Creation of a basis for re-employment and diversification of Emmaus’ activities Challenge for a significant impact in the fight against large exclusion. ERDF aid will intervene on phase 1 of the work (Q139588): Difference between revisions
Jump to navigation
Jump to search
(Changed claim: French Kohesio ID (P843): IF0009109) |
(Changed label, description and/or aliases in de: translated_label) |
||
label / de | label / de | ||
Schaffung einer Basis für die Wiederverwendung und Diversifizierung der Aktivitäten von Emmaus Herausforderung für erhebliche Auswirkungen auf die Bekämpfung der großen Ausgrenzung.Die EFRE-Unterstützung wird in Phase 1 der Arbeiten |
Revision as of 13:30, 26 November 2021
Project Q139588 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Creation of a basis for re-employment and diversification of Emmaus’ activities Challenge for a significant impact in the fight against large exclusion. ERDF aid will intervene on phase 1 of the work |
Project Q139588 in France |
Statements
900,000.0 Euro
0 references
2,877,907.0 Euro
0 references
31.27 percent
0 references
1 June 2017
0 references
31 October 2018
0 references
EMMAUS DEFI - FONDATEUR ABBE PIERRE
0 references
75019
0 references
Cette opération a pour objet le cofinancement de la phase 1 des travaux d’aménagement et de réhabilitation des surfaces non utilisés par Emmaüs Défi dans ses locaux situé au cœur du quartier riquet-stalingrad. Emmaus utilise actuellement l’ensemble du rez-de-chaussée de Riquet, la quasi-totalité du niveau -1 et quelques places de parking pour les camions au niveau -2. Des surfaces sont inutilisées : environ 500 m² au niveau -1 et environ 5000 m² aux niveaux -2 et -3. (French)
0 references
The purpose of this operation is to co-finance Phase 1 of the renovation and rehabilitation of areas not used by Emmaus Défi in its premises located in the heart of the Riquet-stalingrad district. Emmaus currently uses the entire ground floor of Riquet, almost all of the -1 level and a few parking spaces for trucks at the -2 level. Surfaces are unused: About 500 m² on level -1 and about 5000 m² on levels -2 and -3. (English)
2 October 2020
0 references
0 references
Identifiers
IF0009109
0 references
4950
0 references