Development of social services infrastructure in Smiltene Municipality (Q3058055): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): L’objectif du projet est de développer de nouvelles solutions d’infrastructure pour la fourniture de services sociaux communautaires dans le comté de Smiltene. Dans le cadre du projet, il est prévu de construire deux nouveaux foyers familiaux au 10, rue Galdnieku, Smiltene, un service proche de l’environnement familial pour les enfants laissés sans protection parentale (8 places), offrant un service aux enfants ayant un FT et une maison pour jeu...)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Entwicklung der Infrastruktur für soziale Dienstleistungen in der Grafschaft Smiltene

Revision as of 09:42, 28 November 2021

Project Q3058055 in Latvia
Language Label Description Also known as
English
Development of social services infrastructure in Smiltene Municipality
Project Q3058055 in Latvia

    Statements

    0 references
    0 references
    0 references
    967,982.55 Euro
    0 references
    2,998,830.26 Euro
    0 references
    32.28 percent
    0 references
    1 January 2020
    0 references
    31 December 2022
    0 references
    Smiltenes novada pašvaldība
    0 references
    0 references

    57°25'41.38"N, 25°55'24.13"E
    0 references

    57°25'41.38"N, 25°55'24.13"E
    0 references

    57°24'58.39"N, 25°54'36.72"E
    0 references
    Projekta mērķis ir attīstīt jaunus infrastruktūras risinājumus sabiedrībā balstītu sociālo pakalpojumu sniegšanai Smiltenes novadā. Tā būs iespēja projektā iesaistītajām mērķa grupām saņemt atbalstu funkcionālo traucējumu radīto ierobežojumu pārvarēšanai, bet bērniem augt ģimeniskā vai tai pietuvinātā vidē, ietverot preventīvos pasākumus, lai novērstu institūciju pakalpojumu nepieciešamību.Projekta ietvaros Galdnieku ielā 10, Smiltenē, plānots būvēt divas jaunas ģimenes mājas - ģimeniskai videi pietuvinātu pakalpojumu bērniem, kas palikuši bez vecāku gādības (8 vietas), nodrošinot pakalpojuma sniegšanu bērniem ar FT un jauniešu māju (8 vietas). Kā arī pašvaldības īpašumā esošajā zemes gabalā (kad.nr. 94150011311), kur šobrīd atrodas neizmantotas un pārbūvējamas būves (Dakteru ielā 14A, Smiltenē) plānots pārbūvēt par daudzfunkcionālu pakalpojumu centru, kurā būs iekļauts: dienas aprūpes centrs pilngadīgām personām ar GRT (34 vietas); specializētās darbnīcas pilngadīgām personām ar GRT (24 vietas); dienas aprūpes centrs bērniem (10 vietas) un sociālās rehabilitācijas centrs, kur bērni saņems sociālās rehabilitācijas pakalpojumus (pakalpojuma saņēmēju skaits objektā - vismaz 43 bērni ar FT gada laikā), bet Dakteru ielā 14 B esošo dzīvojamo māju plānots pārbūvēt par 1 grupu dzīvokli 16 personām ar garīga rakstura traucējumiem.Projekta kopējās izmaksas ir 2 998 830,26 Eur, no kurām ERAF finansējums sastāda 32,28% no attiecināmajām izmaksām - 967 982,55 Eur, Valsts budžeta dotācija ir 42 705,11 Eur, bet pašvaldība garantē līdzfinansējumu 66,30% apmērā no projekta attiecināmajām izmaksām jeb 1 988 142,60 Eur.Projektu plānots realizēt no 2020.gada janvāra līdz 2022.gada decembrim. (Latvian)
    0 references
    The aim of the project is to develop new infrastructure solutions for community-based social services in Smiltene Municipality. It will be an opportunity for the target groups involved in the project to receive support for overcoming the limitations of functional disorders, but children to grow up in a family environment or close to it, including preventive measures to prevent the need for institutional services.Within the project, it is planned to build two new family houses – close to family environment services to children left without parental care (8 places), providing service to children with FT and youth house (8 places). As well as in the land plot owned by the municipality (when there are unused and rebuilt buildings (Dakteru iela 14A, Smiltene) it is planned to be rebuilt into a multifunctional service centre, which will include: Day-care centre for adult persons with GRT (34 places); Specialised workshops for adult persons with GRT (24 places); Daycare centre for children (10 places) and social rehabilitation centre, where children will receive social rehabilitation services (number of recipients of the service on the site – at least 43 children with FT per year), but at Dakteru Street 14 B the existing residential house is planned to be rebuilt for 1 group apartment for 16 persons with mental disabilities.The total cost of the project is 2 998 830.26, of which ERDF funding is 32.28 % of eligible costs – EUR 967 982.55, State budget grant is EUR 42705.11. (English)
    15 July 2021
    0 references
    L’objectif du projet est de développer de nouvelles solutions d’infrastructure pour la fourniture de services sociaux communautaires dans le comté de Smiltene. Dans le cadre du projet, il est prévu de construire deux nouveaux foyers familiaux au 10, rue Galdnieku, Smiltene, un service proche de l’environnement familial pour les enfants laissés sans protection parentale (8 places), offrant un service aux enfants ayant un FT et une maison pour jeunes (8 places). Ainsi que sur le terrain appartenant à la municipalité (no 94150011311), où se trouvent actuellement des structures inutilisées et reconstruites (rue Dakteru 14A, Smiltene), il est prévu de reconstruire un centre de services multifonctionnel qui comprendra: garderie pour adultes avec TRG (34 places); ateliers spécialisés pour adultes avec TRG (24 places); garderie pour enfants (10 places) et Centre de réadaptation sociale, où les enfants recevront des services de réadaptation sociale (le nombre de bénéficiaires du service dans l’établissement — au moins 43 enfants avec France Télécom par an), tandis que la maison d’habitation existante de la rue Dakteru 14 B devrait être reconstruite en 1 appartement de groupe pour 16 personnes souffrant de troubles mentaux.Le coût total du projet s’élève à 29 988 030,26 EUR, dont le financement du FEDER s’élève à 32,28 % des coûts éligibles — 96 782,5 EUR, la subvention du budget de l’État s’élève à 42 705,11 EUR, et le gouvernement local garantit le cofinancement du projet à hauteur de 66,30 % des coûts éligibles. (French)
    25 November 2021
    0 references
    Dakteru iela 14A, Smiltene, Smiltenes nov., LV-4729
    0 references
    Dakteru iela 14B, Smiltene, Smiltenes nov., LV-4729
    0 references
    Galdnieku iela 10, Smiltene, Smiltenes nov., LV-4729
    0 references

    Identifiers

    9.3.1.1/19/I/049
    0 references