Flood control developments on the Neuf Fontaines Creek — construction phase (Q3696410): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Changed label, description and/or aliases in de: translated_label) |
||
label / de | label / de | ||
Hochwasserschutzmaßnahmen am Bach der Neun Brunnen – Bauphase |
Revision as of 16:02, 26 November 2021
Project Q3696410 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Flood control developments on the Neuf Fontaines Creek — construction phase |
Project Q3696410 in France |
Statements
130,345.0 Euro
0 references
619,326.0 Euro
0 references
21.05 percent
0 references
1 February 2016
0 references
31 December 2018
0 references
Syndicat Mixte/Syndicat Intercommunal d’Aménagement de la Chiers et de ses affluents
0 references
A la suite d'importantes inondations en janvier 2009, une étude hydraulique du bassin versant du ruisseau de Neuf Fontaines a défini un programme d'aménagement de protection de la commune de Réhon.La présente opération consiste à réaliser des aménagements de lutte contre les inondations suivants : mise en oeuvre de travaux de renaturation et de confortement des berges, piège à embâcles, et redimensionnement d'une partie du linéaire couvert du ruisseau dans la traversée de Réhon. (French)
0 references
Following major flooding in January 2009, a hydraulic study of the watershed of Neuf Fontaines Creek defined a protection plan for the commune of Réhon.This operation consists of the following flood control projects: implementation of shoreline renaturation and consolidation work, a trap with jams, and resising a portion of the lineline covered by the creek in the Rehon crossing. (English)
22 November 2021
0 references
Identifiers
LO0005755
0 references