Construction of a new operating building (Q3060950): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Construction d’un nouveau bâtiment d’exploitation par Solar Electric Buidlings GmbH. Il s’agit d’une halle en acier avec construction en bois. La surface de production est ainsi triplée., translated_summary) |
(Changed label, description and/or aliases in nl: translated_label) |
||
label / nl | label / nl | ||
Bouw van een nieuw fabrieksgebouw |
Revision as of 06:23, 29 November 2021
Project Q3060950 in Austria
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a new operating building |
Project Q3060950 in Austria |
Statements
1,315,100.0 Euro
0 references
19 November 2019
0 references
30 June 2022
0 references
my-PV GmbH;Solar Electric Buildings GmbH
0 references
41516
0 references
Construction of a new operating building by Solar Electric Buidlings GmbH. It is a steel hall with wooden construction. The production area is tripled as a result. (English)
20 July 2021
0 references
Errichtung eines neuen Betriebsgebäudes durch die Solar Electric Buidlings GmbH. Es handelt sich um eine Stahlhalle mit Holzverbau. Die Fertigungsfläche wird dadurch verdreifacht. (Austrian German)
0 references
Construction d’un nouveau bâtiment d’exploitation par Solar Electric Buidlings GmbH. Il s’agit d’une halle en acier avec construction en bois. La surface de production est ainsi triplée. (French)
27 November 2021
0 references
Sierning
0 references
Identifiers
AUST-662
0 references