Q3749975 (Q3749975): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes) |
(Created claim: summary (P836): An additional building of 950 m² will be built in the hall of Marttilakatu 12 at the gateway, which will be equipped with the components to be stored in the future and thus free from the current hall floor space for actual production. The new building will also be equipped with a 3D Coordinate Measuring Machine. During the next two years, the company’s products and technology will also be promoted at major events in the field., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
An additional building of 950 m² will be built in the hall of Marttilakatu 12 at the gateway, which will be equipped with the components to be stored in the future and thus free from the current hall floor space for actual production. The new building will also be equipped with a 3D Coordinate Measuring Machine. During the next two years, the company’s products and technology will also be promoted at major events in the field. (English) | |||||||||||||||
Property / summary: An additional building of 950 m² will be built in the hall of Marttilakatu 12 at the gateway, which will be equipped with the components to be stored in the future and thus free from the current hall floor space for actual production. The new building will also be equipped with a 3D Coordinate Measuring Machine. During the next two years, the company’s products and technology will also be promoted at major events in the field. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: An additional building of 950 m² will be built in the hall of Marttilakatu 12 at the gateway, which will be equipped with the components to be stored in the future and thus free from the current hall floor space for actual production. The new building will also be equipped with a 3D Coordinate Measuring Machine. During the next two years, the company’s products and technology will also be promoted at major events in the field. (English) / qualifier | |||||||||||||||
point in time: 22 November 2021
|
Revision as of 22:45, 22 November 2021
Project Q3749975 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3749975 in France |
Statements
130,645 Euro
0 references
130,645.0 Euro
0 references
100.0 percent
0 references
20 June 2016
0 references
30 June 2018
0 references
RUNTECH SYSTEMS OY
0 references
48600
0 references
Nykyisen Marttilankatu 12:n hallin yhteyteen rakennetaan yhdyskäytävällä 950 m2:n kokoinen lisärakennus, johon sijoitetaan jatkossa varastoitavat komponentit ja siten vapautetaan nykyisestä hallista lattiatilaa varsinaiselle tuotannolle. Uuteen rakennukseen sijoitetaan myös tulevan tavaran vastaanottotarkastuspiste, joka varustetaan 3D-koordinaattimittauskoneella.Seuraavan kahden vuoden aikana panostetaan myös yhtiön tuotteiden ja teknologian markkinoimiseen alan tärkeimmissä tapahtumissa. (Finnish)
0 references
An additional building of 950 m² will be built in the hall of Marttilakatu 12 at the gateway, which will be equipped with the components to be stored in the future and thus free from the current hall floor space for actual production. The new building will also be equipped with a 3D Coordinate Measuring Machine. During the next two years, the company’s products and technology will also be promoted at major events in the field. (English)
22 November 2021
0 references