Energy saving measures (Q3060455): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr: translated_label) |
(Created claim: summary (P836): Optimisation de l’installation Système de torréfaction de café Röster 2, Mesures d’économie d’énergie, Marchtrenk, translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
Optimisation de l’installation Système de torréfaction de café Röster 2, Mesures d’économie d’énergie, Marchtrenk (French) | |||||||||||||||
Property / summary: Optimisation de l’installation Système de torréfaction de café Röster 2, Mesures d’économie d’énergie, Marchtrenk (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Optimisation de l’installation Système de torréfaction de café Röster 2, Mesures d’économie d’énergie, Marchtrenk (French) / qualifier | |||||||||||||||
point in time: 27 November 2021
|
Revision as of 09:41, 27 November 2021
Project Q3060455 in Austria
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy saving measures |
Project Q3060455 in Austria |
Statements
225,000.0 Euro
0 references
10 April 2017
0 references
31 December 2018
0 references
SPAR Österreichische Warenhandels AG ZN Marchtrenk
0 references
41812
0 references
Plant optimisation Coffee roasting plant Röster 2, Betr. Energy-saving measures, Marchtrenk (English)
20 July 2021
0 references
Anlagenoptimierung Kaffeeröstanlage Röster 2, Betr. Energiesparmaßnahmen, Marchtrenk (Austrian German)
0 references
Optimisation de l’installation Système de torréfaction de café Röster 2, Mesures d’économie d’énergie, Marchtrenk (French)
27 November 2021
0 references
Marchtrenk
0 references
Identifiers
AUST-171
0 references