Energy efficiency improvement and repair of multi-apartment residential house in Šaurā iela 26, Daugavpils (Q3057200): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Dans le cadre du projet «Amélioration et réparation de l’efficacité énergétique d’un immeuble résidentiel à appartements multiples situé au 26, rue Šauras, Daugavpils», des mesures visant à améliorer l’efficacité énergétique du bâtiment et des réparations intérieures sont envisagées. Objectif du projet: contribuer à l’amélioration de l’efficacité énergétique du bâtiment municipal de Daugavpils au 26, rue Šaura, en réduisant la consommation d’éne...)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Verbesserung der Energieeffizienz und Reparatur von Mehrfamilienhäusern in der Straße 26 Šiaura, Daugavpils

Revision as of 09:31, 28 November 2021

Project Q3057200 in Latvia
Language Label Description Also known as
English
Energy efficiency improvement and repair of multi-apartment residential house in Šaurā iela 26, Daugavpils
Project Q3057200 in Latvia

    Statements

    0 references
    0 references
    500,000.0 Euro
    0 references
    588,235.29 Euro
    0 references
    85.0 percent
    0 references
    7 June 2021
    0 references
    6 December 2022
    0 references
    DAUGAVPILS PILSĒTAS DOME
    0 references
    0 references

    55°53'36.06"N, 26°32'49.81"E
    0 references
    Projekta “Daudzdzīvokļu dzīvojamās mājas energoefektivitātes paaugstināšana un remonts Šaurā ielā 26, Daugavpilī” ietvaros ir paredzēti ēkas energoefektivitātes paaugstināšanas pasākumi un iekštelpu remonts. Projekta mērķis: sekmēt Daugavpils pilsētas pašvaldības ēkas Šaurā ielā 26, energoefektivitātes paaugstināšanu, samazinot primārās enerģijas patēriņu.Projekta galvenās darbības:1. Būvdarbu veikšana pašvaldības ēkā Šaurā ielā 261.1. Ārsienu siltināšana,1.2. Cokola siltināšana,1.3. Jumta stāva, jumta pārseguma siltināšana,1.4. Logu un ārdurvju nomaiņa,1.5. Apkures sistēmas rekonstrukcija,1.6. Apgaismojuma nomaiņa.2. Autoruzraudzība.3. Būvuzraudzība.Projekta publicitātes un būves nodošanas ekspluatācijā izmaksas tiks segtas no pašvaldības budžeta.Plānotais projekta īstenošanas ilgums: 18 mēneši no vienošanās parakstīšanas, no 2021.gada II ceturkņa līdz 2022.gada IV ceturksnim.Darbi tika uzsākti 2018.gada 26.septembrī, kad tika noslēgts līgums par būvniecības dokumentācijas izstrādi daudzdzīvokļudzīvojamās mājas Šaurajā ielā 26, Daugavpilī, energoefektivitātes paaugstināšanai un iekštelpu remontdarbiem.Projekta īstenošana nodrošinās pašvaldības sociālās aprūpes iestāžu pakalpojumu kvalitāti un iestāžu ēkas energoefektivitātes paaugstināšanu, kā arī uzlabos ēkas ārējo izskatu un pilsētvides pievilcību.Projekta kopējās izmaksas: EUR 1 604 190.37, t.sk. ERAF finansējums ir EUR 500 000,00.Projekta plānotie rezultāti:•tiks samazināts primārās enerģijas patēriņš un siltumnīcefekta gāzu emisijas, sekmējot ilgtermiņā energoefektivitātes paaugstināšanu un pašvaldības izdevumu samazināšanos par siltumapgādi, •tiks sasniegtas energoefektivitātes prasības atbilstoši Latvijas būvnormatīvā LBN 002-19 “Ēku norobežojošo konstrukciju siltumtehnika”. (Latvian)
    0 references
    Within the framework of the project “Enhancement and repair of energy efficiency of the apartment house at Šaurā iela 26, Daugavpils” the energy efficiency improvement measures of the building and indoor repair are planned. The aim of the project shall be: Promote improvement of energy efficiency of Daugavpils city municipality buildings at Šaurā iela 26, reducing primary energy consumption. Construction works in the municipal building in Šaurā iela 261.1. Insulation of exterior walls,1.2. Cap insulation,1.3. Insulation of roof floor, roof covering,1.4. Replacement of windows and external doors,1.5. Reconstruction of the heating system,1.6. Replacement of illumination.2. Authoritative supervision.3. Construction supervision.The costs of publicity of the project and commissioning of the construction will be covered from the budget of the municipality.The planned duration of the project implementation: 18 months from the signing of the agreement, from fourth quarter of 2021 to IV quarter 2022.Works were started on 26 September 2018, when a contract was signed on the construction documentation development of the apartment apartment house in narrow street 26, Daugavpils, energy efficiency improvement and indoor repair works.The project implementation will ensure the quality of the services of municipal social care institutions and increase the energy efficiency of the building, as well as improve the external appearance of the building and the attractiveness of the urban environment. EUR 1 604 190.37, of which: ERDF funding is EUR 500 000.00.Project’s planned results:•The primary energy consumption and greenhouse gas emissions will be reduced, contributing to the long-term improvement of energy efficiency and reduction of local government expenditure on heating, • the energy efficiency requirements will be achieved in accordance with the Latvian building norm LBN 002-19 “Heat engineering of building envelopes”. (English)
    15 July 2021
    0 references
    Dans le cadre du projet «Amélioration et réparation de l’efficacité énergétique d’un immeuble résidentiel à appartements multiples situé au 26, rue Šauras, Daugavpils», des mesures visant à améliorer l’efficacité énergétique du bâtiment et des réparations intérieures sont envisagées. Objectif du projet: contribuer à l’amélioration de l’efficacité énergétique du bâtiment municipal de Daugavpils au 26, rue Šaura, en réduisant la consommation d’énergie primaire. Travaux de construction dans le bâtiment municipal au 261.1 rue Šiauru. Isolation des murs extérieurs,1.2. Isolation du capuchon, 1.3. Plancher de toit, isolation de revêtement de toit,1.4. Remplacement des fenêtres et des portes extérieures,1.5. Reconstruction du système de chauffage,1.6. Remplacement de l’éclairage.2. Supervision de l’auteur.3. Supervision de la construction.Les coûts de la publicité du projet et de la mise en service de la structure seront couverts par le budget de l’administration locale.La durée prévue du projet: 18 mois à compter de la signature de l’accord, du T2 2021 au T4 2022.Les travaux ont débuté le 26 septembre 2018, date à laquelle un contrat a été signé sur le développement de la documentation de construction dans la rue étroite 26 du bâtiment multi-appartements à Daugavpils, augmentant l’efficacité énergétique et les réparations intérieures.La mise en œuvre du projet assurera la qualité des services sociaux municipaux et augmentera l’efficacité énergétique du bâtiment institutionnel, ainsi que l’aspect extérieur du bâtiment et l’attractivité de l’environnement urbain.Le coût total du projet: 1 604 190,37 EUR, dont: Le financement du FEDER s’élève à 500 000 EUR.Les résultats prévus du projet:•la consommation d’énergie primaire et les émissions de gaz à effet de serre seront réduites, contribuant à l’amélioration à long terme de l’efficacité énergétique et à la réduction des dépenses des administrations locales en matière de chauffage, • les exigences en matière d’efficacité énergétique seront satisfaites conformément à la norme lettone de construction LBN 002-19 «Ingénierie thermique des enveloppes des bâtiments». (French)
    25 November 2021
    0 references
    Šaurā iela 26, Daugavpils, LV-5410
    0 references

    Identifiers

    4.2.2.0/20/I/025
    0 references