(Created claim: summary (P836): Le projet est divisé en trois volets: 1. Analyse de l’emplacement et de la capacité optimales d’une éventuelle usine de biogazéification dans la région de Kajaani. Identification des sources de matières premières et analyse du contenu et de la faisabilité des aliments pour animaux. Tests de digestion et examens des aliments nettoyés. L’utilisation des résidus de digestion de la plante comme engrais dans les champs sera également étudiée. Ces inf...) |
(Changed label, description and/or aliases in en: Setting new description) |
||
description / en | description / en | ||
Project Q3748790 in | Project Q3748790 in Finland |
Revision as of 09:57, 26 November 2021
Project Q3748790 in Finland
Language | Label | Description | Also known as |
---|---|---|---|
English | Biogasification Plant Preparation Project |
Project Q3748790 in Finland |
Statements
43,020 Euro
0 references
43,020.0 Euro
0 references
100.0 percent
0 references
19 June 2014
0 references
31 December 2015
0 references
JAHOTEC OY
0 references
87100
0 references
Hanke jakautuu kolmeen osa-alueeseen:1. Mahdollisen biokaasutuslaitoksen optimaalisen sijainnin ja kapasiteetin selvittäminen Kajaanin alueella. Raaka-ainelähteiden kartoittaminen, sekä syötteiden sisällön ja hyödyntämiskelpoisuuden tutkiminen. Selvitettyjen syötteiden mädätystestit ja tutkimukset. Selvitetään myös tehtaan mädätysjäännöksen käyttö lannoitteena peltoihin. Näiden tietojen pohjalta saadaan tietoa siitä mihin laitos tulisi sijoittaa niin taloudelliset kuin logistiset näkökulmat huomioiden. Laitoksen koko määräytyy alueella olevien käyttökelpoisten syötteiden määrän perusteella.2. Yhteistyöverkoston selvitys, energiaselvitys3. Esisuunnitelman laatiminen, strateginen liiketoimintamalli (Finnish)
0 references
The project is divided into three strands:1. Analysis of the optimal location and capacity of a possible biogasification plant in the Kajaani region. Identification of raw material sources, and analysis of the content and feasibility of feeds. Digestion tests and examinations of cleared feeds. The use of the plant’s digestion residue as fertiliser in fields will also be investigated. This information provides information on where the plant should be located, taking into account both financial and logistical aspects. The size of the installation is determined by the number of usable inputs in the area.2. Study of the cooperation network, energy study3. Preparation of a pre-plan, strategic business model (English)
22 November 2021
0 references
Le projet est divisé en trois volets: 1. Analyse de l’emplacement et de la capacité optimales d’une éventuelle usine de biogazéification dans la région de Kajaani. Identification des sources de matières premières et analyse du contenu et de la faisabilité des aliments pour animaux. Tests de digestion et examens des aliments nettoyés. L’utilisation des résidus de digestion de la plante comme engrais dans les champs sera également étudiée. Ces informations fournissent des informations sur l’emplacement de l’usine, en tenant compte des aspects financiers et logistiques. La taille de l’installation est déterminée par le nombre d’intrants utilisables dans la zone.2. Étude du réseau de coopération, étude sur l’énergie3. Préparation d’un modèle d’entreprise stratégique préalable au plan (French)
26 November 2021