DRR: Kočevje cyclist (Q3277558): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Organisation der Radroute in der Gemeinde Kočevje an mehreren Standorten. Die neu gebaute Radstrecke beträgt 5,23 km und die Länge des gesamten Abschnitts mit der bestehenden Infrastruktur 5,27 km., translated_summary) |
(Changed label, description and/or aliases in nl: translated_label) |
||
label / nl | label / nl | ||
DRR: Kočevje fietser |
Revision as of 17:45, 29 November 2021
Project Q3277558 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | DRR: Kočevje cyclist |
Project Q3277558 in Slovakia |
Statements
2,547,575.2 Euro
0 references
3,184,469.0 Euro
0 references
80.0 percent
0 references
1 June 2017
0 references
31 December 2022
0 references
OBČINA KOČEVJE
0 references
1330
0 references
Ureditev kolesarski poti v občini Kočevje na več lokacijah. Dolžina novo zgrajene kolesarske povezave znaša 5,23 km, dolžina celotnega odseka z obstoječo infrastrukturo pa znaša 5,27 km. (Slovenian)
0 references
Organisation of the cycling route in the municipality of Kočevje at several locations. The length of the newly built cycling link is 5.23 km and the length of the entire section with the existing infrastructure is 5.27 km. (English)
19 October 2021
0 references
Organisation de la piste cyclable dans la municipalité de Kočevje à plusieurs endroits. La longueur de la liaison cyclable nouvellement construite est de 5,23 km et la longueur de l’ensemble du tronçon avec l’infrastructure existante est de 5,27 km. (French)
27 November 2021
0 references
Organisation der Radroute in der Gemeinde Kočevje an mehreren Standorten. Die neu gebaute Radstrecke beträgt 5,23 km und die Länge des gesamten Abschnitts mit der bestehenden Infrastruktur 5,27 km. (German)
29 November 2021
0 references
Identifiers
OP20.07465
0 references