State Road No 8 Tallinn – Paldiski km 24.9-29.5 Keila – Reconstruction of Valkse section (Q3067951): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Avec la reconstruction de la route nationale no 8 Tallinn — Paldiski km 24,9-29.5 Keila — Valkse, la construction d’un nouveau revêtement de route correspondant aux paramètres de largeur et à la fréquence de charge prospective de la classe III est prévue. La longueur du tronçon à reconstruire est de 4,7 km. La route principale a une largeur de 9,0 m et la largeur de la voie 3,5 m. Sur les routes secondaires et sur les rues, la largeur du couvert...)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Staatsstraße Nr. 8 Tallinn – Paldiski km 24.9-29,5 Keila – Umbau des Abschnitts Valkse

Revision as of 10:00, 30 November 2021

Project Q3067951 in Estonia
Language Label Description Also known as
English
State Road No 8 Tallinn – Paldiski km 24.9-29.5 Keila – Reconstruction of Valkse section
Project Q3067951 in Estonia

    Statements

    0 references
    5,620,608.00 Euro
    0 references
    6,612,480.0 Euro
    0 references
    85.0 percent
    0 references
    30 September 2014
    0 references
    31 March 2016
    0 references
    Transpordiamet
    0 references
    0 references
    0 references

    59°21'23.40"N, 24°37'49.04"E
    0 references
    10916
    0 references
    Riigimaantee nr 8 Tallinn – Paldiski km 24,9 – 29,5 Keila – Valkse lõigu rekonstrueerimisega on kavandatud uue III klassi laiusparameetritele ja perspektiivsele koormussagedusele vastava teekatte ehitus. Rekonstrueeritava teelõigu pikkus on 4,7 km. Põhimaanteel on katte laiuseks 9,0 m ja sõiduraja laius 3,5 m. Kõrvalmaanteedel ja tänavatel on katte laiuseks 8,0 m ja sõiduraja laiuseks 3,5 m. Rekonstrueerimise käigus ehitatakse ümber ristmike ja rajatakse uued Keila jõe sillad. Ehitatakse uued jalg- ja jalgrattateed kogupikkuses 1826 m, katte laiusega 2,5-3,0 m. Paigaldatakse uusi liiklusmärke ja korrastatakse teetähistussüsteemi ning ehitatakse uus valgustus. Bussipeatused on projekteeritud tüüpse lahenduse järgi, avatud taskusse, mille laius on 3,8 m. Bussipeatuse laienduse pikkus on 30,0 m. Projektlahendusega on kavandatud kaitsta või tõsta ringi tee-ehitusele ettejäävad tehnovõrgud. Ümber tuleb osaliselt ehitada side- ja elektriliine ning vee- ja kanalisatsiooni trasse. Projekt järgib varasemate projektlahendustega paika pandud plaanilahendusi ja liikluskorralduslikke põhimõtteid. (Estonian)
    0 references
    With the reconstruction of the State Road No 8 Tallinn – Paldiski km 24.9-29.5 Keila – Valkse section, the construction of a new road surface corresponding to the width parameters and the prospective load frequency of Class III is planned. The length of the road section to be reconstructed is 4.7 km. The main road has a width of 9.0 m and the width of the lane 3.5 m. On the secondary roads and on the streets, the width of the cover is 8.0 m and the width of the lane is 3.5 m. In the course of reconstruction, intersections will be rebuilt and new bridges on the Keila River will be built. New foot and bicycle paths will be built for a total length of 1826 m, with a cover width of 2.5-3.0 m. New road signs will be installed and the road marking system will be refurbished and new lighting will be built. Bus stops are designed according to a typical solution, in an open pocket with a width of 3.8 m. The length of the bus stop extension is 30,0 m. The design is designed to protect or elevate the utilities that lie in the road construction. It is necessary to partially rebuild communication and power lines and water and sewerage lines. The project follows the planning solutions and traffic management principles established by previous design solutions. (English)
    16 August 2021
    0 references
    Avec la reconstruction de la route nationale no 8 Tallinn — Paldiski km 24,9-29.5 Keila — Valkse, la construction d’un nouveau revêtement de route correspondant aux paramètres de largeur et à la fréquence de charge prospective de la classe III est prévue. La longueur du tronçon à reconstruire est de 4,7 km. La route principale a une largeur de 9,0 m et la largeur de la voie 3,5 m. Sur les routes secondaires et sur les rues, la largeur du couvert est de 8,0 m et la largeur de la voie est de 3,5 m. Au cours de la reconstruction, des intersections seront reconstruites et de nouveaux ponts sur la rivière Keila seront construits. De nouvelles pistes piétonnes et cyclables seront construites sur une longueur totale de 1 826 m, avec une largeur de couverture de 2,5 à 3,0 m. De nouvelles signalisations routières seront installées, le système de marquage routier sera rénové et un nouvel éclairage sera construit. Les arrêts de bus sont conçus selon une solution typique, dans une poche ouverte d’une largeur de 3,8 m. La longueur de l’extension d’arrêt de bus est de 30,0 m. La conception est conçue pour protéger ou élever les services publics qui se trouvent dans la construction de la route. Il est nécessaire de reconstruire partiellement les lignes de communication et d’électricité et les conduites d’eau et d’assainissement. Le projet suit les solutions de planification et les principes de gestion du trafic établis par les solutions de conception précédentes. (French)
    26 November 2021
    0 references

    Identifiers

    2014-2020.10.01.001.01.15-0005
    0 references