Optimisation of cold and ice water production and air treatment capacity (Q3712217): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q3775962 / rank | |||
Normal rank |
Revision as of 19:07, 24 November 2021
Project Q3712217 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Optimisation of cold and ice water production and air treatment capacity |
Project Q3712217 in France |
Statements
13,547.54 Euro
0 references
67,737.82 Euro
0 references
20.0 percent
0 references
1 January 2019
0 references
31 December 2019
0 references
Capsugel France
0 references
Dans le cadre de l'évolution du site vers de nouveaux produits, l'usine Capsugel de Colmar appartenant au groupe Lonza, se dote d'une nouvelle centrale de traitement d'air ainsi qu'une nouvelle production d'eau glacée. Les moteurs de la CTA seront pilotés avec variateur de vitesse et une partie du rafraichissement sera assurée en free-cooling. La nouvelle production d'eau glacée utilisera un nouveau fluide HFO avec un impact sur l'environnement moindre par rapport aux fluides classiques en cas de fuite. L'installation comprendra également un nouveau ballon de stockage d'eau glacée qui permettra de lisser les pics de besoin du process et donc de diminuer les démarrages des groupes froids, améliorant ainsi les performances globales annuelles de la centrale de production d'eau glacée. (French)
0 references
As part of the site’s evolution towards new products, the Capsugel plant in Colmar belonging to the Lonza Group has acquired a new air treatment plant and a new production of ice water. The engines of the CTA will be driven with variable speed and part of the refreshment will be provided in free-cooling. The new production of ice water will use a new HFO fluid with less impact on the environment compared to conventional fluids in case of leakage. The facility will also include a new ice-water storage tank that will smooth the process’s peaks and thus reduce cold group start-ups, thus improving the annual overall performance of the Ice Water Plant. (English)
22 November 2021
0 references
Identifiers
AL0025243
0 references