Improving accessibility to the TEN-T network in Upper Pova – Stage III (Q3103066): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): L’objectif du projet est d’améliorer l’accessibilité aux infrastructures du RTE-T et aux routes de classe I dans la région de la Haute-Považie. L’objectif spécifique du projet est de reconstruire et de moderniser la voie II/583 afin d’améliorer l’accessibilité au réseau RTE-T et aux routes de classe I dans la région de Haute-Považie. La route 583 de classe II mesure 44,645 km de long. Il commence à Žilina et se termine dans le district de Párnic...)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Verbesserung der Zugänglichkeit des TEN-V-Netzes in der Region Ober-Považie – Stufe III

Revision as of 22:02, 29 November 2021

Project Q3103066 in Slovakia
Language Label Description Also known as
English
Improving accessibility to the TEN-T network in Upper Pova – Stage III
Project Q3103066 in Slovakia

    Statements

    0 references
    2,224,195.25 Euro
    0 references
    2,616,700.29 Euro
    0 references
    85.0 percent
    0 references
    1 October 2020
    0 references
    1 November 2021
    0 references
    Žilinský samosprávny kraj
    0 references
    0 references

    49°12'23.87"N, 18°46'19.88"E
    0 references
    Cieľom projektu je zlepšiť dostupnosť k infraštruktúre TEN-T a cestám I. triedy v regióne Horné Považie. Špecifickým cieľom projektu je rekonštruovať a modernizovať cestu II/583 za účelom zlepšenia dostupnosti k sieti TEN-T a cestám I. triedy v regióne Horné Považie. Cesta II. triedy 583 je dlhá 44,645 km. Začína sa v Žiline a končí v Párnici okres Dolný Kubín. Cesta II/583 sa zo západnej strany napája prostredníctvom cesty I/11 na základnú TEN-T sieť – Balticko – jadranský koridor, konkrétne na úsek diaľnice D3 Žilina, Strážov – Žilina, Brodno. Tento úsek sa ďalej napája na úsek D3 Žilina, Brodno – Kysucké Nové Mesto. Z východnej strany sa cesta II/583 napája na súhrnnú sieť TEN-T, konkrétne na úsek R3 Dolný Kubín – D1. Rekonštruovať a zmodernizovať cestu II/583 je potrebné z dôvodu odstránenia identifikovaných problémov, potreby zvýšenia plynulosti dopravy, zvýšenia bezpečnosti účastníkov cestnej premávky. Realizáciou projektu dôjde k zvýšeniu bezpečnosti účastníkov cestnej premávky, k zvýšeniu plynulosti dopravy. Rovnako sa skvalitní dopravná infraštruktúra, a tým i kvalita dopravnej obsluhy a dopravných prepojení. Pri spracovaní projektovej dokumentácie na základe, ktorej sa bude realizovať rekonštrukcia a modernizácia úsekov cesty, boli zapracované aj pripomienky z bezpečnostného auditu. Z hľadiska dopravnej funkcie, ktorú táto cesta plní dôjde k zlepšeniu a k skvalitneniu dopravného prepojenia regiónov Horné Považie, Orava a Kysuce, v spojení s krajským mestom Žilina a  sekundárnych a terciárnych uzlov s infraštruktúrou TEN-T vrátane multimodálnych uzlov. Zvýši sa plynulosť a bezpečnosť cestnej premávky pričom cesta II/583, ktorá je hlavná obchádzková trasa v prípade kolízie resp. uzávery cesty I. triedy na ťahu ZA - MT (hlavne úsek pod Strečnom). Realizáciou navrhovaných aktivít dôjde k rekonštrukcii ciest II. triedy s dĺžkou 1,58 km. V rámci realizácie projektu dôjde k výmene asfaltových vrstiev, vyznačeniu prechodov pre peších, rekonštrukcii nespevnenej krajnice, zosilneniu vozovky, rekonštrukcii priepustov, vo vybraných úsekoch cesty II/583 dôjde k výmene celej konštrukcie vozovky, k rekonštrukcii mostov, verejnému osvetleniu prechodov pre peších a sanácií zosuvu vozovky. Výsledkom realizácie hlavnej aktivity projektu bude komplexná rekonštrukcia a modernizácia mostného objektu 583-009 ponad rieku Varínka a súvisiace zrušenie mosta 583-010. Realizáciou navrhovaných prác sa predĺži životnosť konštrukcie mosta a zvýši sa bezpečnosť účastníkov cestnej premávky v danom bode. Po riadnom a úplnom realizovaní navrhovaných prác sa zároveň odstránia príčiny existujúcich porúch mostného objektu. V katastrálnom území obce Terchová bude realizovaná sanácia zosuvu vozovky v km 26,71 – 26,95 a prestavba mosta 583 – 020 ponad Biely potok k pozemku č. 15035. Vybuduje sa  212m oporného múru, ktorým sa stabilizuje zosuv vozovky, ďalej sa prestavajú 2 mosty. V rámci realizácie projektu bude rekonštruovaná a modernizovaná cesta II/583 v katastrálnom území Varín, Krasňany, Belá, Terchová vrátane rekonštrukcie a modernizácie verejného osvetlenia v rozsahu uvedenom v rozpočte projektu. Prevádzková a technická udržateľnosť výstupov projektu počas celého obdobia udržateľnosti bude zabezpečená žiadateľom v súlade s platnou slovenskou legislatívou a to vlastnými kapacitami žiadateľa. Predmetné cesty sú vo vlastníctve žiadateľa, ŽSK v súlade s platnou slovenskou legislatívou zabezpečuje majetkovú správu, údržbu ciest a ich prevádzku. Správa ciest ŽSK vykonáva činnosti v pôsobnosti celého ŽSK v oblasti cestnej dopravy. Jej činnosť vyplýva z plnenia povinnosti podľa osobitných zákonov a ďalších predpisov (cestný zákon 135/1961 Z. z. zákon o premávke na pozemných komunikáciách 315/1993 Z. z. v znení neskorších predpisov, technických predpisov MDVaRR SR). Finančné krytie prevádzky projektu počas celej doby referenčného obdobia bude zabezpečovať ŽSK zo svojho rozpočtu. ŽSK každý rok schvaľuje svoj rozpočet, pričom berie do úvahy financie potrebné na zabezpečenie prevádzky a údržby ciest v jej vlastníctve. ŽSK má potrebné finančné krytie na zabezpečenie prevádzky a udržateľnosti výstupov projektu. Správa ciest ŽSK, ktorá vykonáva činnosti v pôsobnosti celého ŽSK v oblasti cestnej dopravy je príspevková organizácia, ktorá je svojim rozpočtom napojená na rozpočet ŽSK.V prípade výskytu závad a nedostatkov na modernizovaných úsekoch ciest, na vykonané práce sa bude vzťahovať záručná doba a zodpovednosť za vady a teda možnosť uplatniť bezplatné odstránenie vady počas záručnej doby. Technické zabezpečenie realizácie projektu bude riešené dodávateľsky. Prevádzková a technická udržateľnosť výstupov projektu počas celého obdobia udržateľnosti bude zabezpečená žiadateľom v súlade s platnou slovenskou legislatívou. ŽSK má potrebné finančné krytie na zabezpečenie prevádzky a udržateľnosti výstupov projektu. (Slovak)
    0 references
    The aim of the project is to improve accessibility to TEN-T infrastructure and to Class I roads in the Upper Považie region. The specific objective of the project is to reconstruct and modernise pathway II/583 in order to improve accessibility to the TEN-T network and to the roads of Class I in the region of Upper Považie. Class II road 583 is 44.645 km long. It begins in Žilina and ends in Párnica district Dolný Kubín. Road II/583 connects from the western side via road I/11 to the basic TEN-T network – the Baltic-Adriatic Corridor, namely the section of the D3 motorway Žilina, Strážov – Žilina, Brodno. This section is further connected to the section D3 Žilina, Brodno – Kysucké Nové Mesto. From the eastern side, road II/583 connects to the comprehensive TEN-T network, namely the section R3 Dolný Kubín – D1. Road II/583 needs to be reconstructed and modernised in order to remedy the problems identified, to increase traffic fluidity, to improve road users’ safety. The implementation of the project will increase the safety of road users, increase traffic fluidity. Transport infrastructure and thus the quality of transport operators and connections will also be improved. Comments from the safety audit were also incorporated in the processing of project documentation on the basis of which the reconstruction and modernisation of road sections will be carried out. From the point of view of the transport function that this road fulfils, there will be an improvement in the transport connection of the regions Horné Považie, Orava and Kysuce, in conjunction with the regional town of Žilina and secondary and tertiary nodes with TEN-T infrastructure, including multimodal nodes. The continuity and safety of road traffic will be increased, while road II/583, which is the main bypass route in the event of collision or closure of Class I road on the ZA-MT thrust (mainly the section below Strečná). The implementation of the proposed activities will result in the reconstruction of the 2nd class roads with a length of 1.58 km. As part of the implementation of the project there will be a change of asphalt layers, marking of pedestrian crossings, reconstruction of unpaved edges, road reinforcement, reconstruction of passes, in selected sections of road II/583 there will be a replacement of the entire road structure, reconstruction of bridges, public lighting of transitions for pedestrians and remediation of the slide. The result of the implementation of the main activity of the project will be a comprehensive reconstruction and modernisation of the bridge building 583-009 over the river Varínka and the related cancellation of the bridge 583-010. The implementation of the proposed works will extend the life of the bridge structure and increase the safety of road users at that point. At the same time, after proper and complete implementation of the proposed works, the causes of existing faults of the bridge building will be eliminated. In the cadastral area of the village Terchová will be carried out remediation of the landslide in km 26,71-26,95 and the conversion of the bridge 583-020 over the Biely potok to the plot No. 15035. 212 m of retaining wall is built, which stabilises the slides of the road and then rebuilds 2 bridges. As part of the implementation of the project, road II/583 will be reconstructed and modernised in the cadastral area of Varín, Krasňany, Belá, Terchová, including the reconstruction and modernisation of public lighting within the scope of the project budget. The operational and technical sustainability of the project outputs throughout the sustainability period will be ensured by the applicant in accordance with the applicable Slovak legislation and with the applicant’s own capacities. The roads in question are owned by the applicant, ŽSK, in accordance with the applicable Slovak legislation, provides property management, maintenance of roads and their operation. The road administration of ŽSK carries out activities within the scope of the whole ŽSK in the field of road transport. Its activities result from the fulfilment of an obligation under special laws and other regulations (Road Act 135/1961 Coll. on road traffic 315/1993 Coll., as amended, technical regulations of the MDVaRR SR). The financial envelope for the operation of the project during the whole period of the reference period will be provided by the ŽSK from its budget. Each year the ŽSK approves its budget, taking into account the funds needed to ensure the operation and maintenance of the roads in its ownership. ŽSK has the necessary financial envelope to ensure the operation and sustainability of the project outputs. (English)
    28 September 2021
    0 references
    L’objectif du projet est d’améliorer l’accessibilité aux infrastructures du RTE-T et aux routes de classe I dans la région de la Haute-Považie. L’objectif spécifique du projet est de reconstruire et de moderniser la voie II/583 afin d’améliorer l’accessibilité au réseau RTE-T et aux routes de classe I dans la région de Haute-Považie. La route 583 de classe II mesure 44,645 km de long. Il commence à Žilina et se termine dans le district de Párnica Dolný Kubín. La route II/583 relie du côté occidental par la route I/11 au réseau de base du RTE-T — le corridor Baltique-Adriatique, à savoir le tronçon de l’autoroute D3 Žilina, Strážov — Žilina, Brodno. Cette section est en outre reliée à la section D3 Žilina, Brodno — Kysucké Nové Mesto. Du côté est, la route II/583 est reliée au réseau RTE-T global, à savoir le tronçon R3 Dolný Kubín — D1. La route II/583 doit être reconstruite et modernisée afin de remédier aux problèmes identifiés, d’accroître la fluidité de la circulation et d’améliorer la sécurité des usagers de la route. La mise en œuvre du projet permettra d’accroître la sécurité des usagers de la route et d’accroître la fluidité du trafic. Les infrastructures de transport et, partant, la qualité des opérateurs et des connexions de transport seront également améliorées. Les commentaires de l’audit de sécurité ont également été pris en compte dans le traitement de la documentation relative au projet sur la base de laquelle la reconstruction et la modernisation des tronçons routiers seront effectuées. Du point de vue de la fonction de transport que cette route remplit, il y aura une amélioration de la connexion de transport des régions Horné Považie, Orava et Kysuce, en liaison avec la ville régionale de Žilina et les nœuds secondaires et tertiaires avec les infrastructures RTE-T, y compris les nœuds multimodaux. La continuité et la sécurité de la circulation routière seront renforcées, tandis que la route II/583, qui est la principale voie de contournement en cas de collision ou de fermeture de la route de classe I sur la poussée ZA-MT (principalement le tronçon au-dessous de Strečná). La mise en œuvre des activités proposées entraînera la reconstruction des routes de deuxième classe d’une longueur de 1,58 km. Dans le cadre de la mise en œuvre du projet, il y aura un changement des couches d’asphalte, le marquage des passages pour piétons, la reconstruction des bords non pavés, le renforcement des routes, la reconstruction des passages, dans certains tronçons de la route II/583, il y aura un remplacement de l’ensemble de la structure routière, la reconstruction des ponts, l’éclairage public des transitions pour les piétons et la remise en état de la glissière. Le résultat de la mise en œuvre de l’activité principale du projet sera la reconstruction et la modernisation globales du bâtiment du pont 583-009 sur la rivière Varínka et l’annulation du pont 583-010. La mise en œuvre des travaux proposés prolongera la durée de vie de la structure du pont et augmentera la sécurité des usagers de la route à ce stade. Dans le même temps, après la mise en œuvre correcte et complète des travaux proposés, les causes des défauts existants du bâtiment du pont seront éliminées. Dans la zone cadastrale du village Terchová sera effectué la remise en état du glissement de terrain au km 26,71-26,95 et la conversion du pont 583-020 sur le Biely potok à la parcelle no 15035. 212 m de mur de soutènement est construit, ce qui stabilise les toboggans de la route et reconstruit ensuite 2 ponts. Dans le cadre de la mise en œuvre du projet, la route II/583 sera reconstruite et modernisée dans la zone cadastrale de Varín, Krasňany, Belá, Terchová, y compris la reconstruction et la modernisation de l’éclairage public dans le cadre du budget du projet. La durabilité opérationnelle et technique des résultats du projet tout au long de la période de durabilité sera assurée par le demandeur conformément à la législation slovaque applicable et aux capacités propres du demandeur. Les routes en question sont la propriété de la requérante, ŽSK, conformément à la législation slovaque applicable, qui assure la gestion immobilière, l’entretien des routes et leur exploitation. L’administration routière de ŽSK exerce des activités dans le cadre de l’ensemble de ŽSK dans le domaine du transport routier. Ses activités résultent de l’exécution d’une obligation en vertu de lois spéciales et autres règlements (loi sur la route 135/1961 Rec. sur la circulation routière 315/1993 Rec., telle que modifiée, règlements techniques du MDVaRR SR). L’enveloppe financière pour le fonctionnement du projet pendant toute la période de référence sera fournie par le ŽSK sur son budget. Chaque année, le ŽSK approuve son budget, en tenant compte des fonds nécessaires pour assurer l’exploitation et l’entretien des routes dont elle est propriétaire. ŽSK dispose de l’enveloppe financière nécessaire pour assurer le fonctionnement et la durabilité des résultats du projet. (French)
    27 November 2021
    0 references

    Identifiers

    302011Q797
    0 references