Demolition, reconstruction of Schoelcher High School — Tranche 1: Deconstruction, Supporting, Terraces, VRD, Outdoor fittings & Structure second work (Q3687013): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Abriss, Wiederaufbau des Schoelcher-Gymnasiums – Teil 1: Dekonstruktion, Unterstützung, Erdarbeiten, VRD, Außenanlagen & Zweitbau

Revision as of 15:29, 26 November 2021

Project Q3687013 in France
Language Label Description Also known as
English
Demolition, reconstruction of Schoelcher High School — Tranche 1: Deconstruction, Supporting, Terraces, VRD, Outdoor fittings & Structure second work
Project Q3687013 in France

    Statements

    0 references
    18,059,430.35 Euro
    0 references
    42,393,028.99 Euro
    0 references
    42.6 percent
    0 references
    1 January 2017
    0 references
    30 March 2020
    0 references
    COLLECTIVITE TERRITORIALE DE MARTINIQUE
    0 references
    0 references

    14°36'36.50"N, 61°3'56.84"W
    0 references
    97200
    0 references
    En 2006, la Région a retenu la reconstruction du lycée Victor Schoelcher sur son site actuel. En effet, les bâtiments en service ont été construits entre 1933 et 1937. Cette reconstruction a été motivé par l’état de la structure du bâti, l’évolution des dispositions pédagogiques et l’exigence notamment de nouvelles mesures de sécurité et d’accessibilité aux PMR qui ne permettaient pas d’envisager une réhabilitation dans des conditions satisfaisantes de sûreté, de fonctionnalité, de confort, de coût de travaux et de coût de maintenance. Toutefois, la prise en compte de l’indéniable intérêt de cet ensemble architectural de type moderniste a conduit à renforcer la proposition du projet lauréat du concours, d’une conservation et d’une rénovation des bâtiments et escaliers constituant l’entrée historique. Pour mémoire, jusqu’à juin 2016, ce lycée d’enseignement général et technologique accueillait une communauté scolaire regroupée dans 18 bâtiments et composée de 1 426 élèves, 125 enseignants et 75 personnels. La capacité du nouveau lycée sera d’environ 1 400 élèves et étudiants avec un renforcement du post-bac. L’opération comprend la démolition, la reconstruction et la mise en place d’un nouvel équipement aux normes parasismiques. (French)
    0 references
    In 2006, the Region retained the reconstruction of Victor Schoelcher High School at its current site. Indeed, the buildings in service were built between 1933 and 1937. This reconstruction was motivated by the state of the structure of the building, the evolution of educational arrangements and the requirement, in particular, of new safety and accessibility measures for PRMs which did not allow for rehabilitation under satisfactory conditions of safety, functionality, comfort, cost of work and maintenance costs. However, taking into account the undeniable interest of this modernist architectural ensemble has led to strengthening the proposal of the winning project of the competition, for the conservation and renovation of the buildings and staircases constituting the historic entrance. For the record, until June 2016, this school of general and technological education hosted a school community grouped in 18 buildings and composed of 1,426 pupils, 125 teachers and 75 staff. The capacity of the new high school will be about 1,400 students with a reinforcement of the post-bac. The operation includes the demolition, reconstruction and installation of new seismic equipment. (English)
    18 November 2021
    0 references

    Identifiers

    MQ0015413
    0 references