Thermal Improvement of 80 apartments in Saint-Dié Kellerman (Q3697897): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Vosgelis built many housing units in the 1970s in the Kellerman district. A previous operation resulted in the isolation of 64 dwellings. This new operation, which is part of an overall QPV schedule, is intended to allow a thermal improvement of 80 dwellings. The objectives are to: — Reduction of tenants’ charges — Providing extra comfort by removing cold walls — Ensure good ventilation of the dwellings — Reducing attractiveness to buildings, tr...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Thermal Improvement of 80 apartments in Saint-Dié Kellerman

Revision as of 10:52, 22 November 2021

Project Q3697897 in France
Language Label Description Also known as
English
Thermal Improvement of 80 apartments in Saint-Dié Kellerman
Project Q3697897 in France

    Statements

    0 references
    297,295.37 Euro
    0 references
    849,415.34 Euro
    0 references
    35.0 percent
    0 references
    1 January 2017
    0 references
    31 December 2020
    0 references
    VOSGELIS OFFICE PUBLIC DE L'HABITAT DU DEPARTEMENT DES VOSGES
    0 references

    48°17'8.59"N, 6°57'30.56"E
    0 references
    88100
    0 references
    Vosgelis a construit de nombreux logements dans les années 70 dans le quartier Kellerman. Une précédente opération a permis d'isoler 64 logements. Cette nouvelle opération qui s'inscrit dans un planning global QPV, doit permettre une amélioration thermique de 80 logements. Les objectifs visés sont les suivants : - Diminution des charges des locataires - Apporter un surplus de confort en supprimant les parois froides - S'assurer d'une bonne ventilation des logements - Redonner de l'attractivité aux bâtiments (French)
    0 references
    Vosgelis built many housing units in the 1970s in the Kellerman district. A previous operation resulted in the isolation of 64 dwellings. This new operation, which is part of an overall QPV schedule, is intended to allow a thermal improvement of 80 dwellings. The objectives are to: — Reduction of tenants’ charges — Providing extra comfort by removing cold walls — Ensure good ventilation of the dwellings — Reducing attractiveness to buildings (English)
    22 November 2021
    0 references

    Identifiers

    LO0018891
    0 references