the separate territory served by Water Supply and Drainisation EAD Burgas. The project envisages the reconstruction of 158.296 km of water supply and 22.147 km of sewerage network, as well as the construction of 6.834 km of water supply and 73.154 km of sewerage network. 1 new WWTP will be built and 3 other WWTPs reconstructed. The reconstruction of 2 PWTPs is also envisaged. The additional number of population equivalents with access to improved waste water treatment after the project as well as the total pollution load collected and treated in full compliance with the applicable legislation as a consequence of the project will be 324 566 p.e. The residents with improved water supply will be 279 011. The scope of investments per agglomeration is described in the additional document “Project description” in point 12 of this form. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The “Integrated Water Project for Burgas Region” is prepared to build infrastructure that will achieve compliance with national and European legislation in the field of drinking water, waste water discharge and treatment and increase the efficiency of systems and facilities. The project activities aim at achieving compliance with the National Strategy for Management and Development of the Water Sector in the Republic of Bulgaria and the EU 2020 Strategy for Smart, Sustainable and Inclusive Growth through measures for the construction of WSS infrastructure. The designation of the specific WSS sites will contribute to achieving full compliance with the requirements of Directive 98/83/EC of 3 November 1998 and Directive 91/271 EEC of 21 May 1991. As a result of the analyses and studies carried out, the following measures have been identified to be included in the scope of the project: reconstruction, rehabilitation of the existing water and sewerage structure and construction of new systems and facilities in thirteen agglomerations with more than 10,000 eq. — Burgas, Nessebar, Pomorie, Sozopol, Primorsko, Obzor, Aytos, Karnobat, Tsarevo, Kiten, Chernomorets, Sarafovo and Lozenets, part of the separate territory served by Water Supply and Drainisation EAD Burgas. The project envisages the reconstruction of 158.296 km of water supply and 22.147 km of sewerage network, as well as the construction of 6.834 km of water supply and 73.154 km of sewerage network. 1 new WWTP will be built and 3 other WWTPs reconstructed. The reconstruction of 2 PWTPs is also envisaged. The additional number of population equivalents with access to improved waste water treatment after the project as well as the total pollution load collected and treated in full compliance with the applicable legislation as a consequence of the project will be 324 566 p.e. The residents with improved water supply will be 279 011. The scope of investments per agglomeration is described in the additional document “Project description” in point 12 of this form. (English) / qualifier | |||||||||||||||
point in time: 2 December 2021
|
Revision as of 10:20, 2 December 2021
Project Q3832243 in Bulgaria
Language | Label | Description | Also known as |
---|---|---|---|
English | “Integrated Water Project for Burgas District” |
Project Q3832243 in Bulgaria |
Statements
123,872,029.71 Bulgarian lev
0 references
172,995,963.94 Bulgarian lev
0 references
0.72 percent
0 references
2 July 2020
0 references
31 May 2024
0 references
0 references
„Интегриран воден проект за област Бургас“ е подготвен с цел изграждане на инфраструктура, чрез която ще се постигне съответствие с националното и европейското законодателство в областта на питейните води, отвеждането и пречистването на отпадъчните води и повишаване на ефективността на системите и съоръженията. Проектните дейности целят постигане на съответствие с Националната стратегия за управление и развитие на водния сектор в Република България и Стратегия „Европа 2020“ на ЕС за интелигентен, устойчив и приобщаващ растеж чрез мерки за изграждане на ВиК инфраструктура. Определянето на конкретните обекти по ВиК системите ще допринесе до постигане на пълно съответствие с изискванията на Директива 98/83/ЕО от 3 ноември 1998 година и Директива 91/271 ЕИО от 21 май 1991 година. В резултат на извършените анализи и проучвания, са идентифицирани следните мерки, които да се включат в обхвата на проекта: реконструкция, рехабилитация на съществуващата ВиК структура и изграждане на нови системи и съоръжения в тринадесет агломерации с над 10 000 екв.ж. – Бургас, Несебър, Поморие, Созопол, Приморско, Обзор, Айтос, Карнобат, Царево, Китен, Черноморец, Сарафово и Лозенец, част от обособената територия, обслужвана от „Водоснабдяване и Канализация“ ЕАД гр. Бургас. Проектът предвижда реконструкция на 158,296 км водопроводна и 22,147 км канализационна мрежа, както и изграждане на 6,834 км водопроводна и 73,154 км канализационна мрежа. Ще бъде изградена 1 нова ПСОВ и реконструирани 3 други ПСОВ. Предвидена е и реконструкция на 2 бр. ПСПВ. Допълнителният брой еквивалент жители с достъп до подобрено пречистване на отпадъчните води след проекта, както и общият товар на замърсяване, който се събира и третира в пълно съответствие с приложимото законодателство в следствие на проекта ще бъде 324 566 е.ж. Жителите с подобрено водоснабдяване ще бъдат 279 011. Обхватът на инвестициите по агломерации е описан в допълнителен документ "Описание на проекта" в т.12 от настоящия формуляр. (Bulgarian)
0 references
The “Integrated Water Project for Burgas Region” is prepared to build infrastructure that will achieve compliance with national and European legislation in the field of drinking water, waste water discharge and treatment and increase the efficiency of systems and facilities. The project activities aim at achieving compliance with the National Strategy for Management and Development of the Water Sector in the Republic of Bulgaria and the EU 2020 Strategy for Smart, Sustainable and Inclusive Growth through measures for the construction of WSS infrastructure. The designation of the specific WSS sites will contribute to achieving full compliance with the requirements of Directive 98/83/EC of 3 November 1998 and Directive 91/271 EEC of 21 May 1991. As a result of the analyses and studies carried out, the following measures have been identified to be included in the scope of the project: reconstruction, rehabilitation of the existing water and sewerage structure and construction of new systems and facilities in thirteen agglomerations with more than 10,000 eq. — Burgas, Nessebar, Pomorie, Sozopol, Primorsko, Obzor, Aytos, Karnobat, Tsarevo, Kiten, Chernomorets, Sarafovo and Lozenets, part of the separate territory served by Water Supply and Drainisation EAD Burgas. The project envisages the reconstruction of 158.296 km of water supply and 22.147 km of sewerage network, as well as the construction of 6.834 km of water supply and 73.154 km of sewerage network. 1 new WWTP will be built and 3 other WWTPs reconstructed. The reconstruction of 2 PWTPs is also envisaged. The additional number of population equivalents with access to improved waste water treatment after the project as well as the total pollution load collected and treated in full compliance with the applicable legislation as a consequence of the project will be 324 566 p.e. The residents with improved water supply will be 279 011. The scope of investments per agglomeration is described in the additional document “Project description” in point 12 of this form. (English)
2 December 2021
0 references
Бургас
0 references
Identifiers
BG16M1OP002-1.016-0011
0 references