The construction of an intelligent network in central Wielkopolska (OD Poznań Price) through modernisation and reconstruction of lines and stations of SN and nn, automation of lines and stations as a result of remote control and power protection automation, including short-circuit current flow indicators. (Q84764): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in fr: translated_label)
(‎Created claim: summary (P836): L’objectif direct du projet est de garantir un système énergétique efficace et économiquement et techniquement durable, avec de faibles pertes et un niveau élevé de qualité et de sécurité d’approvisionnement et de sécurité. L’objectif direct et donc le projet sont conformes aux objectifs du programme opérationnel, de l’axe prioritaire et de l’action et des sous-mesures. La construction d’un réseau électrique intelligent dans les communes de Swar...)
Property / summary
 
L’objectif direct du projet est de garantir un système énergétique efficace et économiquement et techniquement durable, avec de faibles pertes et un niveau élevé de qualité et de sécurité d’approvisionnement et de sécurité. L’objectif direct et donc le projet sont conformes aux objectifs du programme opérationnel, de l’axe prioritaire et de l’action et des sous-mesures. La construction d’un réseau électrique intelligent dans les communes de Swarzędz, Kostrzyn, Suchy Las, Szamotuły, Kaźmierz, Rokietnica, Oborniki, Obrzycko, Mieścisko, Mieleszyn, Kłecko, Gniezno, Czerniejewo, Września, Łubowo et Poznań permettra la mise en œuvre de la fonctionnalité SMART, ainsi que la mise en place de compteurs intelligents pour les clients concernés par le projet, permettant un suivi en temps réel de la consommation d’électricité. Le projet prévoit la modernisation du réseau électrique actuel dans la zone désignée.Le concept de mise en œuvre du projet implique la construction d’un réseau intelligent en modernisant et en construisant de nouvelles stations d’automatisation du réseau répondant aux normes du système FDIR dans la zone de la branche centrale de distribution de Poznań (communes: Swarzędz, Kostrzyn, Suchy Forest, Szamotuły, Kaźmierz, Rokietnica, Oborniki, Oborniki, Obrzycko, Mieścisko, Mieleszyn, Kłecko, Gniezno, Czerniejewo, Września, Łubowo et à Poznań) et la reconstruction de base des lignes électriques avec de nouvelles connexions. Les tâches incluses dans le projet seront les suivantes: — changement du type de câbles en isolation, — augmentation de la section transversale de la ligne SN avec les cartographies nécessaires, — utilisation de la télécommande et de l’automatisation de la protection électrique, y compris, entre autres, indicateurs de débit de courant court-circuit, déconnexeurs, rectologues, — modernisation des stations SN/nn. (French)
Property / summary: L’objectif direct du projet est de garantir un système énergétique efficace et économiquement et techniquement durable, avec de faibles pertes et un niveau élevé de qualité et de sécurité d’approvisionnement et de sécurité. L’objectif direct et donc le projet sont conformes aux objectifs du programme opérationnel, de l’axe prioritaire et de l’action et des sous-mesures. La construction d’un réseau électrique intelligent dans les communes de Swarzędz, Kostrzyn, Suchy Las, Szamotuły, Kaźmierz, Rokietnica, Oborniki, Obrzycko, Mieścisko, Mieleszyn, Kłecko, Gniezno, Czerniejewo, Września, Łubowo et Poznań permettra la mise en œuvre de la fonctionnalité SMART, ainsi que la mise en place de compteurs intelligents pour les clients concernés par le projet, permettant un suivi en temps réel de la consommation d’électricité. Le projet prévoit la modernisation du réseau électrique actuel dans la zone désignée.Le concept de mise en œuvre du projet implique la construction d’un réseau intelligent en modernisant et en construisant de nouvelles stations d’automatisation du réseau répondant aux normes du système FDIR dans la zone de la branche centrale de distribution de Poznań (communes: Swarzędz, Kostrzyn, Suchy Forest, Szamotuły, Kaźmierz, Rokietnica, Oborniki, Oborniki, Obrzycko, Mieścisko, Mieleszyn, Kłecko, Gniezno, Czerniejewo, Września, Łubowo et à Poznań) et la reconstruction de base des lignes électriques avec de nouvelles connexions. Les tâches incluses dans le projet seront les suivantes: — changement du type de câbles en isolation, — augmentation de la section transversale de la ligne SN avec les cartographies nécessaires, — utilisation de la télécommande et de l’automatisation de la protection électrique, y compris, entre autres, indicateurs de débit de courant court-circuit, déconnexeurs, rectologues, — modernisation des stations SN/nn. (French) / rank
 
Normal rank
Property / summary: L’objectif direct du projet est de garantir un système énergétique efficace et économiquement et techniquement durable, avec de faibles pertes et un niveau élevé de qualité et de sécurité d’approvisionnement et de sécurité. L’objectif direct et donc le projet sont conformes aux objectifs du programme opérationnel, de l’axe prioritaire et de l’action et des sous-mesures. La construction d’un réseau électrique intelligent dans les communes de Swarzędz, Kostrzyn, Suchy Las, Szamotuły, Kaźmierz, Rokietnica, Oborniki, Obrzycko, Mieścisko, Mieleszyn, Kłecko, Gniezno, Czerniejewo, Września, Łubowo et Poznań permettra la mise en œuvre de la fonctionnalité SMART, ainsi que la mise en place de compteurs intelligents pour les clients concernés par le projet, permettant un suivi en temps réel de la consommation d’électricité. Le projet prévoit la modernisation du réseau électrique actuel dans la zone désignée.Le concept de mise en œuvre du projet implique la construction d’un réseau intelligent en modernisant et en construisant de nouvelles stations d’automatisation du réseau répondant aux normes du système FDIR dans la zone de la branche centrale de distribution de Poznań (communes: Swarzędz, Kostrzyn, Suchy Forest, Szamotuły, Kaźmierz, Rokietnica, Oborniki, Oborniki, Obrzycko, Mieścisko, Mieleszyn, Kłecko, Gniezno, Czerniejewo, Września, Łubowo et à Poznań) et la reconstruction de base des lignes électriques avec de nouvelles connexions. Les tâches incluses dans le projet seront les suivantes: — changement du type de câbles en isolation, — augmentation de la section transversale de la ligne SN avec les cartographies nécessaires, — utilisation de la télécommande et de l’automatisation de la protection électrique, y compris, entre autres, indicateurs de débit de courant court-circuit, déconnexeurs, rectologues, — modernisation des stations SN/nn. (French) / qualifier
 
point in time: 30 November 2021
Timestamp+2021-11-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:17, 30 November 2021

Project Q84764 in Poland
Language Label Description Also known as
English
The construction of an intelligent network in central Wielkopolska (OD Poznań Price) through modernisation and reconstruction of lines and stations of SN and nn, automation of lines and stations as a result of remote control and power protection automation, including short-circuit current flow indicators.
Project Q84764 in Poland

    Statements

    0 references
    12,415,706.26 zloty
    0 references
    2,979,769.50 Euro
    13 January 2020
    0 references
    17,430,700.0 zloty
    0 references
    4,183,368.0 Euro
    13 January 2020
    0 references
    71.23 percent
    0 references
    2 March 2017
    0 references
    31 December 2020
    0 references
    ENEA OPERATOR SP. Z O.O.
    0 references
    0 references
    0 references
    Bezpośrednim celem projektu jest zapewnienie efektywnego i zrównoważonego pod względem ekonomicznym i technicznym systemu energetycznego, o niskim poziomie strat oraz wysokim poziomie jakości oraz bezpieczeństwa dostaw i ochrony. Cel bezpośredni, a tym samym projekt, jest zgodny z celami Programu Operacyjnego, osi priorytetowej oraz działania i poddziałania. Budowa inteligentnej sieci elektroenergetycznej na terenie gmin Swarzędz, Kostrzyn, Suchy Las, Szamotuły, Kaźmierz, Rokietnica, Oborniki, Obrzycko, Mieścisko, Mieleszyn, Kłecko, Gniezno, Czerniejewo, Września, Łubowo i m. Poznań umożliwi zaimplementowanie funkcjonalności SMART, jak również wdrożenie inteligentnych liczników u odbiorców objętych projektem, pozwalających na monitorowanie zużycia energii elektrycznej w czasie rzeczywistym. Projekt przewiduje modernizację obecnej sieci elektroenergetycznej na wskazanym terenie.Przyjęta koncepcja realizacji projektu zakłada budowę sieci inteligentnej poprzez modernizację istniejących i budowę nowych stanowisk automatyki sieciowej spełniających standard systemu FDIR na obszarze Centralnym Oddziału Dystrybucji Poznań (tereny gmin: Swarzędz, Kostrzyn, Suchy Las, Szamotuły, Kaźmierz, Rokietnica, Oborniki, Obrzycko, Mieścisko, Mieleszyn, Kłecko, Gniezno, Czerniejewo, Września, Łubowo i na terenie m. Poznania) oraz odcinkową przebudowę linii zasilających wraz z nowymi powiązaniami. Zadania ujęte w projekcie polegać będą na: - zmianie rodzaju przewodów na izolowane, - zwiększeniu przekroju linii SN z niezbędnymi skablowaniami, - zastosowanie zdalnego sterowania i elektroenergetycznej automatyki zabezpieczeniowej, w tym między innymi wskaźników przepływu prądów zwarciowych, rozłączników, reklozerów, - modernizacji stacji SN/nn. (Polish)
    0 references
    The direct objective of the project is to ensure an efficient and economically and technically sustainable energy system with low losses and a high level of quality and security of supply and security. The direct objective, and thus the project, is in line with the objectives of the Operational Programme, the priority axis and the actions and sub-measures. The construction of an intelligent power grid in the communes of Swarzędz, Kostrzyn, Suchy Forest, Szamotuły, Kaźmierz, Rokietnica, Oborniki, Obrzycko, Mieścisko, Mieleszyn, Kłecko, Gniezno, Czerniejewo, Września, Łubowo and m. Poznań will enable implementation of SMART functionality, as well as the implementation of intelligent meters in the project’s customers, enabling real-time monitoring of electricity consumption. The project provides for the modernisation of the current electricity grid in the designated area.The adopted concept of the project involves the construction of an intelligent network by modernising existing and building new network automation stations meeting the FDIR standard in the area of the Central Division of Distribution Poznań (community areas: Swarzędz, Kostrzyn, Suchy Forest, Szamotuły, Kaźmierz, Rokietnica, Oborniki, Obrzycko, Mieścisko, Mieleszyn, Kłecko, Gniezno, Czerniejewo, Września, Łubowo and in Poznań, as well as a partial reconstruction of power lines along with new connections. The tasks included in the project will consist of: — changing the type of cables to insulated, – increasing the cross-section of the SN line with the necessary wiring, – application of remote control and power protection automation, including, inter alia, short-circuit current flow indicators, disconnectors, reclusers, – modernisation of the SN/nn station. (English)
    14 October 2020
    0 references
    L’objectif direct du projet est de garantir un système énergétique efficace et économiquement et techniquement durable, avec de faibles pertes et un niveau élevé de qualité et de sécurité d’approvisionnement et de sécurité. L’objectif direct et donc le projet sont conformes aux objectifs du programme opérationnel, de l’axe prioritaire et de l’action et des sous-mesures. La construction d’un réseau électrique intelligent dans les communes de Swarzędz, Kostrzyn, Suchy Las, Szamotuły, Kaźmierz, Rokietnica, Oborniki, Obrzycko, Mieścisko, Mieleszyn, Kłecko, Gniezno, Czerniejewo, Września, Łubowo et Poznań permettra la mise en œuvre de la fonctionnalité SMART, ainsi que la mise en place de compteurs intelligents pour les clients concernés par le projet, permettant un suivi en temps réel de la consommation d’électricité. Le projet prévoit la modernisation du réseau électrique actuel dans la zone désignée.Le concept de mise en œuvre du projet implique la construction d’un réseau intelligent en modernisant et en construisant de nouvelles stations d’automatisation du réseau répondant aux normes du système FDIR dans la zone de la branche centrale de distribution de Poznań (communes: Swarzędz, Kostrzyn, Suchy Forest, Szamotuły, Kaźmierz, Rokietnica, Oborniki, Oborniki, Obrzycko, Mieścisko, Mieleszyn, Kłecko, Gniezno, Czerniejewo, Września, Łubowo et à Poznań) et la reconstruction de base des lignes électriques avec de nouvelles connexions. Les tâches incluses dans le projet seront les suivantes: — changement du type de câbles en isolation, — augmentation de la section transversale de la ligne SN avec les cartographies nécessaires, — utilisation de la télécommande et de l’automatisation de la protection électrique, y compris, entre autres, indicateurs de débit de courant court-circuit, déconnexeurs, rectologues, — modernisation des stations SN/nn. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.01.04.01-00-0016/17
    0 references