Emergency Measures 2017 — Water Resource Improvement — Combani Dam — Flood Evacuator Upgrade and Telemetry Design (Q3700755): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Durchführung der Arbeiten an der Aufrüstung des Hochwasserableiters des Staudamms von Combani, um den Evakuator zu ändern, indem die Speicherung eines zusätzlichen Volumens (Erhöhung der NR um einen Meter) bei gleichzeitiger Gewährleistung eines den gesetzlichen Anforderungen entsprechenden Sicherheitsniveaus des Staudamms ermöglicht wird., translated_summary)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
Noodmaatregelen 2017 — Verbetering van de watervoorraden — Combani Dam — Flood Evacuator Upgrade en Telemetrie Design
Property / summary
 
Voltooiing van de upgrade van de Combani Dam Flood Evacuator om de evacuator te wijzigen door de opslag van een extra volume (toename van het RN met één meter) mogelijk te maken en tegelijkertijd een veiligheidsniveau van de dam te waarborgen in overeenstemming met de wettelijke voorschriften. (Dutch)
Property / summary: Voltooiing van de upgrade van de Combani Dam Flood Evacuator om de evacuator te wijzigen door de opslag van een extra volume (toename van het RN met één meter) mogelijk te maken en tegelijkertijd een veiligheidsniveau van de dam te waarborgen in overeenstemming met de wettelijke voorschriften. (Dutch) / rank
 
Normal rank
Property / summary: Voltooiing van de upgrade van de Combani Dam Flood Evacuator om de evacuator te wijzigen door de opslag van een extra volume (toename van het RN met één meter) mogelijk te maken en tegelijkertijd een veiligheidsniveau van de dam te waarborgen in overeenstemming met de wettelijke voorschriften. (Dutch) / qualifier
 
point in time: 6 December 2021
Timestamp+2021-12-06T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:08, 6 December 2021

Project Q3700755 in France
Language Label Description Also known as
English
Emergency Measures 2017 — Water Resource Improvement — Combani Dam — Flood Evacuator Upgrade and Telemetry Design
Project Q3700755 in France

    Statements

    0 references
    1,179,229.0 Euro
    0 references
    2,034,194.0 Euro
    0 references
    57.97 percent
    0 references
    15 January 2017
    0 references
    31 December 2019
    0 references
    SI D'EAU ET D'ASSAINISSEMENT DE MAYOTTE (SIEAM)
    0 references
    0 references
    Réalisation des travaux de la rehausse de l'évacuateur de crues du barrage de Combani afin de modifier l'évacuateur en permettant le stockage d'un volume supplémentaire (élévation de la RN d'un mètre) tout en assurant un niveau de sûreté du barrage conforme aux exigences réglementaires. (French)
    0 references
    Completion of the upgrade of the Combani Dam Flood Evacuator in order to modify the evacuator by allowing the storage of an additional volume (increase of the RN by one metre) while ensuring a level of safety of the dam in accordance with regulatory requirements. (English)
    22 November 2021
    0 references
    Durchführung der Arbeiten an der Aufrüstung des Hochwasserableiters des Staudamms von Combani, um den Evakuator zu ändern, indem die Speicherung eines zusätzlichen Volumens (Erhöhung der NR um einen Meter) bei gleichzeitiger Gewährleistung eines den gesetzlichen Anforderungen entsprechenden Sicherheitsniveaus des Staudamms ermöglicht wird. (German)
    1 December 2021
    0 references
    Voltooiing van de upgrade van de Combani Dam Flood Evacuator om de evacuator te wijzigen door de opslag van een extra volume (toename van het RN met één meter) mogelijk te maken en tegelijkertijd een veiligheidsniveau van de dam te waarborgen in overeenstemming met de wettelijke voorschriften. (Dutch)
    6 December 2021
    0 references

    Identifiers

    PY0017590
    0 references