Renovation of the Corte urban heat network (Q3698368): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project consists of the total renovation of the wood boiler and heat network of Corte to which Corse Bois Energie has been appointed delegate. The key figures for the installation are: — 11 499 MWh of heat delivered to 34 substations (subscribers) — 7 km (3.5 A/R) of underground heat network — Consumption of 5,000 tonnes of wafers per year Heat production will be completely renewed by the installation of 2 wood boilers in cascade of 2.5 and...) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Renovation of the Corte urban heat network |
Revision as of 10:58, 22 November 2021
Project Q3698368 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Renovation of the Corte urban heat network |
Project Q3698368 in France |
Statements
789,371.0 Euro
0 references
3,947,354.81 Euro
0 references
20.0 percent
0 references
23 September 2015
0 references
30 June 2020
0 references
Corse Bois Energie
0 references
Le projet consiste à la rénovation totale de la chaufferie bois et du réseau de chaleur de Corte dont Corse Bois Energie a été désignée délégataire. Les chiffres clefs de l’installation sont : - 11 499 MWh de chaleur livrée à 34 sous-stations (abonnés) - 7 km (3.5 A/R) de réseau de chaleur enterré - Consommation de 5 000 tonnes de plaquettes par an La production de chaleur sera elle totalement renouvelée par l’installation de 2 chaudières bois en cascade de 2.5 et 1 MW de puissance, ainsi que d’une chaudière fioul de 7 MW pour l’appoint et le secours qui devrait fonctionner 5% du temps.. Ce renouvellement aura aussi pour conséquence une amélioration significative des rendements des chaudières bois, les nouvelles chaudières dont le rendement est de 85% viendront en remplacement des anciennes dont le rendement est estimé à 70%. Ces travaux permettront de rendre le réseau de chaleur, et ses sous-stations plus performants. En effet, l’objectif est de faire passer les pertes du réseau de 30% à 20% soit une diminution de 33% des pertes initiales La chaleur actuellement perdue annuellement est de 4780 MWh. L’économie ainsi générée serait de 1578 MWh représentant, en l’état actuel de la chaufferie, 384 tonnes de bois et 31 m3 de fioul ou encore 85 tonnes d’équivalent CO2 par an. Le calendrier estimatif du projet prévoit un début des travaux en janvier 2017 pour s’achever début 2020. (French)
0 references
The project consists of the total renovation of the wood boiler and heat network of Corte to which Corse Bois Energie has been appointed delegate. The key figures for the installation are: — 11 499 MWh of heat delivered to 34 substations (subscribers) — 7 km (3.5 A/R) of underground heat network — Consumption of 5,000 tonnes of wafers per year Heat production will be completely renewed by the installation of 2 wood boilers in cascade of 2.5 and 1 MW of power, as well as a 7 MW fuel boiler for the booster and backup which should operate 5 % of the time. This renewal will also result in a significant improvement in the efficiency of wood boilers, the new boilers whose efficiency is 85 % will replace the old ones whose efficiency is estimated to be 70 %. This work will make the heat network and its substations more efficient. The objective is to increase network losses from 30 % to 20 %, i.e. a 33 % reduction in initial losses. The heat currently lost annually is 4 780 MWh. The savings thus generated would be 1 578 MWh representing, in the current state of the boiler house, 384 tonnes of wood and 31 m³ of fuel oil or 85 tonnes of CO2 equivalent per year. The estimated project schedule foresees a start of work in January 2017 to be completed in early 2020. (English)
22 November 2021
0 references
Identifiers
CO0009692
0 references