Method of repairing steel piping bridges (Q3750604): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project will design a pre-ideal method for extending the service life of steel pipe bridges by means of renovation. The method can be renovated at a reasonable cost from a pipe bridge or drum without having to replace/repair it in its entirety. The method and its details are designed in such a way that they are used efficiently and inexpensive in industrial production. The correction method will be tested under laboratory conditions and then...) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Method of repairing steel piping bridges |
Revision as of 22:52, 22 November 2021
Project Q3750604 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Method of repairing steel piping bridges |
Project Q3750604 in France |
Statements
14,200 Euro
0 references
14,200.0 Euro
0 references
100.0 percent
0 references
1 February 2017
0 references
31 August 2018
0 references
OY LATIUM LTD
0 references
33100
0 references
Hankkeessa suunnitellaan valmiiksi ideatason menetelmä teräksisten putkisiltojen käyttöiän pidentämiseksi peruskorjauksen avullla. Menetelmän avulla voidaan kohtuullisin kustannuksin peruskorjata putkisilta tai rumpu tarvitsematta vaihtaa/korjata sitä kokonaisuudessaan.Menetelmä ja sen yksityiskohdat suunnitellaan valmiiksi siten, että niiden käyttö on tehokasta ja teollinen valmistaminen edullista. Korjausmenetelmä koekuormitetaan laboratorio-olosuhteissa ja sen jälkeen toteutetaan pilottikohde yhdessä ELY-tieyksikön kanssa. (Finnish)
0 references
The project will design a pre-ideal method for extending the service life of steel pipe bridges by means of renovation. The method can be renovated at a reasonable cost from a pipe bridge or drum without having to replace/repair it in its entirety. The method and its details are designed in such a way that they are used efficiently and inexpensive in industrial production. The correction method will be tested under laboratory conditions and then a pilot site will be implemented together with the ELY Road Unit. (English)
22 November 2021
0 references