TERRITORIAL ANIMATION OF THE PLAICE MP IS (Q3705503): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q3769539 / rank | |||
Normal rank |
Revision as of 18:56, 24 November 2021
Project Q3705503 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | TERRITORIAL ANIMATION OF THE PLAICE MP IS |
Project Q3705503 in France |
Statements
234,943.62 Euro
0 references
470,546.0 Euro
0 references
49.93 percent
0 references
1 January 2018
0 references
31 December 2020
0 references
CIOTAT EMPLOI INITIATIVES
0 references
Afin de répondre aux enjeux territoriaux énoncés ci-dessus, le projet d’animation du PLIE se décline autour des axes de travail suivants : * Renforcer l’ancrage territorial du dispositif et le partenariat avec les acteurs de l’emploi et de l’insertion : la politique de la Ville notamment dans le cadre du Plan de lutte contre les discriminations, la Mission Locale du Canton de La Ciotat et les agences Pole Emploi d’Aubagne et La Ciotat par une mise en réseau des acteurs visant à l’émergence de projets innovants. * Contribuer à réduire les inégalités par la mise en place d’actions concrètes visant à promouvoir l’égalité femmes/hommes et l’emploi des seniors * Articuler les actions d’insertion et de développement économique par la promotion de la création d’activité, de la Responsabilité Sociale des Entreprises et par la mise en place d’actions de formation et de préparation collective aux métiers qui recrutent. * Participer aux différentes instances et événements où se retrouvent les acteurs partenaires du PLIE: réunions du SPEL, assemblées générales de structures bénéficiaires… * Observer les évolutions territoriales, analyser les besoins, évaluer les actions et informer les partenaires des résultats obtenus * Impliquer les parties prenantes du PLIE dans la mise en œuvre opérationnelle du dispositif Concrètement, les acteurs seront associés : • A l’observation du territoire dans lequel s'inscrit le PLIE (et en particulier des opportunités et des freins identifiés pour "l'inclusion active" et l'insertion professionnelle des publics) • Aux réflexions stratégiques et prospectives qui orienteront les priorités du PLIE. • A l'élaboration des projets et des plans d'action opérationnels du PLIE. (French)
0 references
In order to respond to the territorial challenges set out above, the PLIE animation project focuses on the following areas of work: * Strengthening the territorial anchorage of the scheme and the partnership with those involved in employment and integration: the city’s policy, in particular within the framework of the Anti-Discrimination Plan, the Local Mission of the Canton of La Ciotat and the agencies Pole Emploi d’Aubagne and La Ciotat through a networking of actors aimed at the emergence of innovative projects. * Contribute to reducing inequalities by putting in place concrete measures to promote equality between women and men and the employment of seniors * Articulate measures of integration and economic development by promoting activity creation, social responsibility of enterprises and the establishment of training and collective preparation for the professions that recruit. * Participate in the various forums and events where the partners of the PLIE meet: SPEL meetings, general meetings of beneficiary structures... * Observing territorial developments, analysing needs, evaluating actions and informing partners of the results achieved * Involving PLIE stakeholders in the operational implementation of the scheme Concretely, the actors will be involved: • The observation of the territory of the PLIE (and in particular the opportunities and obstacles identified for “active inclusion” and the professional integration of the public) • Strategic and forward-looking reflections that will guide the priorities of the PLIE. • The preparation of PLIE’s operational projects and action plans. (English)
22 November 2021
0 references
Identifiers
201802666
0 references